Difference between revisions of "UITC meeting minutes"
Jump to navigation
Jump to search
Line 1: | Line 1: | ||
'''2018''' | '''2018''' | ||
+ | :[[UITF Meeting - January 14, 2019]] P&C Meeting slides January 2019 | ||
+ | |||
:[[UITF Meeting - January 8, 2019]] On going discussion related to shielding, a to-do list | :[[UITF Meeting - January 8, 2019]] On going discussion related to shielding, a to-do list | ||
Revision as of 08:31, 14 January 2019
2018
- UITF Meeting - January 14, 2019 P&C Meeting slides January 2019
- UITF Meeting - January 8, 2019 On going discussion related to shielding, a to-do list
- UITF Meeting - January 7, 2019 More discussions related to the North Wall and extra shielding
- UITF Meeting - December 12, 2018 Uses of UITF
- UITF Meeting - December 5, 2018 Keith Welch's observation and thoughts on accident scenarios, part of our on-going discussion related to PSS-BCM and shielding
- UITF Meeting - November 26, 2018 P&C meeting, Andy presents a UITF/HDIce run schedule
- UITF Meeting - November 20, 2018 Shielding options for Cave2 north wall
- UITF Meeting - November 13, 2018 PSS BCM "specifications" documents
- UITF Meeting - November 7, 2018 MeV spreadsheet of components, Haimson inventory, MAT corrector inventory
- UITF Meeting - October 31, 2018 (HDice) Double Dump discussion
- UITF Meeting - October 15, 2018 P&C meeting slides
- UITF Meeting - August 29, 2018 With HDIce Group
- UITF Meeting - August 15, 2018 With HDIce Group
- UITF Meeting - August 13, 2018 P&C slides
- UITF Meeting - June 15, 2018 Meeting with Patrizia, experimental readiness review?
- UITF Meeting - June 12, 2018 Draft documents UITF Operations Directive, Bob's draft UITF ARR, and Bob's summary comments
- UITF Meeting - June 6, 2018 HDIce mechanical design discussion
- UITF Meeting - June 3, 2018 to-do list
- UITF Meeting - March 11, 2018 Cave drawing showing trenches and notes for Vashek to calculate shielding requirements near trenches
- UITF Meeting - March 10, 2018 The QCM was cooled to 4K on April 6 and then pumped down to 2K on April 9. Temperatures, pressure and liquid level look good: https://logbooks.jlab.org/entry/3557428
- UITF Meeting - March 12, 2018 to-do list, preparing to cool QCM and add RF
- UITF Meeting - March 2, 2018 details related to QCM commissioning
- UITF Meeting - February 26, 2018 to-do list
- UITF Meeting - February 12, 2018 to-do list
- UITF Meeting - February 9, 2018 Parts count discussion, MeV beamline
- UITF Meeting - February 8, 2018 Discuss plans to cool the QCM and apply high power RF, but no beam acceleration
- UITF Meeting - January 29, 2018 We have 200 keV Viewer limited beam! Updates from RF and from Cryo on QCM, Chopper being conditioned
- UITF Meeting - January 24, 2018 UITF ME weekly meeting
- UITF Meeting - January 19, 2018 UITF choppers + comments on UITF MPS/FSD system
- UITF Meeting - January 9, 2018 Where Trent left the PSS BCM proposal before his departure
2017
- UITF Meeting - December 18, 2017 Gun conditioned to 200 kV in vacuum. Beam line ready for beam?
- UITF Meeting - December 4, 2017 Gun HV conditioning in progress, made a cathode and preparing beam line for keV beam operations
- UITF Meeting - November 6, 2017 preparing for keV beam operations
- UITF Meeting - April 10, 2017 budget status
- UITF/SRF Meeting - March 24, 2017 SRF cleaning 4kxx beamline
- UITF Meeting - February 1, 2017 Editing the keV OSP
2016
- UITF Meeting - October 21, 2016 UITF and CEBAF PSS BCM mini-review
- UITF Meeting - October 20, 2016 Meeting with Mont, HDIce schedule
- UITF Meeting - October 10, 2016 Meeting with Service Providers, FY17 budget estimate
- UITF Meeting - August 16, 2016 Meeting with Mont, UITF PSS BCM discussion meeting minutes, CEBAF PSS BCM technote
- UITF Meeting - August 1, 2016 UITF Engineering Meeting
- UITF Meeting - July 14, 2016 Group meeting - keV beamline vacuum status
- UITF Meeting - July 12, 2016 Meeting with Mont
- UITF Meeting - June 15, 2016 Work coordination - the new quarter cryomodule
- UITF Meeting - May 19, 2016 PSS BCM discussion
- UITF Meeting - May 17, 2016 Meeting with Mont
- UITF Meeting - May 10, 2016 Internal Safety Review
- UITC Meeting - April 12, 2016 Meeting with Mont
- UITF Meeting - March 18, 2016 UITF Ops Review
- UITF Meeting - March 15, 2016 Meeting with Mont
- UITF Meeting - March 7, 2016 Provide overview to EES, show schedule, MPS discussion
- UITF Meeting - February 29, 2016 imagining ops with macropulse beam
- UITC Meeting - February 23, 2016 Meeting with Mont + parts list + cost estimates for helium
- UITC Meeting - February 19, 2016 Discuss different aspects of new 1/4 CM at UITF
- UITC Meeting - February 1, 2016 HDIce talk to Hall B Users
- UITC Meeting - January 29, 2016 Revised schedule
- UITC Meeting - January 27, 2016 ME Meeting
- UITC Meeting - January 19, 2016 Meeting with Mont
- UITC Meeting - January 14, 2016 Discuss cost estimate "deltas" with Engineering and Kelly Webster
- UITC Meeting - January 4, 2016 HDIce meeting
2015
- UITC Meeting - December 21, 2015 Meeting with Mont
- UITC Meeting - December 15, 2015 Meeting with HDice Group
- UITC Meeting - December 14, 2015 Nuts and Bolts
- UITC Meeting - December 10, 2015 a revised global schedule and cost estimate
- UITC Meeting - November 23, 2015 Monthly meeting with Mont, re-scoping UITF, month by month costs estimate revisited
- UITC Meeting - November 9, 2015 Meeting with BNL gun group
- UITC Meeting - October 26, 2015 Meeting with Team HDIce, ODH source term discussion
- UITC Meeting - October 21, 2015 Monthly Meeting with Mont, month by month cost estimate, P&C meeting slides
- UITC Meeting - October 12, 2015 Meeting with HDIce Folks (status of project)
- UITC Meeting - October 8, 2015 Final top-of-cave electrical requirements
- UITC Meeting - October 1, 2015 ODH discussion
- UITC Meeting - August 31, 2015 Discuss electrical requirements above cave + Meeting with HDIce, target dimensions and transfer line discussion + Mont meeting
- UITC Meeting - August 24, 2015 rack layout, utility layout
- UITC Meeting - August 17 part2, 2015 HDIce beamline design talking points
- UITC Meeting - August 17, 2015 Electronics rack discussion
- UITC Meeting - August 12, 2015 ME meeting
- UITC Meeting - August 10, 2015 nuts and bolts to do list
- UITC Meeting - August 5, 2015 ODH discussion
- UITC Meeting - August 3, 2015 An example of ODH assessment - the CMTF
- UITC Meeting - July 31, 2015 Meeting with Mont
- UITC Meeting - July 27, 2015 Status report and update
- UITC Meeting - July 8, 2015 Meeting with EHS&Q
- UITC Meeting - June 22, 2015 Meeting with Engineering
- UITC Meeting - June 12, 2015 1/4 cryomodule discussion with Ops and SRF
- UITC Meeting - June 9, 2015 GTS discussion with Danny
- UITC Meeting - June 8, 2015 (eHD) Raster position/power, global schedule discussion, quantitative assessment of in-house solenoids
- UITC Meeting - June 5, 2015 Cryomodule considerations
- UITC Meeting - June 3, 2015 May 14, 2015 ME model + optics, Wien, buncher
- UITC Meeting - May 18, 2015 Slides presented to Mont, UITF cost update, entry/exit geometries
- UITC Meeting - May 12, 2015 Estimating network and computer control costs
- UITC Meeting - April 27, 2015 Warm beamline design, stairs, parts count update
- UITC Meeting - April 1, 2015 Mechanical Meeting and Meeting with I&C/Magnets Folks to discuss parts count
- UITC Meeting - March 25, 2015 Mechanical Meeting
- UITC Meeting - March 23, 2015 Layout and parts-list discussion
- UITC Meeting - March 16, 2015 UITF to do list, link to old engineering service providers
- UITC Meeting - March 13, 2015 Matt presentation at P&C meeting + two revised schedules
- UITC Meeting - March 9, 2015 Alex optics model presentation, ver 2
- UITC Meeting - February 16, 2015 parts list discussion
- UITC Meeting - February 13, 2015 Poelker P&C Meeting slides
- UITC Meeting - January 26, 2015 update the to-do list
- UITC Meeting - January 22, 2015 Follow meeting with Cryo
- UITC Meeting - January 20, 2015 Rebecca's Facilities Schedules, old and new. Walt's schedule
- UITC Meeting - January 16, 2015 Talks by Poelker and W. Akers at Planning and Coordination meeting
- UITF Meeting - January 15, 2015 Meeting minutes with RF guys
- UITC Meeting - January 12, 2105 Continue LHe discussion, Mike Lowry's HDIce alternate beamline layouts
2014
- UITC Meeting - December 22, 2014 Joe Grames optics, Facilities revised schedule
- UITC Meeting - December 16, 2014 Orientation of old and new 1/4CM inside the cave, and notes re: LHe supply/return cans
- UITC Meeting - December 15, 2014 Optics discussion, beamline mechanical layout, Walt's Cave2 proposal
- UITC Meeting - December 12, 2014 Subset of UITF team meets with Andrew and "Service Providers"
- UITC Meeting - December 8, 2014 WBS assessment, discuss Walt's new cave layout, Mike Lowry's first HDIce beamline layout
- UITC Meeting - December 1, 2014 concrete block inventory
- UITC Meeting - November 3, 2014 g4beamline modeling raster + solenoid
- UITC Meeting - October 27, 2014 Raster Discussion
- UITC Meeting - Oct 13, 2014 Big Picture
- UITC Meeting - Oct 6, 2014 Nuts and Bolts
- UITC Meeting - September 29, 2014 Big Picture: nanoamp BPMs and modeling discussion
- UITC Meeting - Septmeber 22, 2014 Nuts and Bolts: Optics and Mechanical model developments
- UITC Meeting - Septmeber 15, 2014 Beamline discussion continued
- UITC Meeting - September 8, 2014 Yan Wang's thesis proposal
- UITC Meeting - August 25, 2014 Nuts and Bolts (to-do list for both guns, Test Cave and GTS)
- UITC Meeting - August 18, 2014 Big Picture (RF systems discussion with Tom and Curt)
- UITC Meeting - August 4, 2014 Big Picture (Hari's proposal for safety system,
- UITC Meeting - July 28, 2014 Nuts and Bolts (1497 MHz Chopper assessment, Discuss beamline design, shed design, Engineering labor estimate, GTS gun sans light box)
- UITC Meeting - July 21, 2014 Big Picture (Discussion with Tom Renzo of Facilities)
- UITC Meeting - July 14, 2014 Nuts and Bolts (more odds and ends, including GTS "to do" list)
- UITC Meeting - July 7, 2014 Big Picture (invitee Pavel Evtushenko discussion on beamline diagnostics + beamline layout gun to HDIce target)
- UITC Meeting - June 30, 2014 Nuts and Bolts Test Cave and GTS (odds and ends discussion for both beamlines)
- UITC Meeting - June 23, 2014 Big Picture (350kV beamline discussion, schedule v1)
- UITC Meeting - June 16, 2014 Nuts & Bolts
- UITC Meeting - June 9, 2014 Big Picture (Engineering and Facilities Kick OFF meeting at MCC)
- UITC Meeting - June 2, 2014 Nuts & Bolts (DS and chopper comments)
- UITC Meeting - May 20, 2014 Beam line layout discussion continued
- UITC Meeting - May 12, 2014 Beam line layout discussion
- UITC Meeting - May 5, 2014 (Topic - drawings, basic layout and specs table)
- UITC Meeting - March 26, 2014 (Topic - Injector Magnets)
- UITC Meeting - February 14, 2014 (Topic - Task List)
- UITC Meeting - February 7, 2014 Hari's proposal to Lab management that led to approval