(Created page with "'''photogun related procedures''' krypton and vacuum high voltage processing photogun bakeout QE scanning the photocathode '''laser related''' tune mode generator ali...")
 
 
(17 intermediate revisions by 3 users not shown)
Line 1: Line 1:
'''[[photogun related procedures]]'''
+
'''[[Emergency Response Procedures]]'''
krypton and vacuum high voltage processing
+
*[[media:UITF-power-outage-recovery-procv3.docx| Power Outage Recovery Procedure]]
photogun bakeout
+
*[[media:Fireflow.pdf|Fire Response]]
QE scanning the photocathode
+
*[[media:Emergency-Actions_4.7.21.docx|UITF Emergency Response Guidelines]]
  
'''[[laser related]]'''
+
'''[[UITF Operator Training]]'''
tune mode generator alignment procedure
+
*[[media:SAF 162 UITF Operator Training.pptx]]
pockel cell alignment procedure
 
maximizing the power delivered to the laser hutch inside UITF enclosure
 
  
'''[[techniques to set the UITF buncher]]'''
+
'''[[Shielding related]]'''
harmonically resonant cavity
+
*trench shielding photos [[Media:trench shielding photos.xls]]
200 keV spectrometer
 
Yao cavity, time-of-flight method
 
  
'''[[notes on sweeping the UITF enclosure and making it safe after beam oeprations]]'''
+
'''[[Photogun Related Procedures]]'''
 +
*krypton and vacuum high voltage processing [[Media:UITF Photogun  HV conditioning with Kr procedure.docx]]
 +
*photogun bakeout
 +
*QE scanning the photocathode  [[media:how to perform a QE scan.docx]]
 +
*turn ON/OFF the photogun high voltage
 +
*15 degree dipole magnet interlock [[media:the sense circuit for 15 degree dipole magnet that provides gun HV permission.docx]]
  
'''[[machine protection at UITF]]'''
+
'''[[Laser Procedures]]'''
UHV ion pumps, setting trip limit
+
*tune mode generator alignment procedure  [[media:tune mode generator alignment procedure.pdf]]
 +
*pockel cell alignment procedure
 +
*maximizing the power delivered to the laser hutch inside UITF enclosure
 +
 
 +
'''[[UITF Buncher Phase & Gradient Setup]]'''
 +
*using the harmonically resonant cavity
 +
*using the 200 keV spectrometer
 +
*using the Yao cavity, time-of-flight method
 +
 
 +
'''[[UITF chopper system]]'''
 +
*overall description
 +
 
 +
'''[[Sweep Procedures]]'''
 +
*overview of the sweep procedure for UITF, including pre-sweep steps
 +
 
 +
'''[[Machine Protection at UITF]]'''
 +
*UHV ion pumps, setting the trip limit
  
 
'''[[Beam Authorization]]'''
 
'''[[Beam Authorization]]'''
how to get it
+
*how to get it
Locking out the gun and high power RF
+
*Locking out the gun and high power RF
Locking out the valve upstream of the booster
+
*Locking out the valve upstream of the booster
 +
 
 +
'''[[Start Up and Shutdown Procedures]]'''
 +
*[[media:Start Up and Shutdown Procedures.docx]]
 +
 
 +
'''[[booster-related]]'''
 +
*[[media:David Savransky's cool down procedure.docx]]
 +
 
 +
'''[[waste water irradiation-related]]'''
 +
*[[media:dose mapping procedure.pdf]]
 +
 
 +
'''[[HDIce-related]]'''
 +
*Rowgowski-coil beam position monitor [[media:Kevin's proposed test plan for evaluating the Rogowski coil bpm.docx]]
 +
*Putting beam on the "golden orbit" [[media: golden orbit procedure.docx]]

Latest revision as of 14:15, 12 March 2024

Emergency Response Procedures

UITF Operator Training

Shielding related

Photogun Related Procedures

Laser Procedures

UITF Buncher Phase & Gradient Setup

  • using the harmonically resonant cavity
  • using the 200 keV spectrometer
  • using the Yao cavity, time-of-flight method

UITF chopper system

  • overall description

Sweep Procedures

  • overview of the sweep procedure for UITF, including pre-sweep steps

Machine Protection at UITF

  • UHV ion pumps, setting the trip limit

Beam Authorization

  • how to get it
  • Locking out the gun and high power RF
  • Locking out the valve upstream of the booster

Start Up and Shutdown Procedures

booster-related

waste water irradiation-related

HDIce-related