Difference between revisions of "UITF Procedures not managed via document control"

From Ciswikidb
Jump to navigation Jump to search
 
(18 intermediate revisions by 3 users not shown)
Line 1: Line 1:
'''[[photogun related procedures]]'''
+
'''[[Emergency Response Procedures]]'''
*krypton and vacuum high voltage processing
+
* [[media:UITF-power-outage-recovery-procv3.docx| Power Outage Recovery Procedure]]
*photogun bakeout
+
* [[media:Fireflow.pdf|Fire Response]]
*QE scanning the photocathode
+
* [[media:Emergency-Actions_4.7.21.docx|UITF Emergency Response Guidelines]]
  
'''[[laser related]]'''
+
'''[[UITF Operator Training]]'''
*tune mode generator alignment procedure
+
* [[media:SAF 162 UITF Operator Training.pptx]]
*pockel cell alignment procedure
 
*maximizing the power delivered to the laser hutch inside UITF enclosure
 
  
'''[[techniques to set the UITF buncher]]'''
+
'''[[Shielding related]]'''
*harmonically resonant cavity
+
* trench shielding photos [[Media:trench shielding photos.xls]]
*200 keV spectrometer
 
*Yao cavity, time-of-flight method
 
  
'''[[notes on sweeping the UITF enclosure and making it safe after beam oeprations]]'''
+
'''[[Photogun Related Procedures]]'''
 +
* krypton and vacuum high voltage processing
 +
** [[Media:UITF Photogun  HV conditioning in vacuum procedure.pdf]]
 +
** [[Media:UUITF Photogun  HV conditioning with Kr procedure.pdf]]
 +
* photogun bakeout
 +
* QE scanning the photocathode  [[media:how to perform a QE scan.docx]]
 +
* turn ON/OFF the photogun high voltage
 +
* 15 degree dipole magnet interlock [[media:the sense circuit for 15 degree dipole magnet that provides gun HV permission.docx]]
  
'''[[machine protection at UITF]]'''
+
'''[[Laser Procedures]]'''
*UHV ion pumps, setting trip limit
+
* tune mode generator alignment procedure  [[media:tune mode generator alignment procedure.pdf]]
 +
* pockel cell alignment procedure
 +
* maximizing the power delivered to the laser hutch inside UITF enclosure
 +
 
 +
'''[[UITF Buncher Phase & Gradient Setup]]'''
 +
* using the harmonically resonant cavity
 +
* using the 200 keV spectrometer
 +
* using the Yao cavity, time-of-flight method
 +
 
 +
'''[[UITF chopper system]]'''
 +
* overall description
 +
 
 +
'''[[Sweep Procedures]]'''
 +
* overview of the sweep procedure for UITF, including pre-sweep steps
 +
 
 +
'''[[Machine Protection at UITF]]'''
 +
* UHV ion pumps, setting the trip limit
  
 
'''[[Beam Authorization]]'''
 
'''[[Beam Authorization]]'''
*how to get it
+
* how to get it
*Locking out the gun and high power RF
+
* Locking out the gun and high power RF
*Locking out the valve upstream of the booster
+
* Locking out the valve upstream of the booster
 +
 
 +
'''[[Start Up and Shutdown Procedures]]'''
 +
* [[media:Start Up and Shutdown Procedures.docx]]
 +
 
 +
'''[[booster-related]]'''
 +
* [[media:David Savransky's cool down procedure.docx]]
 +
 
 +
'''[[waste water irradiation-related]]'''
 +
* [[media:dose mapping procedure.pdf]]
 +
 
 +
'''[[HDIce-related]]'''
 +
* Rowgowski-coil beam position monitor [[media:Kevin's proposed test plan for evaluating the Rogowski coil bpm.docx]]
 +
* Putting beam on the "golden orbit" [[media: golden orbit procedure.docx]]

Latest revision as of 09:47, 17 July 2024

Emergency Response Procedures

UITF Operator Training

Shielding related

Photogun Related Procedures

Laser Procedures

UITF Buncher Phase & Gradient Setup

  • using the harmonically resonant cavity
  • using the 200 keV spectrometer
  • using the Yao cavity, time-of-flight method

UITF chopper system

  • overall description

Sweep Procedures

  • overview of the sweep procedure for UITF, including pre-sweep steps

Machine Protection at UITF

  • UHV ion pumps, setting the trip limit

Beam Authorization

  • how to get it
  • Locking out the gun and high power RF
  • Locking out the valve upstream of the booster

Start Up and Shutdown Procedures

booster-related

waste water irradiation-related

HDIce-related