Difference between revisions of "PRad Experiment Readiness Review"
From Pcrewiki
Jump to navigationJump to search (→Agenda) |
|||
(49 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
+ | ==[https://wiki.jlab.org/pcrewiki/images/c/c8/PRad_Experiment_Readiness_Review_Committee.pdf Review committe]== | ||
+ | ==[https://wiki.jlab.org/pcrewiki/images/d/d6/PRad_Experiment_Readiness_Review_CHARGE.pdf Charge to the committee]== | ||
+ | ==[https://wiki.jlab.org/pcrewiki/images/8/8a/PRad_ERR_2_final.pdf '''PRad ERR Final Report''']== | ||
+ | ='''The review will take place March 25, 2016 at 9:00 in L102'''= | ||
− | + | ===[https://wiki.jlab.org/pcrewiki/images/8/88/PRad_ERR_final.pdf Final Report from Previous Round]=== | |
− | *[https://wiki.jlab.org/pcrewiki/images/c/ | + | ==Agenda== |
− | *[https://wiki.jlab.org/pcrewiki/images/ | + | * '''9:00''' Executive Session /10 min/ |
+ | * '''9:10''' [https://wiki.jlab.org/pcrewiki/images/5/52/Gasparian_ERR_0325_2016.pdf Equipment and installation status, run plan] (1.1, 2.1, 2.1, 4.1, 5.1, 7.2)– ''Ashot Gasparyan /30+15 min/'' | ||
+ | ** [https://wiki.jlab.org/pcrewiki/images/1/10/PRad_Beam_Comm_and_Run_Plan.pdf Draft Run Plan] | ||
+ | * '''9:55''' [https://wiki.jlab.org/pcrewiki/images/f/ff/KG_pRadReadinessReview_20160325.pdf GEM and its DAQ system] (7.1, 7.2) – Kondo Gnanvo /20+10 min/ | ||
+ | ** [https://wiki.jlab.org/pcrewiki/images/c/cb/Prad_daq.pdf GEM DAQ report] | ||
+ | * '''10:25''' [https://wiki.jlab.org/pcrewiki/images/e/e0/PRad-ERR_HGao.pdf Manpower, data analysis procedure, expected results] (1.1,3, 7.3) – Haiyan Gao /20+10 min/ | ||
+ | * '''10:55''' [https://wiki.jlab.org/pcrewiki/images/b/b7/PRAD_Documentation.pdf Run documentation] (8) – Eugene Pasyuk /10+5 min/ | ||
+ | * '''11:10''' ''Coffee Break'' /15 min/ | ||
+ | * '''11:25''' Discussion /20 min/ | ||
+ | * '''11:45''' Executive Session /30 min/ | ||
+ | * '''12:15''' Closeout | ||
+ | (*) - items of the [https://wiki.jlab.org/pcrewiki/images/8/88/PRad_ERR_final.pdf previous committee report] covered in the presentation | ||
+ | ==Documents== | ||
+ | ===Run documentation=== | ||
+ | * [https://wiki.jlab.org/pcrewiki/images/c/c1/COO_HallB-PRAD.pdf PRad Conduct of Operations (COO)] | ||
+ | * [https://wiki.jlab.org/pcrewiki/images/b/bb/Osp.pdf PRad Experiment Safety Assesment Document (ESAD)] | ||
+ | * [https://wiki.jlab.org/pcrewiki/images/f/fa/RSAD_PRad_HallB_2015.pdf Radiation Safety Assesment Document (RSAD)] | ||
+ | * [https://wiki.jlab.org/pcrewiki/images/0/02/Hall-B_ERG.pdf Hall B Emergency Responce Guidelines (ERG)] | ||
+ | * [https://wiki.jlab.org/pcrewiki/images/3/3b/HCO.pdf Pre-run checkout] | ||
− | =[https://wiki.jlab.org/pcrewiki/images/d/d7/Preliminary_Agenda_Nov_12_2015_v4.pdf Agenda]= | + | ===Operational procedures=== |
+ | |||
+ | ====PRad Target==== | ||
+ | |||
+ | *[https://wiki.jlab.org/pcrewiki/images/b/b4/PRadTarget_OSP.pdf PRad Target OSP] | ||
+ | *[https://wiki.jlab.org/pcrewiki/images/5/55/PRadTarget_THA.pdf PRad Target Task Hazard Analysis Worksheet] | ||
+ | *[https://wiki.jlab.org/pcrewiki/images/3/30/HazardAnalysis_PRadTarget.pdf PRad Target Task Hazard Analysis] | ||
+ | *[https://wiki.jlab.org/pcrewiki/images/3/33/Operation_PRad_Target.pdf PRad Target Operation procedures] | ||
+ | |||
+ | ====HyCal==== | ||
+ | |||
+ | *[https://wiki.jlab.org/pcrewiki/images/a/a6/HYCAL_OSP.pdf HyCal OSP] | ||
+ | *[https://wiki.jlab.org/pcrewiki/images/0/06/HYCAL_THA.pdf HyCal Task Hazard Analysis Worksheet] | ||
+ | *[https://wiki.jlab.org/pcrewiki/images/5/5d/HYCAL_manual.pdf HyCal Manual] | ||
+ | *[https://wiki.jlab.org/pcrewiki/images/4/4d/HYCAL_transporter_procedures.pdf HyCal Transporter Procedures] | ||
+ | |||
+ | ==== PRad GEM ==== | ||
+ | |||
+ | *[https://wiki.jlab.org/pcrewiki/images/3/37/GEM_THA.pdf PRad GEM Task Hazard Analysis Worksheet] | ||
+ | *[https://wiki.jlab.org/pcrewiki/images/9/98/Gem_manual.pdf PRad GEM Manual] | ||
+ | * The highest risk code before mitigation determined to be 1. Therefore a formal OSP is not required | ||
+ | |||
+ | ==== PRad Vacuum Chamber ==== | ||
+ | |||
+ | |||
+ | *[https://wiki.jlab.org/pcrewiki/images/5/50/PRAD_Vacuum_tank_OSP_V2.pdf PRad Vacuum Chamber OSP (Draft)] | ||
+ | *[https://wiki.jlab.org/pcrewiki/images/3/33/PRAD_Vacuim_tank_THA.pdf PRad Vacuum Chamber Target Task Hazard Analysis Worksheet] | ||
+ | *[https://wiki.jlab.org/pcrewiki/images/e/ed/PRad_Vacuum_Tank_Window_Design.pdf PRad vacuum tank window design and test] | ||
+ | |||
+ | ='''The review will take place November 12, 2015 at 8:30 am in L102'''= | ||
+ | |||
+ | |||
+ | |||
+ | ==[https://wiki.jlab.org/pcrewiki/images/d/d7/Preliminary_Agenda_Nov_12_2015_v4.pdf Agenda]== | ||
Line 16: | Line 71: | ||
* '''9:15''' [https://wiki.jlab.org/pcrewiki/images/1/1e/Gasparian_Red_Review_Nov_12_2015.pdf Overview of the experimental setup, required beam parameters, alignment, HyCal, run plan] (30 minutes) - ''Ashot Gasparian'' | * '''9:15''' [https://wiki.jlab.org/pcrewiki/images/1/1e/Gasparian_Red_Review_Nov_12_2015.pdf Overview of the experimental setup, required beam parameters, alignment, HyCal, run plan] (30 minutes) - ''Ashot Gasparian'' | ||
** [https://wiki.jlab.org/pcrewiki/images/1/18/PRad_Beam_Commissioning_and_Run_Plan.pdf Draft Run plan] | ** [https://wiki.jlab.org/pcrewiki/images/1/18/PRad_Beam_Commissioning_and_Run_Plan.pdf Draft Run plan] | ||
− | * '''9:45''' Coexistence with CLAS12 project, including discussion of schedule, manpower needs, service provider needs, and infrastructure requirements (30 min) - ''Eugene Pasyuk'' | + | * '''9:45''' [https://wiki.jlab.org/pcrewiki/images/2/23/PRAD_ERR_Installation.pdf Coexistence with CLAS12 project, including discussion of schedule, manpower needs, service provider needs, and infrastructure requirements] (30 min) - ''Eugene Pasyuk'' |
** [https://wiki.jlab.org/pcrewiki/images/d/d2/HPS_to_PRAD_conversion_v2.pdf PRad Installation Schedule] | ** [https://wiki.jlab.org/pcrewiki/images/d/d2/HPS_to_PRAD_conversion_v2.pdf PRad Installation Schedule] | ||
** [https://wiki.jlab.org/pcrewiki/images/e/ea/CLAS12activities.pdf CLAS12 activities] | ** [https://wiki.jlab.org/pcrewiki/images/e/ea/CLAS12activities.pdf CLAS12 activities] | ||
Line 23: | Line 78: | ||
** [https://wiki.jlab.org/pcrewiki/images/3/30/HazardAnalysis_PRadTarget.pdf PRad target manual and hazard analysis] | ** [https://wiki.jlab.org/pcrewiki/images/3/30/HazardAnalysis_PRadTarget.pdf PRad target manual and hazard analysis] | ||
** [https://wiki.jlab.org/pcrewiki/images/2/25/PRad_Target_Operations.pdf PRad target operation manual] | ** [https://wiki.jlab.org/pcrewiki/images/2/25/PRad_Target_Operations.pdf PRad target operation manual] | ||
− | * '''10:50''' GEM and DAQ integration (20 min) - '' | + | * '''10:50'''[https://wiki.jlab.org/pcrewiki/images/9/91/KG_pRadReadinessReview_20151112.pdf GEM and DAQ integration] (20 min) - ''Kondo Gnanvo'' |
* '''11:10''' [https://wiki.jlab.org/pcrewiki/images/e/e7/DAQ_and_software.pdf DAQ, on-line and off-line software] (20 min) - ''Chao Peng'' | * '''11:10''' [https://wiki.jlab.org/pcrewiki/images/e/e7/DAQ_and_software.pdf DAQ, on-line and off-line software] (20 min) - ''Chao Peng'' | ||
− | * '''11:30''' Engineering aspects: beam line, vacuum vessel, window, installation, safety (30 min) - ''Bob Miller'' | + | * '''11:30''' [https://wiki.jlab.org/pcrewiki/images/d/db/PRad_ERR_Design_and_Engineering.pdf Engineering aspects: beam line, vacuum vessel, window, installation, safety] (30 min) - ''Bob Miller'' |
− | * '''12:00''' PRad Beam Commissioning and Procedures (20 min) - '' | + | * '''12:00'''[https://wiki.jlab.org/pcrewiki/images/5/51/ERR_PRad_Beamline.pdf PRad Beam Commissioning and Procedures] (20 min) - ''Mike Spata'' |
− | * '''12:20'''[https://wiki.jlab.org/pcrewiki/images/a/a5/Prad_hazana.pdf Run documentation COO, ESAD, RSAD, etc.] (30 min) - ''Dipangkar | + | * '''12:20'''[https://wiki.jlab.org/pcrewiki/images/a/a5/Prad_hazana.pdf Run documentation COO, ESAD, RSAD, etc.] (30 min) - ''Dipangkar Dutta'' |
** [https://wiki.jlab.org/pcrewiki/images/c/c1/COO_HallB-PRAD.pdf PRad Conduct of Operations Document (COO)] | ** [https://wiki.jlab.org/pcrewiki/images/c/c1/COO_HallB-PRAD.pdf PRad Conduct of Operations Document (COO)] | ||
** [https://wiki.jlab.org/pcrewiki/images/b/bb/Osp.pdf PRad Experiment Safety Assesment Document (ESAD)] | ** [https://wiki.jlab.org/pcrewiki/images/b/bb/Osp.pdf PRad Experiment Safety Assesment Document (ESAD)] | ||
Line 35: | Line 90: | ||
* '''12:50''' ''Lunch'' | * '''12:50''' ''Lunch'' | ||
* '''13:30''' Executive Session | * '''13:30''' Executive Session | ||
− | * '''15:30''' Closeout | + | * '''15:30''' [https://wiki.jlab.org/pcrewiki/images/1/1a/ERR_closeout.pdf Closeout] |
+ | |||
+ | |||
+ | ===[https://wiki.jlab.org/pcrewiki/images/8/88/PRad_ERR_final.pdf Final Report]=== | ||
=Materials for ERR= | =Materials for ERR= | ||
Line 44: | Line 102: | ||
*[https://wiki.jlab.org/pcrewiki/images/5/5d/PRad-Physics_HGao.pdf Physics goals of PRad experiment] | *[https://wiki.jlab.org/pcrewiki/images/5/5d/PRad-Physics_HGao.pdf Physics goals of PRad experiment] | ||
*[https://wiki.jlab.org/pcrewiki/images/1/1e/Gasparian_Red_Review_Nov_12_2015.pdf Overview of the experimental setup] | *[https://wiki.jlab.org/pcrewiki/images/1/1e/Gasparian_Red_Review_Nov_12_2015.pdf Overview of the experimental setup] | ||
− | *[https:// | + | *[https://wiki.jlab.org/pcrewiki/images/2/23/PRAD_ERR_Installation.pdf Coexistence with CLAS12 project] |
*[https://wiki.jlab.org/pcrewiki/images/d/d1/PRadTargetReviewSlides.pdf Target] | *[https://wiki.jlab.org/pcrewiki/images/d/d1/PRadTargetReviewSlides.pdf Target] | ||
− | *[https:// | + | *[https://wiki.jlab.org/pcrewiki/images/9/91/KG_pRadReadinessReview_20151112.pdf GEM and DAQ integration] |
*[https://wiki.jlab.org/pcrewiki/images/e/e7/DAQ_and_software.pdf DAQ, on-line and off-line software] | *[https://wiki.jlab.org/pcrewiki/images/e/e7/DAQ_and_software.pdf DAQ, on-line and off-line software] | ||
− | *[https:// | + | *[https://wiki.jlab.org/pcrewiki/images/d/db/PRad_ERR_Design_and_Engineering.pdf Engineering aspects] |
− | *[https:// | + | *[https://wiki.jlab.org/pcrewiki/images/5/51/ERR_PRad_Beamline.pdf PRad Beam Commissioning and Procedures] |
*[https://wiki.jlab.org/pcrewiki/images/a/a5/Prad_hazana.pdf Run Documentation] | *[https://wiki.jlab.org/pcrewiki/images/a/a5/Prad_hazana.pdf Run Documentation] | ||
Line 59: | Line 117: | ||
** [https://wiki.jlab.org/pcrewiki/images/e/ea/CLAS12activities.pdf CLAS12 activities] | ** [https://wiki.jlab.org/pcrewiki/images/e/ea/CLAS12activities.pdf CLAS12 activities] | ||
** [https://wiki.jlab.org/pcrewiki/images/e/e1/12_GeV_Current_Schedule1_-_October_2015_progress.pdf 12GeV project schedule] | ** [https://wiki.jlab.org/pcrewiki/images/e/e1/12_GeV_Current_Schedule1_-_October_2015_progress.pdf 12GeV project schedule] | ||
+ | ** [https://wiki.jlab.org/pcrewiki/images/1/18/PRad_Beam_Commissioning_and_Run_Plan.pdf Draft Run plan] | ||
* Target | * Target | ||
** [https://wiki.jlab.org/pcrewiki/images/3/30/HazardAnalysis_PRadTarget.pdf PRad target manual and hazard analysis] | ** [https://wiki.jlab.org/pcrewiki/images/3/30/HazardAnalysis_PRadTarget.pdf PRad target manual and hazard analysis] |
Latest revision as of 11:37, 29 March 2016
Review committe
Charge to the committee
PRad ERR Final Report
The review will take place March 25, 2016 at 9:00 in L102
Final Report from Previous Round
Agenda
- 9:00 Executive Session /10 min/
- 9:10 Equipment and installation status, run plan (1.1, 2.1, 2.1, 4.1, 5.1, 7.2)– Ashot Gasparyan /30+15 min/
- 9:55 GEM and its DAQ system (7.1, 7.2) – Kondo Gnanvo /20+10 min/
- 10:25 Manpower, data analysis procedure, expected results (1.1,3, 7.3) – Haiyan Gao /20+10 min/
- 10:55 Run documentation (8) – Eugene Pasyuk /10+5 min/
- 11:10 Coffee Break /15 min/
- 11:25 Discussion /20 min/
- 11:45 Executive Session /30 min/
- 12:15 Closeout
(*) - items of the previous committee report covered in the presentation
Documents
Run documentation
- PRad Conduct of Operations (COO)
- PRad Experiment Safety Assesment Document (ESAD)
- Radiation Safety Assesment Document (RSAD)
- Hall B Emergency Responce Guidelines (ERG)
- Pre-run checkout
Operational procedures
PRad Target
- PRad Target OSP
- PRad Target Task Hazard Analysis Worksheet
- PRad Target Task Hazard Analysis
- PRad Target Operation procedures
HyCal
PRad GEM
- PRad GEM Task Hazard Analysis Worksheet
- PRad GEM Manual
- The highest risk code before mitigation determined to be 1. Therefore a formal OSP is not required
PRad Vacuum Chamber
- PRad Vacuum Chamber OSP (Draft)
- PRad Vacuum Chamber Target Task Hazard Analysis Worksheet
- PRad vacuum tank window design and test
The review will take place November 12, 2015 at 8:30 am in L102
Agenda
- 8:30 Executive Session
- 9:00 Physics goals of the PRad experiment (15 min) - Haiyan Gao
- 9:15 Overview of the experimental setup, required beam parameters, alignment, HyCal, run plan (30 minutes) - Ashot Gasparian
- 9:45 Coexistence with CLAS12 project, including discussion of schedule, manpower needs, service provider needs, and infrastructure requirements (30 min) - Eugene Pasyuk
- 10:15 Coffee Break
- 10:30 Target: parameters, safety (20 min) - Chris Keith
- 10:50 GEM and DAQ integration (20 min) - Kondo Gnanvo
- 11:10 DAQ, on-line and off-line software (20 min) - Chao Peng
- 11:30 Engineering aspects: beam line, vacuum vessel, window, installation, safety (30 min) - Bob Miller
- 12:00 PRad Beam Commissioning and Procedures (20 min) - Mike Spata
- 12:20 Run documentation COO, ESAD, RSAD, etc. (30 min) - Dipangkar Dutta
- 12:50 Lunch
- 13:30 Executive Session
- 15:30 Closeout
Final Report
Materials for ERR
Presentations
- Physics goals of PRad experiment
- Overview of the experimental setup
- Coexistence with CLAS12 project
- Target
- GEM and DAQ integration
- DAQ, on-line and off-line software
- Engineering aspects
- PRad Beam Commissioning and Procedures
- Run Documentation
Documentation
- Proposal of the E12-11-106 (PRad) experiment
- Schedules
- Target
- Vacuum vessel
- Run documentation