Difference between revisions of "UITF Procedures not managed via document control"

From Ciswikidb
Jump to navigation Jump to search
Line 35: Line 35:
 
*Locking out the gun and high power RF
 
*Locking out the gun and high power RF
 
*Locking out the valve upstream of the booster
 
*Locking out the valve upstream of the booster
 +
 +
'''[[booster-related]]'''
 +
*[[media:David Savransky's cool down procedure.docx]]
  
 
'''[[HDIce-related]]'''
 
'''[[HDIce-related]]'''
 
*Rowgowski-coil beam position monitor [[media:Kevin's proposed test plan for evaluating the Rogowski coil bpm.docx]]
 
*Rowgowski-coil beam position monitor [[media:Kevin's proposed test plan for evaluating the Rogowski coil bpm.docx]]
 
*Putting beam on the "golden orbit" [[media: golden orbit procedure.docx]]
 
*Putting beam on the "golden orbit" [[media: golden orbit procedure.docx]]

Revision as of 13:49, 9 December 2021

Emergency Response Procedures


Photogun Related Procedures

Laser Procedures

UITF Buncher Phase & Gradient Setup

  • using the harmonically resonant cavity
  • using the 200 keV spectrometer
  • using the Yao cavity, time-of-flight method

UITF chopper system

  • overall description

Sweep Procedures

  • overview of the sweep procedure for UITF, including pre-sweep steps

Machine Protection at UITF

  • UHV ion pumps, setting the trip limit

Beam Authorization

  • how to get it
  • Locking out the gun and high power RF
  • Locking out the valve upstream of the booster

booster-related

HDIce-related