Difference between revisions of "PRad Experiment Readiness Review"
From Pcrewiki
Jump to navigationJump to searchLine 1: | Line 1: | ||
==[https://wiki.jlab.org/pcrewiki/images/c/c8/PRad_Experiment_Readiness_Review_Committee.pdf Review committe]== | ==[https://wiki.jlab.org/pcrewiki/images/c/c8/PRad_Experiment_Readiness_Review_Committee.pdf Review committe]== | ||
==[https://wiki.jlab.org/pcrewiki/images/d/d6/PRad_Experiment_Readiness_Review_CHARGE.pdf Charge to the committee]== | ==[https://wiki.jlab.org/pcrewiki/images/d/d6/PRad_Experiment_Readiness_Review_CHARGE.pdf Charge to the committee]== | ||
− | ==[https://wiki.jlab.org/pcrewiki/images/8/8a/PRad_ERR_2_final.pdf PRad ERR Final Report]== | + | ==[https://wiki.jlab.org/pcrewiki/images/8/8a/PRad_ERR_2_final.pdf '''PRad ERR Final Report''']== |
− | |||
− | |||
− | |||
='''The review will take place March 25, 2016 at 9:00 in L102'''= | ='''The review will take place March 25, 2016 at 9:00 in L102'''= |
Latest revision as of 11:37, 29 March 2016
Review committe
Charge to the committee
PRad ERR Final Report
The review will take place March 25, 2016 at 9:00 in L102
Final Report from Previous Round
Agenda
- 9:00 Executive Session /10 min/
- 9:10 Equipment and installation status, run plan (1.1, 2.1, 2.1, 4.1, 5.1, 7.2)– Ashot Gasparyan /30+15 min/
- 9:55 GEM and its DAQ system (7.1, 7.2) – Kondo Gnanvo /20+10 min/
- 10:25 Manpower, data analysis procedure, expected results (1.1,3, 7.3) – Haiyan Gao /20+10 min/
- 10:55 Run documentation (8) – Eugene Pasyuk /10+5 min/
- 11:10 Coffee Break /15 min/
- 11:25 Discussion /20 min/
- 11:45 Executive Session /30 min/
- 12:15 Closeout
(*) - items of the previous committee report covered in the presentation
Documents
Run documentation
- PRad Conduct of Operations (COO)
- PRad Experiment Safety Assesment Document (ESAD)
- Radiation Safety Assesment Document (RSAD)
- Hall B Emergency Responce Guidelines (ERG)
- Pre-run checkout
Operational procedures
PRad Target
- PRad Target OSP
- PRad Target Task Hazard Analysis Worksheet
- PRad Target Task Hazard Analysis
- PRad Target Operation procedures
HyCal
PRad GEM
- PRad GEM Task Hazard Analysis Worksheet
- PRad GEM Manual
- The highest risk code before mitigation determined to be 1. Therefore a formal OSP is not required
PRad Vacuum Chamber
- PRad Vacuum Chamber OSP (Draft)
- PRad Vacuum Chamber Target Task Hazard Analysis Worksheet
- PRad vacuum tank window design and test
The review will take place November 12, 2015 at 8:30 am in L102
Agenda
- 8:30 Executive Session
- 9:00 Physics goals of the PRad experiment (15 min) - Haiyan Gao
- 9:15 Overview of the experimental setup, required beam parameters, alignment, HyCal, run plan (30 minutes) - Ashot Gasparian
- 9:45 Coexistence with CLAS12 project, including discussion of schedule, manpower needs, service provider needs, and infrastructure requirements (30 min) - Eugene Pasyuk
- 10:15 Coffee Break
- 10:30 Target: parameters, safety (20 min) - Chris Keith
- 10:50 GEM and DAQ integration (20 min) - Kondo Gnanvo
- 11:10 DAQ, on-line and off-line software (20 min) - Chao Peng
- 11:30 Engineering aspects: beam line, vacuum vessel, window, installation, safety (30 min) - Bob Miller
- 12:00 PRad Beam Commissioning and Procedures (20 min) - Mike Spata
- 12:20 Run documentation COO, ESAD, RSAD, etc. (30 min) - Dipangkar Dutta
- 12:50 Lunch
- 13:30 Executive Session
- 15:30 Closeout
Final Report
Materials for ERR
Presentations
- Physics goals of PRad experiment
- Overview of the experimental setup
- Coexistence with CLAS12 project
- Target
- GEM and DAQ integration
- DAQ, on-line and off-line software
- Engineering aspects
- PRad Beam Commissioning and Procedures
- Run Documentation
Documentation
- Proposal of the E12-11-106 (PRad) experiment
- Schedules
- Target
- Vacuum vessel
- Run documentation