Difference between revisions of "RC Meeting: September 11th, 2020"

From clas12-run
Jump to navigation Jump to search
Line 33: Line 33:
  
 
=== Day shift ===
 
=== Day shift ===
# Shift summary by the shift expert:  
+
# Shift summary by the shift expert: https://logbooks.jlab.org/entry/3845976
# Issues:  
+
# Issues: beam down at 9:40 AM - ... (1L20 tripped due to low liquid level, 5th Pass H. Separator:cabling is heating up, three dipoles tripped off(BSY1C, 2C, 3C))
# Recorded data:  
+
# Recorded data: 3M on D2 (240 nA)
  
 
=== Swing shift ===
 
=== Swing shift ===

Revision as of 10:06, 11 September 2020

Back to Run Group F | Daily Run Group F Coordination Meetings


2020

March
19, 20, 21, 22, 23, 24
July
31
August
1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31
September
1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20 21

RC:

Summary of Sep. 11th

Owl shift

  1. Shift summary by the shift expert:https://logbooks.jlab.org/entry/3845749
  2. Issues: started production with 200nA->240nA. the beam went down at 2:20 AM (ion pump is dead in the south linac) shifted ended before beam back.
  3. Recorded data: 8M on D2

Day shift

  1. Shift summary by the shift expert: https://logbooks.jlab.org/entry/3845976
  2. Issues: beam down at 9:40 AM - ... (1L20 tripped due to low liquid level, 5th Pass H. Separator:cabling is heating up, three dipoles tripped off(BSY1C, 2C, 3C))
  3. Recorded data: 3M on D2 (240 nA)

Swing shift

  1. Shift summary by the shift expert:
  2. Issues:
  3. Recorded data:

Whole day summary

  1. Total recorded data today:
  2. Part-II total accumulated data on D2:
  3. Concerns:


Tomorrow daily RC meeting will be at usual time 12:00 PM using the link https://bluejeans.com/7576835804/

Recorded data numbers

Number of events recorded