RC:
Summary of Sep. 7th
Owl shift
- Shift summary by the shift expert: https://logbooks.jlab.org/entry/3842747
- Issues: Fairly smooth running, but 2 hours beam down
- Recorded data: 22.2 M events on D2
Day shift
- Shift summary by the shift expert: https://logbooks.jlab.org/entry/3843015
- Issues: Fairly smooth beam until our vacuum problem becomes untenable again. Access Hall at 3:00
- Recorded data: 28.2 M events on D2
Swing shift
- Shift summary by the shift expert: https://logbooks.jlab.org/entry/3843325
- Issues: Finish Hall Access (no leaks found). Continued accelerator breakdowns.
- Recorded data: 24.5 M events on D2
Whole day summary
- Total recorded data today: 75 M events on D2
- Part-II total accumulated data on D2: 1.66 B events
- Concerns: Need to fix recurring vacuum issue. Accelerator slowly falling apart...
Tomorrow daily RC meeting will be at usual time 12:00 PM using the link https://bluejeans.com/7576835804/