UITF Procedures not managed via document control

From Ciswikidb
Revision as of 13:53, 9 December 2021 by Poelker (talk | contribs)
Jump to navigation Jump to search

Emergency Response Procedures


Photogun Related Procedures

Laser Procedures

UITF Buncher Phase & Gradient Setup

  • using the harmonically resonant cavity
  • using the 200 keV spectrometer
  • using the Yao cavity, time-of-flight method

UITF chopper system

  • overall description

Sweep Procedures

  • overview of the sweep procedure for UITF, including pre-sweep steps

Machine Protection at UITF

  • UHV ion pumps, setting the trip limit

Beam Authorization

  • how to get it
  • Locking out the gun and high power RF
  • Locking out the valve upstream of the booster

booster-related

waste water irradiation-related

HDIce-related