Difference between revisions of "RC Meeting: September 10th, 2020"
Jump to navigation
Jump to search
Line 43: | Line 43: | ||
=== Whole day summary === | === Whole day summary === | ||
− | # Total recorded data today: | + | # Total recorded data today: none |
− | # Part-II total accumulated data on D2: | + | # Part-II total accumulated data on D2: 1.66B |
− | #Concerns: | + | #Concerns: none by the end of the swing shift |
Revision as of 06:59, 11 September 2020
Back to Run Group F | Daily Run Group F Coordination Meetings
2020
March |
---|
19, 20, 21, 22, 23, 24 |
July |
31 |
August |
1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31 |
September |
1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20 21 |
RC:
Summary of Sep. 10th
Owl shift
- Shift summary by the shift expert: https://logbooks.jlab.org/entry/3844919
- Issues: Finished fixing the BOM and the installing the new beamline exit window. Beam first delivery at 3 AM on the tagger for harp scans and a Moller run. Waited for MCC to send some one to tune the BPM.
- Recorded data: None
Day shift
- Shift summary by the shift expert: https://logbooks.jlab.org/entry/3845226
- Issues: BPM got tuned at 9 AM. Then beam went down for 4 hours to fix the Hall B/C seprator. beam back around 13:30 PM totally bad. Extremly high counts on the US halo counter. Contacted MCC and then found that the seprator had issues that might caused the high rates. magnet power supply problem on the accelrator.
- Recorded data: None
Swing shift
- Shift summary by the shift expert: https://logbooks.jlab.org/entry/3845462
- Issues: did the target scan and found now positions on 2H01 (x= +1.6, y=-1.9). We still see high rates at the upstream halo counter. We solved it by shifting the beam back to normal positions on 2c24 (-1.6mm, -0.5mm) and new target scan resulted a new position on 2H01 to (+0.7, -1.6).
- Recorded data: none
Whole day summary
- Total recorded data today: none
- Part-II total accumulated data on D2: 1.66B
- Concerns: none by the end of the swing shift
Tomorrow daily RC meeting will be at usual time 12:00 PM using the link https://bluejeans.com/7576835804/