Difference between revisions of "Accelerator PQB Meetings"

From Ciswikidb
Jump to navigation Jump to search
Line 18: Line 18:
 
# PQB Studies List (Caryn Palatchi): [[media:PQB_studies_list_2023-2025.pdf]]
 
# PQB Studies List (Caryn Palatchi): [[media:PQB_studies_list_2023-2025.pdf]]
 
# Rui Li: Transient beam loading in the CEBAF RF (TBD)
 
# Rui Li: Transient beam loading in the CEBAF RF (TBD)
# Here is the tentative schedule until end of year as discussed in the BTEAM:
+
# For next beam studies 12/13/2023: 0700-1200 to Hall C
## Hall A FFB testing/restoration (4 hours) , BSLIST 110062
+
## FFB in Hall C
## Booster study ( 6 hours) => 11/28  BSLIST 110185
+
## Nathan (for an hour or so) : SEE BPM With Stripline Can Response Test
## NL gradient cal (4 hours) => 11/21  BSLIST 22480
 
## Wien test plans. 3 of them. => 12/05  BSLIST 109792, 109230, 109791
 
## Wien filter coupling study (4 hours) => 12/12  BSLIST 110163
 
 
# Change Pockels Cells in IA systems from KD*P to RTP cells
 
# Change Pockels Cells in IA systems from KD*P to RTP cells
  

Revision as of 10:05, 6 December 2023

2023



Upcoming updates:

  1. Ciprian Gal:
    1. Beam Modulation (Task 12)
    2. Halo Monitors in Hall A (Task 17)
    3. New BPM Digital Receivers in Hall A line – instead of Sample/Hold cards (Task 19)
    4. New BCMs electronics in Hall A line (Task 20)
  2. Dennis Tuner: Raytrace: measure adiabatic damping with accelerator tools
  3. PQB Studies List (Caryn Palatchi): media:PQB_studies_list_2023-2025.pdf
  4. Rui Li: Transient beam loading in the CEBAF RF (TBD)
  5. For next beam studies 12/13/2023: 0700-1200 to Hall C
    1. FFB in Hall C
    2. Nathan (for an hour or so) : SEE BPM With Stripline Can Response Test
  6. Change Pockels Cells in IA systems from KD*P to RTP cells




2019

  • May 3, 2019 - PQB source/injector setup for Summer 2019 PREX-II Run



2018


2017


2016


2015


2014