Difference between revisions of "UITF Procedures not managed via document control"
Jump to navigation
Jump to search
(3 intermediate revisions by the same user not shown) | |||
Line 4: | Line 4: | ||
*[[media:Emergency-Actions_4.7.21.docx|UITF Emergency Response Guidelines]] | *[[media:Emergency-Actions_4.7.21.docx|UITF Emergency Response Guidelines]] | ||
+ | '''[[UITF Operator Training]]''' | ||
+ | *[[media:SAF 162 UITF Operator Training.pptx]] | ||
+ | |||
+ | '''[[Shielding related]]''' | ||
+ | *trench shielding photos [[Media:trench shielding photos.xls]] | ||
'''[[Photogun Related Procedures]]''' | '''[[Photogun Related Procedures]]''' | ||
Line 35: | Line 40: | ||
*Locking out the gun and high power RF | *Locking out the gun and high power RF | ||
*Locking out the valve upstream of the booster | *Locking out the valve upstream of the booster | ||
+ | |||
+ | '''[[Start Up and Shutdown Procedures]]''' | ||
+ | *[[media:Start Up and Shutdown Procedures.docx]] | ||
'''[[booster-related]]''' | '''[[booster-related]]''' | ||
*[[media:David Savransky's cool down procedure.docx]] | *[[media:David Savransky's cool down procedure.docx]] | ||
+ | |||
+ | '''[[waste water irradiation-related]]''' | ||
+ | *[[media:dose mapping procedure.pdf]] | ||
'''[[HDIce-related]]''' | '''[[HDIce-related]]''' | ||
*Rowgowski-coil beam position monitor [[media:Kevin's proposed test plan for evaluating the Rogowski coil bpm.docx]] | *Rowgowski-coil beam position monitor [[media:Kevin's proposed test plan for evaluating the Rogowski coil bpm.docx]] | ||
*Putting beam on the "golden orbit" [[media: golden orbit procedure.docx]] | *Putting beam on the "golden orbit" [[media: golden orbit procedure.docx]] |
Latest revision as of 14:15, 12 March 2024
- trench shielding photos Media:trench shielding photos.xls
- krypton and vacuum high voltage processing Media:UITF Photogun HV conditioning with Kr procedure.docx
- photogun bakeout
- QE scanning the photocathode media:how to perform a QE scan.docx
- turn ON/OFF the photogun high voltage
- 15 degree dipole magnet interlock media:the sense circuit for 15 degree dipole magnet that provides gun HV permission.docx
- tune mode generator alignment procedure media:tune mode generator alignment procedure.pdf
- pockel cell alignment procedure
- maximizing the power delivered to the laser hutch inside UITF enclosure
UITF Buncher Phase & Gradient Setup
- using the harmonically resonant cavity
- using the 200 keV spectrometer
- using the Yao cavity, time-of-flight method
- overall description
- overview of the sweep procedure for UITF, including pre-sweep steps
- UHV ion pumps, setting the trip limit
- how to get it
- Locking out the gun and high power RF
- Locking out the valve upstream of the booster
Start Up and Shutdown Procedures
waste water irradiation-related
- Rowgowski-coil beam position monitor media:Kevin's proposed test plan for evaluating the Rogowski coil bpm.docx
- Putting beam on the "golden orbit" media: golden orbit procedure.docx