Difference between revisions of "Accelerator PQB Meetings"
Jump to navigation
Jump to search
Line 20: | Line 20: | ||
## New BPM Digital Receivers in Hall A line – instead of Sample/Hold cards (Task 19) | ## New BPM Digital Receivers in Hall A line – instead of Sample/Hold cards (Task 19) | ||
## New BCMs electronics in Hall A line (Task 20) | ## New BCMs electronics in Hall A line (Task 20) | ||
− | # Dennis Tuner: Raytrace | + | # Dennis Tuner: Raytrace: measure adiapatic damping with accelerator tools |
+ | # Paul King: Larger asymmetries when beam is recovered after a "long" down [https://logbooks.jlab.org/entry/4200711] | ||
Revision as of 06:42, 17 October 2023
2023
- MOLLER Accelerator Task List: media:MOLLER_Accelerator_Tasks_PQB_Meeting.pdf
- MOLLER Accelerator Task Planner: media:MOLLER_Accelerator_Tasks_Planner.xlsx
Upcoming updates:
- Shukui Zhang:
- RTP test setup at UITF laser table
- Laser table surface area measurements (space available for new HV Driver)
- Install new Hall D IA at CEBAF
- Ryan Bodenstein: Fast Feedback (FFB) system resurrection (Task 10)
- Ciprian Gal:
- Beam Modulation (Task 12)
- Halo Monitors in Hall A (Task 17)
- New BPM Digital Receivers in Hall A line – instead of Sample/Hold cards (Task 19)
- New BCMs electronics in Hall A line (Task 20)
- Dennis Tuner: Raytrace: measure adiapatic damping with accelerator tools
- Paul King: Larger asymmetries when beam is recovered after a "long" down [1]
2019
- May 3, 2019 - PQB source/injector setup for Summer 2019 PREX-II Run
- PQB Meeting April 18, 2019 - BPM readout meeting
- PQB Meeting March 6, 2019 - Moller Quality Beam meeting
2018
2017
2016
2015