Difference between revisions of "Accelerator PQB Meetings"

From Ciswikidb
Jump to navigation Jump to search
Line 12: Line 12:
 
# Shukui Zhang:
 
# Shukui Zhang:
 
## RTP test setup at UITF laser table
 
## RTP test setup at UITF laser table
## Laser table surface area measurements (space available for new HV Driver)
 
## Install new Hall D IA at CEBAF
 
 
# Ryan Bodenstein: Fast Feedback (FFB) system resurrection (Task 10)
 
# Ryan Bodenstein: Fast Feedback (FFB) system resurrection (Task 10)
 
# Ciprian Gal:
 
# Ciprian Gal:

Revision as of 08:58, 26 October 2023

2023



Upcoming updates:

  1. Shukui Zhang:
    1. RTP test setup at UITF laser table
  2. Ryan Bodenstein: Fast Feedback (FFB) system resurrection (Task 10)
  3. Ciprian Gal:
    1. Beam Modulation (Task 12)
    2. Halo Monitors in Hall A (Task 17)
    3. New BPM Digital Receivers in Hall A line – instead of Sample/Hold cards (Task 19)
    4. New BCMs electronics in Hall A line (Task 20)
  4. Dennis Tuner: Raytrace: measure adiapatic damping with accelerator tools
  5. Paul King: Larger asymmetries when beam is recovered after a "long" down [1]




2019

  • May 3, 2019 - PQB source/injector setup for Summer 2019 PREX-II Run



2018


2017


2016


2015


2014