Difference between revisions of "Accelerator PQB Meetings"

From Ciswikidb
Jump to navigation Jump to search
Line 15: Line 15:
 
## New BPM Digital Receivers in Hall A line – instead of Sample/Hold cards (Task 19)
 
## New BPM Digital Receivers in Hall A line – instead of Sample/Hold cards (Task 19)
 
## New BCMs electronics in Hall A line (Task 20)
 
## New BCMs electronics in Hall A line (Task 20)
# Dennis Tuner: Raytrace: measure adiapatic damping with accelerator tools
+
# Dennis Tuner: Raytrace: measure adiabatic damping with accelerator tools
 
# PQB Studies List (Caryn Palatchi): [[media:PQB_studies_list_2023-2025.pdf]]
 
# PQB Studies List (Caryn Palatchi): [[media:PQB_studies_list_2023-2025.pdf]]
 
# Rui Li: Transient beam loading in the CEBAF RF (November 29, 2023)
 
# Rui Li: Transient beam loading in the CEBAF RF (November 29, 2023)
 
# Here is the tentative schedule until end of year as discussed in the BTEAM:
 
# Here is the tentative schedule until end of year as discussed in the BTEAM:
## HALLA FFB testing/restoration (4 hours) , BSLIST 110062
+
## Hall A FFB testing/restoration (4 hours) , BSLIST 110062
 
## Booster study ( 6 hours) => 11/28  BSLIST 110185
 
## Booster study ( 6 hours) => 11/28  BSLIST 110185
 
## NL gradient cal (4 hours) => 11/21  BSLIST 22480
 
## NL gradient cal (4 hours) => 11/21  BSLIST 22480
## Wien testplans. 3 of them. => 12/05  BSLIST 109792, 109230, 109791
+
## Wien test plans. 3 of them. => 12/05  BSLIST 109792, 109230, 109791
 
## Wien filter coupling study (4 hours) => 12/12  BSLIST 110163
 
## Wien filter coupling study (4 hours) => 12/12  BSLIST 110163
  

Revision as of 07:40, 15 November 2023

2023



Upcoming updates:

  1. Ciprian Gal:
    1. Beam Modulation (Task 12)
    2. Halo Monitors in Hall A (Task 17)
    3. New BPM Digital Receivers in Hall A line – instead of Sample/Hold cards (Task 19)
    4. New BCMs electronics in Hall A line (Task 20)
  2. Dennis Tuner: Raytrace: measure adiabatic damping with accelerator tools
  3. PQB Studies List (Caryn Palatchi): media:PQB_studies_list_2023-2025.pdf
  4. Rui Li: Transient beam loading in the CEBAF RF (November 29, 2023)
  5. Here is the tentative schedule until end of year as discussed in the BTEAM:
    1. Hall A FFB testing/restoration (4 hours) , BSLIST 110062
    2. Booster study ( 6 hours) => 11/28 BSLIST 110185
    3. NL gradient cal (4 hours) => 11/21 BSLIST 22480
    4. Wien test plans. 3 of them. => 12/05 BSLIST 109792, 109230, 109791
    5. Wien filter coupling study (4 hours) => 12/12 BSLIST 110163





2019

  • May 3, 2019 - PQB source/injector setup for Summer 2019 PREX-II Run



2018


2017


2016


2015


2014