Difference between revisions of "Accelerator PQB Meetings"
Jump to navigation
Jump to search
Line 4: | Line 4: | ||
# Joe Grames: | # Joe Grames: | ||
## RTP test setup at UITF laser table | ## RTP test setup at UITF laser table | ||
− | ## Laser table surface area measurements | + | ## Laser table surface area measurements (space available for new HV Driver) |
## Install new Hall D IA at CEBAF | ## Install new Hall D IA at CEBAF | ||
# Ryan Bodenstein: Fast Feedback (FFB) system resurrection (Task 10) | # Ryan Bodenstein: Fast Feedback (FFB) system resurrection (Task 10) |
Revision as of 16:24, 10 October 2023
2023
Upcoming updates:
- Joe Grames:
- RTP test setup at UITF laser table
- Laser table surface area measurements (space available for new HV Driver)
- Install new Hall D IA at CEBAF
- Ryan Bodenstein: Fast Feedback (FFB) system resurrection (Task 10)
- Ciprian Gal:
- Beam Modulation (Task 12)
- Halo Monitors in Hall A (Task 17)
- New BPM Digital Receivers in Hall A line – instead of Sample/Hold cards (Task 19)
- New BCMs electronics in Hall A line (Task 20)
2019
- May 3, 2019 - PQB source/injector setup for Summer 2019 PREX-II Run
- PQB Meeting April 18, 2019 - BPM readout meeting
- PQB Meeting March 6, 2019 - Moller Quality Beam meeting
2018
2017
2016
2015