Summary of Aug. 22th
Owl shift
- Shift summary https://logbooks.jlab.org/entry/3832186
- Issues: tunning the beam took a while and the beam was shifted. new target scan. new positions on 2c21, 2c24, and 2H01
- Recorded data: 0
Day shift
- Shift summary by the shift expert: https://logbooks.jlab.org/entry/3832342
- Issues: None major (one run with 1 dead DREAM chip - fixed by recycling LV)
- Recorded data: 40 M triggers, incl. 12 M with no-roads trigger (rest standard trigger on D2)
Swing shift
- Shift summary by the shift expert: https://logbooks.jlab.org/entry/3832494
- Issues: DC HV (lost part of R2S6 during one run)
- Recorded data: about 4.4M events on D2 and about 30 M events on H2.
Whole day summary
- Total recorded data today: About 74 M.
- Part-II total accumulated data on D2: 773 M events
- Concerns: Continuing puzzle about the large backgrounds in BOM, downstream counters and all FD counters.
Tomorrow daily RC meeting will be at usual time 12:00 PM using the link https://bluejeans.com/7576835804/