Difference between revisions of "UITF Procedures not managed via document control"

From Ciswikidb
Jump to navigation Jump to search
Line 6: Line 6:
 
'''[[Shielding related]]'''
 
'''[[Shielding related]]'''
 
*trench shielding photos [[Media:trench shielding photos.xls]]
 
*trench shielding photos [[Media:trench shielding photos.xls]]
 
  
 
'''[[Photogun Related Procedures]]'''
 
'''[[Photogun Related Procedures]]'''
Line 38: Line 37:
 
*Locking out the gun and high power RF
 
*Locking out the gun and high power RF
 
*Locking out the valve upstream of the booster
 
*Locking out the valve upstream of the booster
 +
 +
'''[[Start Up and Shutdown Procedures]]'''
 +
*[[media:Start Up and Shutdown Procedures.docx]]
  
 
'''[[booster-related]]'''
 
'''[[booster-related]]'''

Revision as of 13:42, 21 November 2022

Emergency Response Procedures

Shielding related

Photogun Related Procedures

Laser Procedures

UITF Buncher Phase & Gradient Setup

  • using the harmonically resonant cavity
  • using the 200 keV spectrometer
  • using the Yao cavity, time-of-flight method

UITF chopper system

  • overall description

Sweep Procedures

  • overview of the sweep procedure for UITF, including pre-sweep steps

Machine Protection at UITF

  • UHV ion pumps, setting the trip limit

Beam Authorization

  • how to get it
  • Locking out the gun and high power RF
  • Locking out the valve upstream of the booster

Start Up and Shutdown Procedures

booster-related

waste water irradiation-related

HDIce-related