Difference between revisions of "RC Meeting: August 29th, 2020"
Jump to navigation
Jump to search
(Created page with "Back to Run Group F | Daily Run Group F Coordination Meetings 12:00PM RC Meeting (https://bluejeans.com/7576835804) '''RC:''' ==2020== {| class="wikit...") |
|||
(8 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
Back to [[Run Group F|Run Group F]] | [[Daily Run Group F Coordination Meetings]] | Back to [[Run Group F|Run Group F]] | [[Daily Run Group F Coordination Meetings]] | ||
− | |||
− | |||
− | |||
Line 11: | Line 8: | ||
! March | ! March | ||
|- | |- | ||
− | | [[Run Meeting: March 19th, 2020|19]], [[Run Meeting: March 20th, 2020|20]], [[Run Meeting: March 21st, 2020|21]], [[Run Meeting: March 22nd, 2020|22]], [[Run Meeting: March 23rd, 2020|23]], [[Run Meeting: March 24th, 2020|24 | + | | [[Run Meeting: March 19th, 2020|19]], [[Run Meeting: March 20th, 2020|20]], [[Run Meeting: March 21st, 2020|21]], [[Run Meeting: March 22nd, 2020|22]], [[Run Meeting: March 23rd, 2020|23]], [[Run Meeting: March 24th, 2020|24]] |
|- | |- | ||
! July | ! July | ||
Line 19: | Line 16: | ||
! August | ! August | ||
|- | |- | ||
− | | [[Run Meeting: August 1st, 2020|1]], [[Run Meeting: August 2nd, 2020|2]], [[Run Meeting: August 3rd, 2020|3]], [[Run Meeting: August 4th, 2020|4]], [[Run Meeting: August 5th, 2020|5]], [[Run Meeting: August 6th, 2020|6]], [[Run Meeting: August 7th, 2020|7]], [[Run Meeting: August 8th, 2020|8]], [[Run Meeting: August 9th, 2020|9]], [[Run Meeting: August 10th, 2020|10]], [[Run Meeting: August 11th, 2020|11]], [[Run Meeting: August 12th, 2020|12]], [[Run Meeting: August 13th, 2020|13]], [[Run Meeting: August 14th, 2020|14]], [[Run Meeting: August 15th, 2020|15]], [[Run Meeting: August 16th, 2020|16]], [[Run Meeting: August 17th, 2020|17]], [[Run Meeting: August 18th, 2020|18]], [[Run Meeting: August 19th, 2020|19]], [[Run Meeting: August 20th, 2020|20]] [[Run Meeting: August 21st, 2020|21]] [[Run Meeting: August 22nd, 2020|22]] [[Run Meeting: August 23rd, 2020|23]] [[Run Meeting: August 24th, 2020|24]], [[RC Meeting: August 25th, 2020|25]], [[RC Meeting: August 26th, 2020|26]], [[RC Meeting: August 27th, 2020|27]], [[RC Meeting: August 28th, 2020|28]], [[RC Meeting: August 29th, 2020|29]], [[RC Meeting: August 30th, 2020|30]], [[RC Meeting: August 31st, 2020|31]] | + | | [[Run Meeting: August 1st, 2020|1]], [[Run Meeting: August 2nd, 2020|2]], [[Run Meeting: August 3rd, 2020|3]], [[Run Meeting: August 4th, 2020|4]], [[Run Meeting: August 5th, 2020|5]], [[Run Meeting: August 6th, 2020|6]], [[Run Meeting: August 7th, 2020|7]], [[Run Meeting: August 8th, 2020|8]], [[Run Meeting: August 9th, 2020|9]], [[Run Meeting: August 10th, 2020|10]], [[Run Meeting: August 11th, 2020|11]], [[Run Meeting: August 12th, 2020|12]], [[Run Meeting: August 13th, 2020|13]], [[Run Meeting: August 14th, 2020|14]], [[Run Meeting: August 15th, 2020|15]], [[Run Meeting: August 16th, 2020|16]], [[Run Meeting: August 17th, 2020|17]], [[Run Meeting: August 18th, 2020|18]], [[Run Meeting: August 19th, 2020|19]], [[Run Meeting: August 20th, 2020|20]] [[Run Meeting: August 21st, 2020|21]], [[Run Meeting: August 22nd, 2020|22]], [[Run Meeting: August 23rd, 2020|23]], [[Run Meeting: August 24th, 2020|24]], [[RC Meeting: August 25th, 2020|25]], [[RC Meeting: August 26th, 2020|26]], [[RC Meeting: August 27th, 2020|27]], [[RC Meeting: August 28th, 2020|28]], [[RC Meeting: August 29th, 2020|29]], [[RC Meeting: August 30th, 2020|30]], [[RC Meeting: August 31st, 2020|31]] |
|- | |- | ||
! September | ! September | ||
Line 26: | Line 23: | ||
|- | |- | ||
|} | |} | ||
+ | '''RC:M. Hattawy''' | ||
==Summary of Aug. 29th== | ==Summary of Aug. 29th== | ||
=== Owl shift === | === Owl shift === | ||
− | # Shift summary by the shift expert: | + | # Shift summary by the shift expert: https://logbooks.jlab.org/entry/3836682 |
− | # Issues: | + | # Issues: Extended DC HV trip in sector 5 region 1 |
− | # Recorded data: | + | # studies: x-y position on 2H01, x = -0.2mm, y -1.3mm |
+ | # Recorded data: 19 M on D2 | ||
=== Day shift === | === Day shift === | ||
− | # Shift summary by the shift expert: | + | # Shift summary by the shift expert: https://logbooks.jlab.org/entry/3836869 |
− | # Issues: | + | # Issues: the high rates; RTPC HV tripped GEM1 |
− | # Recorded data: | + | # Recorded data: 28M on D2 |
=== Swing shift === | === Swing shift === | ||
− | # Shift summary by the shift expert: | + | # Shift summary by the shift expert: https://logbooks.jlab.org/entry/3837140 |
− | # | + | # Studies: We are back to the beautiful running conditions. Our issue was the entrance angle of the beam to the Hall. We fixed the beam position on 2H01 then we did x and y scans on 2C24 with the BOM and the Downstream Halo counters as our observables. We had to push the beam on x to the maximum left side (-3.7 mm, 4 mm left to the nominal x value we were operating before), which is the limit of the correctors with respect to 2C21. We are running now 240nA beam current on full D2 target, getting trigger rate of 2kHz, DAQ live time of 94% and the DC occupancy is 3.5%. All the detectors' rates are going to the normal rates, which are half of what we were getting lately |
− | # Recorded data: | + | # Recorded data: 3.3M on D2 and now switching to H2 (21:00) |
=== Whole day summary === | === Whole day summary === | ||
− | # Total recorded data today: | + | # Total recorded data today: 50 M on D2 |
− | # Part-II total accumulated data on D2: | + | # Part-II total accumulated data on D2: 1206 M events on D2 |
− | #Concerns: | + | # Concerns: NO more concerns |
Latest revision as of 20:11, 29 August 2020
Back to Run Group F | Daily Run Group F Coordination Meetings
2020
March |
---|
19, 20, 21, 22, 23, 24 |
July |
31 |
August |
1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31 |
September |
1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20 21 |
RC:M. Hattawy
Summary of Aug. 29th
Owl shift
- Shift summary by the shift expert: https://logbooks.jlab.org/entry/3836682
- Issues: Extended DC HV trip in sector 5 region 1
- studies: x-y position on 2H01, x = -0.2mm, y -1.3mm
- Recorded data: 19 M on D2
Day shift
- Shift summary by the shift expert: https://logbooks.jlab.org/entry/3836869
- Issues: the high rates; RTPC HV tripped GEM1
- Recorded data: 28M on D2
Swing shift
- Shift summary by the shift expert: https://logbooks.jlab.org/entry/3837140
- Studies: We are back to the beautiful running conditions. Our issue was the entrance angle of the beam to the Hall. We fixed the beam position on 2H01 then we did x and y scans on 2C24 with the BOM and the Downstream Halo counters as our observables. We had to push the beam on x to the maximum left side (-3.7 mm, 4 mm left to the nominal x value we were operating before), which is the limit of the correctors with respect to 2C21. We are running now 240nA beam current on full D2 target, getting trigger rate of 2kHz, DAQ live time of 94% and the DC occupancy is 3.5%. All the detectors' rates are going to the normal rates, which are half of what we were getting lately
- Recorded data: 3.3M on D2 and now switching to H2 (21:00)
Whole day summary
- Total recorded data today: 50 M on D2
- Part-II total accumulated data on D2: 1206 M events on D2
- Concerns: NO more concerns
Tomorrow daily RC meeting will be at usual time 12:00 PM using the link https://bluejeans.com/7576835804/