Search results

Jump to navigation Jump to search

Page title matches

  • - Dec 24 - Jan 1: VACATION and Winter SAD holidays - EIC CD-1 page turns (Jan 6, 8), dry runs (Jan 13-15)
    16 KB (2,501 words) - 15:39, 15 February 2021
  • April 1, 2021 Report - Mar 15 - Apr 9''' - Got COVID-19 vaccine shot number 1 (Moderna)
    18 KB (2,743 words) - 16:38, 7 April 2021
  • August 1, 2019 Report - July 22 - Aug 16 - ADMIN: Ivan Konoplev visit (Jul 31-Aug 1)
    17 KB (2,548 words) - 12:07, 5 August 2019
  • July 1, 2019 Report - June 24 - July 19
    14 KB (2,078 words) - 09:16, 29 July 2019
  • Jan 1 2020 Report - Dec 23 - Jan 17
    9 KB (1,318 words) - 12:25, 21 January 2020
  • 7 KB (1,135 words) - 11:51, 23 January 2020
  • - Travel: Iguazu Falls, Brazil SPC1/OC1 Meeting (Jan 27-Feb 1)
    12 KB (1,871 words) - 09:30, 24 January 2020
  • - Dec 24 - Jan 1: VACATION and Winter SAD holidays - EIC CD-1 page turns (Jan 6, 8), dry runs (Jan 13-15)
    16 KB (2,409 words) - 12:55, 26 January 2021
  • - Dec 24 - Jan 1: VACATION and Winter SAD holidays - EIC CD-1 page turns (Jan 6, 8), dry runs (Jan 13-15)
    16 KB (2,409 words) - 11:51, 5 February 2021

Page text matches

  • [[2019-08-1-LeadershipReports | Aug 1 2019]]<br> [[2019-07-1-LeadershipReports | July 1 2019]]<br>
    1 KB (130 words) - 13:05, 10 January 2020
  • [[2021-4-1-LeadershipReports | Apr 1 2021]]<br> [[2021-1-21-LeadershipReports | Jan 21 2021]]<br>
    1 KB (130 words) - 10:24, 21 December 2021
  • Previous two weeks (Feb 1-15) Next two weeks (Feb 16-Mar 1)
    3 KB (464 words) - 15:23, 7 February 2017
  • Previous two weeks (Feb 1-15) Next two weeks (Feb 16-Mar 1)
    3 KB (464 words) - 11:49, 11 March 2016
  • Next two weeks (May 1-May 12) Next two weeks (May 1-May 12)
    4 KB (527 words) - 09:45, 1 May 2017
  • <li>LDRD review (Jul 1, TS for AB) <li>AB: Vacation 7/1-7/29 (note long vacation)
    1 KB (206 words) - 11:10, 21 July 2015
  • <li>LDRD review (Jul 1, TS for AB) <li>AB: Vacation 7/1-7/29 (note long vacation)
    1 KB (208 words) - 16:33, 20 July 2015
  • Next two weeks (Mar 18-Apr 1) Next two weeks (Mar 18-Apr 1)
    3 KB (426 words) - 16:08, 19 July 2016
  • Next two weeks (Mar 18-Apr 1) Next two weeks (Mar 18-Apr 1)
    3 KB (426 words) - 15:25, 7 February 2017
  • [[2020-1-16-LeadershipReports | Jan 16 2020]]<br> [[2020-1-2-LeadershipReports | Jan 2 2020]]<br>
    1 KB (125 words) - 10:34, 26 January 2021
  • Next two weeks (May 1-May 12) Next two weeks (May 1-May 12)
    4 KB (565 words) - 09:58, 2 November 2017
  • Previous two weeks (Feb 1-15) Previous two weeks (Feb 1-15)
    5 KB (728 words) - 11:44, 11 March 2016
  • 1. Ion polarization: collider injection lattice for spin tracking, orbit corr 1. Start research on Ground Motion Activities at the JLEIC
    2 KB (264 words) - 13:13, 1 August 2016
  • 1. Finished and submitted a proposal to NSF, in which a methodology is propos ...expansion calculation using source particles works for Coulomb potential (1/r), thanks to the
    2 KB (343 words) - 12:06, 11 March 2016
  • - LDRD review (Jul 1, TS for AB) - AB: Vacation 7/1-7/29 (note long vacation)
    2 KB (312 words) - 15:16, 7 February 2017
  • - LDRD review (Jul 1, TS for AB) - AB: Vacation 7/1-7/29 (note long vacation)
    2 KB (313 words) - 16:17, 19 July 2016
  • <li>Preparation for a 1 hour presentation on PIC during the MAP-related bright muon sources phone m <li>Completed RadWorker 1 training
    2 KB (376 words) - 16:30, 8 February 2017
  • <li>Gave a 1 hour presentation on PIC background and recent progress at the MAP-related ...th Vasily (The second new MEIC postdoc, Hisham Sayed, will started on July 1, working on electron cooling. He is in Yves's group)
    3 KB (403 words) - 16:52, 8 February 2017
  • May 1, 2019 Report - Apr 29 - May 24
    2 KB (286 words) - 10:29, 28 May 2019
  • <li>Gave a 1 hour presentation on PIC background and recent progress at the MAP-related <li>The second new MEIC postdoc, Hisham Sayed, will start on July 1, working on electron cooling. (He is in Yves's group)
    3 KB (436 words) - 14:08, 20 July 2015
  • <li>Cooling simulation: (1) The introduction to use the new electron cooling code is finished, which c - Preparing talk for collaboration mtg (Will need (1-2?) slides from Todd, Balsa, Mike, Wei)<br>
    3 KB (450 words) - 15:01, 9 February 2017
  • April 12, 2019 Report - April 1 - April 26 Previous two weeks (Apr 1 - Apr 12)
    11 KB (1,673 words) - 11:08, 29 May 2019
  • ...ittance is unaffected and vertical emittance growth reduced to ~ factor of 1.5.
    3 KB (462 words) - 11:48, 11 December 2017
  • ...CASA staffing (CEBAF Reference Operations Plan, docx)]] (Last updated Sep 1 2018, T. Satogata)
    2 KB (280 words) - 07:54, 24 June 2022
  • Next two weeks (Jan 18 - Feb 1) Next two weeks (Jan 18 - Feb 1)
    10 KB (1,509 words) - 16:01, 23 May 2019
  • February 1 2019 Report - Jan 21 - Feb 15 Previous two weeks (Jan 21 - Feb 1)
    13 KB (2,077 words) - 11:37, 19 September 2019
  • February 15 2019 Report - Feb 4 - March 1 Next two weeks (Feb 18 - March 1)
    14 KB (2,116 words) - 12:29, 19 September 2019
  • - Dec 24 - Jan 1: VACATION and Winter SAD holidays - EIC CD-1 page turns (Jan 6, 8), dry runs (Jan 13-15)
    16 KB (2,409 words) - 12:55, 26 January 2021
  • - Dec 24 - Jan 1: VACATION and Winter SAD holidays - EIC CD-1 page turns (Jan 6, 8), dry runs (Jan 13-15)
    16 KB (2,409 words) - 11:51, 5 February 2021
  • Weekly Report (May 1 to 15, 2015)
    2 KB (246 words) - 13:22, 20 July 2016
  • - Dec 24 - Jan 1: VACATION and Winter SAD holidays - EIC CD-1 page turns (Jan 6, 8), dry runs (Jan 13-15)
    16 KB (2,501 words) - 15:39, 15 February 2021
  • ...ng dynamic simulation. The whole process is now divided into four parts: (1) Generate sample ions, (b) Calculate the expansion rate, (c) Apply kicks, (
    2 KB (323 words) - 15:21, 9 February 2017
  • ...expansion calculation using source particles works for Coulomb potential (1/r), thanks to the
    2 KB (360 words) - 14:57, 20 July 2016
  • - EIC CD-1 review (Jan 26-29) '''Next two weeks (Feb 1 - Feb 12)'''
    19 KB (2,863 words) - 14:50, 19 February 2021
  • ...dodecapole harmonic may be necessary to increase the angular spread up to 1 02 mrad.
    2 KB (340 words) - 11:19, 9 February 2017
  • March 1 2019 Report - Feb 18 - March 15 Previous two weeks (Feb 18 - March 1)
    17 KB (2,607 words) - 14:47, 19 September 2019
  • March 18, 2021 Report - Mar 1 - Mar 26''' '''Previous two weeks (Mar 1 - Mar 12)'''
    19 KB (2,832 words) - 11:13, 29 March 2021
  • Previous two weeks (Aug 21-Sep 1) - VACATION: Aug 23-Sep 1
    12 KB (1,856 words) - 09:57, 7 September 2017
  • ** Randy approved last week; signing offer letter today; start about Apr 1
    2 KB (314 words) - 08:18, 18 March 2019
  • February 18, 2021 Report - Feb 1 - Feb 26''' '''Previous two weeks (Feb 1 - Feb 12)'''
    21 KB (3,352 words) - 11:01, 4 March 2021
  • - PERS: Medical leave (Jul 25, Aug 1)
    3 KB (392 words) - 14:57, 7 February 2017
  • <li>Error study with sigma = 1 mm of misalignment (Former: sigma = 0.3 mm)
    3 KB (408 words) - 11:28, 9 February 2017
  • - VACATION: Oct 1-9
    3 KB (411 words) - 15:21, 7 February 2017
  • - VACATION: Oct 1-9
    3 KB (411 words) - 16:09, 19 July 2016
  • '''Next two weeks (Mar 1 - Mar 12)''' - ADMIN APS DPB Exec Committee Quarterly (Mar 1)
    23 KB (3,503 words) - 11:13, 16 March 2021
  • - PERS: Vacation (Sep 1-2)
    3 KB (448 words) - 14:53, 7 February 2017
  • 1. Mid month activities were centered around the Large Dynamic Range Wire-sca ...from the lab to industry to the graduate students on May 13. Kevin gave a 1 hour lecture titled "Boron Nitride Nanotube; from the Lab to the Factory -
    7 KB (1,139 words) - 15:27, 13 February 2017
  • - JLEIC R&D talk preparation and travel (Nov 28-Dec 1)
    3 KB (467 words) - 14:43, 7 February 2017
  • - Vacation (July 1)
    3 KB (485 words) - 15:48, 19 July 2016
  • - Vacation (July 1)
    3 KB (485 words) - 15:31, 7 February 2017
  • - JLEIC R&D talk preparation and travel (Nov 28-Dec 1)
    3 KB (490 words) - 14:40, 7 February 2017
  • 1) Keeping Hall B (HPS) on line with beam tuning on weekends; setup duration
    3 KB (548 words) - 12:09, 11 March 2016
  • ...next EIC collaboration meeting, Likely dates look like Mar 25-29 or Apr 1-5. Please let Yuhong know asap if you have a strong preference for one w
    3 KB (551 words) - 10:53, 16 January 2019
  • - Present talk on ‘ RF issues of Low Energy Muon Acceleration’ at 1-st Muon Collider Community mtg. - Attended IPAC with 1 contributed talk and 2 posters
    9 KB (1,379 words) - 14:40, 8 June 2021
  • - OPS Daily 08:00, weekly W 1:30 - OPS Daily 08:00, weekly W 1:30; TAC48 meeting, review PAC proposals for Hall D
    12 KB (1,780 words) - 13:43, 13 July 2020
  • - OPS Daily 07:45/08:00, weekly W 1:30 - OPS Daily 07:45/08:00, weekly W 1:30
    12 KB (1,835 words) - 08:13, 15 September 2020
  • *Leave Without Pay - New return date: Aug. 1 ...ow energy spread, next year we will have to deliver parity quality beam at 1 pass while running at 5 pass in other halls. Discussions about this have st
    12 KB (1,875 words) - 09:45, 11 June 2018
  • - OPS Meetings (08:00 daily, BTeam, 1:30 Weds SAD, PAC49 TAC Jun 7) ...from all six available channels with wire sweeping events at approximately 1 Hz rep rate. Worked with vendor's MATLAB data parser to extract saved
    14 KB (2,077 words) - 10:11, 9 July 2021
  • -Dust particle transport - Reviewed again a few papers and made a work plan: (1) calculate the transverse frequency of the particle; (2) calculate the time ...- The RF gradient optimization paper is rejected. But I feel the reviewer #1 does not understand our paper. Most suggestion from him/her was actually in
    8 KB (1,250 words) - 15:43, 24 January 2018
  • ...ng with trueX<0.01, trueQ2<10.0(Q2>1), and with status==1, each event have:1 scattered electron and either an e+e- pair or a mu+mu- pair. After cutting ...ch length and constant vary momentum. The results are summarized in Table 1. If we use a round beam, we see severe reduction of proton beam current wit
    13 KB (2,068 words) - 10:31, 19 April 2018
  • - OPS Meetings (08:00 daily, BTeam, 1:30 Weds SAD) - VACATION May 28, June 1
    16 KB (2,344 words) - 11:20, 30 June 2021
  • April 1, 2021 Report - Mar 15 - Apr 9''' - Got COVID-19 vaccine shot number 1 (Moderna)
    18 KB (2,743 words) - 16:38, 7 April 2021
  • power of the H- linac and beam current needed to reach 1 MW average power, and start running PyORBIT simulations - Working on getting the Magnetron installed in LERF Lab 1
    14 KB (2,141 words) - 16:11, 1 July 2019
  • <li>Cooling theory study - Read Chapter 1.1 (till page 20) of Slava’s thesis and made slides on the contents. Had a t ...he Coulomb interaction of non-Gaussian beams. The proposed work includes:  1. Investigate parallel FMM framework: pkifmm and exafmm; 2. Select one of th
    4 KB (686 words) - 11:33, 7 March 2017
  • - OPS Meetings (08:00 daily, BTeam, 1:30 Weds SAD) - OPS Meetings (08:00 daily, BTeam, 1:30 Weds SAD)
    19 KB (2,832 words) - 14:25, 5 May 2021
  • power of the H- linac and beam current needed to reach 1 MW average power, and start running PyORBIT simulations - Working on getting the Magnetron installed in LERF Lab 1
    15 KB (2,340 words) - 10:00, 25 June 2019
  • - EIC Collaboration Worskhop (Oct 7-9), dry runs (Oct 1), training (Oct 5) - UITF fun. Run 1 ongoing; beam delivered to HDice with successful alignment to the IBC solen
    17 KB (2,585 words) - 09:52, 2 November 2020
  • - EIC Collaboration Worskhop (Oct 7-9), dry runs (Oct 1), training (Oct 5) ...ts from the first two bullet points are in reasonable agreement (factor of 1.5).
    17 KB (2,608 words) - 16:48, 19 November 2020
  • - EIC Collaboration Worskhop (Oct 7-9), dry runs (Oct 1), training (Oct 5) - UITF fun. Run 1 ongoing; beam delivered to HDice with successful alignment to the IBC solen
    18 KB (2,707 words) - 11:44, 2 November 2020
  • - ADMIN: Attend ARIES Muon Collider Workshop (Jul 1-3, Padova) *Out of town 6/29 to 7/1.
    13 KB (1,979 words) - 14:24, 9 July 2018
  • *Dynamical beta studies. Theory and simulations match with an overall 1.27 factor (not sure why yet..) ...varying RF with cooling simulation to confirm the idea. A simulation of (1) for DC cooling on the proton beam during injection has been done. But I ha
    16 KB (2,424 words) - 10:43, 11 October 2017
  • ...comparing with previous job, the “Numba” based “Crab Kick” codes can save 1/5 time than the old code for 4000
    6 KB (916 words) - 10:00, 31 May 2019
  • - Completing Radworker 1 training. ...new lab is set up - and we have no date for that. I am maintaining the 1 kW run and will move ahead to use
    17 KB (2,553 words) - 11:31, 12 March 2020
  • ...th 1 Hz and more sporadic wire sweeping events. Vendor will return on July 1 with software updates and for discussion on issues that have arisen during ...- Laser particle counter: Continued data analysis of 6-channel data with 1-2 Hz wire sweeping rate. Vendor visit on July 6 focused on observation of d
    16 KB (2,472 words) - 11:04, 15 July 2021
  • **Out of town 6/29 to 7/1. ...r each ion according to the electrons inside the same box. Codes for step (1) and (2) are finished. <br><br>
    14 KB (2,242 words) - 15:11, 25 June 2018
  • - Prepping slides for contributions to the two 1-day workshops I'm attending before ICALEPCS (one on Jupyter notebooks the o ...-beam effect - Finished debugging BB3D. I have make sure the revised code: 1. Load the map correctly, 2. Applied the map directly on particles correctly
    14 KB (2,116 words) - 16:10, 27 September 2019
  • ...ient calculation; and (3) further improve DA efficiency. To test solution (1), I revised the FMM framework so that a full tree of boxes for a given leve
    12 KB (1,837 words) - 09:08, 31 May 2018
  • - Prepping slides for contributions to the two 1-day workshops I'm attending before ICALEPCS (one on Jupyter notebooks the o ...-beam effect - Finished debugging BB3D. I have make sure the revised code: 1. Load the map correctly, 2. Applied the map directly on particles correctly
    14 KB (2,195 words) - 16:20, 27 September 2019
  • - Prepping slides for contributions to the two 1-day workshops I'm attending before ICALEPCS (one on Jupyter notebooks the o ...-beam effect - Finished debugging BB3D. I have make sure the revised code: 1. Load the map correctly, 2. Applied the map directly on particles correctly
    14 KB (2,201 words) - 11:40, 23 September 2019
  • ...y. The following figures show the benchmark for the symplectic tracking of 1,000,000 turns using the first generating function. Our code agrees well wit ** FEL 01/02 (1/4 + full C50 modules) were cooled down - this was major effort by a number
    12 KB (1,797 words) - 09:36, 6 August 2018
  • - VACATION 1/2 day Fri 03/20, 1/2 day Mon 03/23
    15 KB (2,270 words) - 10:05, 6 April 2020
  • - VACATION (1/2 day Nov 25) - Presented timeline for Year 1 milestones
    15 KB (2,217 words) - 12:59, 12 January 2021
  • - Results shows that we should go with shorter bunch length ~ 1 cm. ...e for 100 circles are still much shorter than the time step (0.1 second to 1 second) in a typical cooling
    15 KB (2,342 words) - 15:37, 18 October 2019
  • - VACATION: Mon Mar 5, SICK: 1/2 Tue Mar 6, Wed Mar 7 ...upling section. And Michael Borland agree to make an upgrade on ELEGANT in 1-2 weeks for the JLEIC lattice simulation.
    14 KB (2,152 words) - 16:30, 2 April 2018
  • - EIC CD-1 Celebration (Jul 16) ...- Laser particle counter: Continued data analysis of 6-channel data with 1-2 Hz wire sweeping rate. Vendor visit on July 6 focused on observation of d
    16 KB (2,407 words) - 12:53, 12 August 2021
  • - OPS Daily 07:45/08:00, weekly W 1:30 manuscript within 1--2 weeks.
    18 KB (2,646 words) - 13:37, 8 October 2020
  • August 1, 2019 Report - July 22 - Aug 16 - ADMIN: Ivan Konoplev visit (Jul 31-Aug 1)
    17 KB (2,548 words) - 12:07, 5 August 2019
  • Jan 1 2020 Report - Dec 23 - Jan 17
    9 KB (1,318 words) - 12:25, 21 January 2020
  • ...giving our injector staff what I believe to be some useful perspective on (1) what it means to measure something, and (2) how important it is to keep in
    7 KB (1,156 words) - 10:51, 21 August 2017
  • - Vacation (June 1-5th)
    10 KB (1,536 words) - 09:54, 10 July 2020
  • - RADSMA: TN summarizing work for year 1 of SBIR submitted ...e positive event rates. Prior to and during the 8/19 visit, channels 0 and 1 could not be adjusted to give clean event signals using methods that improv
    17 KB (2,614 words) - 10:40, 13 September 2021
  • - Vacation (June 1-5th)
    10 KB (1,464 words) - 11:53, 30 July 2020
  • work will be done in the LERF lab 1.
    9 KB (1,349 words) - 11:23, 29 May 2019
  • - OPS Meetings (08:00 daily, BTeam, 1:30 Weds SAD) - OPS Meetings (08:00 daily, BTeam, 1:30 Weds SAD)
    20 KB (3,092 words) - 14:12, 11 May 2021
  • ...rrection in IR of ion collider ring . Here we think of a first dipole with 1 meter length and two correction layer, which follows by a 0.5 meter correct
    10 KB (1,571 words) - 10:00, 14 May 2018
  • - Travel: Iguazu Falls, Brazil SPC1/OC1 Meeting (Jan 27-Feb 1)
    12 KB (1,871 words) - 09:30, 24 January 2020
  • - MGMT JLAAC (Dec 1-3), JLAAC prep and dry runs
    14 KB (2,062 words) - 10:07, 23 December 2021
  • - MGMT JLAAC (Dec 1-3), JLAAC prep and dry runs
    14 KB (2,075 words) - 10:26, 24 January 2022
  • - Complete proposal (due May 1, needs to be submitted sooner)
    14 KB (2,075 words) - 13:57, 27 April 2020
  • - OPS Daily 07:45/08:00, weekly W 1:30
    14 KB (2,057 words) - 11:30, 16 September 2020
  • ...d sub-Panel: '''I have completed the short version of the ERL sub-Panel (5 1/2 pages) and it has been integrated into the ~40 pages ERL Roadmap. This h
    13 KB (2,013 words) - 13:07, 10 November 2021
  • - AI Lunch Series (coordination and prep for 1-year celebration)
    13 KB (2,006 words) - 10:27, 2 March 2020
  • July 1, 2019 Report - June 24 - July 19
    14 KB (2,078 words) - 09:16, 29 July 2019
  • - Results shows that we should go with shorter bunch length ≈ 1 cm.
    14 KB (2,049 words) - 12:15, 25 November 2019
  • - Arc 1 isochronous lattices for the Machine startup (based on Dec’19 M56 data)
    15 KB (2,201 words) - 12:29, 5 May 2020
  • ** OPS: Arc 1 optics with 6 m disp. re-design
    13 KB (1,886 words) - 07:08, 21 August 2018
  • ** OPS: Arc 1 optics with 6 m disp. re-design
    13 KB (1,886 words) - 16:57, 20 December 2018
  • into same RHIC lattice, the spin tracking from 1 turn to 2000 turns was carried out and the spin resonance-strength was
    15 KB (2,228 words) - 13:12, 10 December 2019
  • ...ian distribution under strong cooling. I run the turn-by-turn tracking for 1 minutes and 10 minutes. Unfortunately, no obvious deviation from Gaussian
    13 KB (1,957 words) - 10:50, 14 November 2017
  • - Present talk on ‘ RF issues of Low Energy Muon Acceleration’ at 1-st Muon Collider Community mtg.
    16 KB (2,513 words) - 15:34, 8 June 2021
  • - Cooling theory study - Read Chapter 1.1 (till page 20) of Slava’s thesis and made slides on the contents. Had a t ...he Coulomb interaction of non-Gaussian beams. The proposed work includes:  1. Investigate parallel FMM framework: pkifmm and exafmm; 2. Select one of th
    14 KB (2,037 words) - 10:04, 3 November 2017
  • ...e positive event rates. Prior to and during the 8/19 visit, channels 0 and 1 could not be adjusted to give clean event signals using methods that improv
    15 KB (2,368 words) - 14:24, 9 September 2021
  • introduced into same RHIC lattice, the spin tracking from 1 turn to 2000 turns was carried out and the spin resonance-strength was
    15 KB (2,326 words) - 11:07, 7 January 2020
  • ...RL sub-Panel:'''I have completed the short version of the ERL sub-Panel (5 1/2 pages) and it has been integrated into the ~40 pages ERL Roadmap. This h
    16 KB (2,463 words) - 10:59, 8 December 2021
  • -Haipeng sent 1- and 2-cell CEBAF separator cavities
    14 KB (2,147 words) - 10:10, 30 October 2017
  • - ADMIN: Stephen Webb (Radiasoft) 1-day visit (Aug 27) - Preparation and presentation of two 1.5 hour lectures at the CFNS summer school
    16 KB (2,424 words) - 10:18, 22 August 2019
  • 1:00 PM - 2:00 PM.
    16 KB (2,491 words) - 10:31, 28 October 2021
  • ...- Laser particle counter: Continued data analysis of 6-channel data with 1-2 Hz wire sweeping rate. Vendor visit on July 6 focused on observation of d
    17 KB (2,525 words) - 16:57, 20 August 2021
  • ...zation of the probability distribution for exit energies and angles for 13.1 MeV/u lead ions passing observed. But there are some issues left in the test: (1) cooling is artificially strengthened for demonstration;
    20 KB (2,997 words) - 16:23, 24 July 2019
  • ...zation of the probability distribution for exit energies and angles for 13.1 MeV/u lead ions passing observed. But there are some issues left in the test: (1) cooling is artificially strengthened for demonstration;
    21 KB (3,092 words) - 11:25, 5 August 2019