Difference between revisions of "PRad Experiment Readiness Review"
From Pcrewiki
Jump to navigationJump to search (→Agenda) |
|||
(12 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
− | + | ==[https://wiki.jlab.org/pcrewiki/images/c/c8/PRad_Experiment_Readiness_Review_Committee.pdf Review committe]== | |
− | + | ==[https://wiki.jlab.org/pcrewiki/images/d/d6/PRad_Experiment_Readiness_Review_CHARGE.pdf Charge to the committee]== | |
− | + | ==[https://wiki.jlab.org/pcrewiki/images/8/8a/PRad_ERR_2_final.pdf '''PRad ERR Final Report''']== | |
='''The review will take place March 25, 2016 at 9:00 in L102'''= | ='''The review will take place March 25, 2016 at 9:00 in L102'''= | ||
Line 9: | Line 9: | ||
==Agenda== | ==Agenda== | ||
* '''9:00''' Executive Session /10 min/ | * '''9:00''' Executive Session /10 min/ | ||
− | * '''9:10''' Equipment and installation status, run plan | + | * '''9:10''' [https://wiki.jlab.org/pcrewiki/images/5/52/Gasparian_ERR_0325_2016.pdf Equipment and installation status, run plan] (1.1, 2.1, 2.1, 4.1, 5.1, 7.2)– ''Ashot Gasparyan /30+15 min/'' |
** [https://wiki.jlab.org/pcrewiki/images/1/10/PRad_Beam_Comm_and_Run_Plan.pdf Draft Run Plan] | ** [https://wiki.jlab.org/pcrewiki/images/1/10/PRad_Beam_Comm_and_Run_Plan.pdf Draft Run Plan] | ||
− | * '''9:55''' GEM and its DAQ system (7.1, 7.2) – Kondo Gnanvo /20+10 min/ | + | * '''9:55''' [https://wiki.jlab.org/pcrewiki/images/f/ff/KG_pRadReadinessReview_20160325.pdf GEM and its DAQ system] (7.1, 7.2) – Kondo Gnanvo /20+10 min/ |
** [https://wiki.jlab.org/pcrewiki/images/c/cb/Prad_daq.pdf GEM DAQ report] | ** [https://wiki.jlab.org/pcrewiki/images/c/cb/Prad_daq.pdf GEM DAQ report] | ||
− | * '''10:25''' [https://wiki.jlab.org/pcrewiki/images/e/e0/PRad-ERR_HGao.pdf Manpower, data analysis procedure] (1.1,3, 7.3) – Haiyan Gao /20+10 min/ | + | * '''10:25''' [https://wiki.jlab.org/pcrewiki/images/e/e0/PRad-ERR_HGao.pdf Manpower, data analysis procedure, expected results] (1.1,3, 7.3) – Haiyan Gao /20+10 min/ |
− | * '''10:55''' Run documentation (8) – Eugene Pasyuk /10+5 min/ | + | * '''10:55''' [https://wiki.jlab.org/pcrewiki/images/b/b7/PRAD_Documentation.pdf Run documentation] (8) – Eugene Pasyuk /10+5 min/ |
* '''11:10''' ''Coffee Break'' /15 min/ | * '''11:10''' ''Coffee Break'' /15 min/ | ||
* '''11:25''' Discussion /20 min/ | * '''11:25''' Discussion /20 min/ | ||
Line 20: | Line 20: | ||
* '''12:15''' Closeout | * '''12:15''' Closeout | ||
− | + | (*) - items of the [https://wiki.jlab.org/pcrewiki/images/8/88/PRad_ERR_final.pdf previous committee report] covered in the presentation | |
==Documents== | ==Documents== | ||
Line 49: | Line 49: | ||
==== PRad GEM ==== | ==== PRad GEM ==== | ||
− | *[PRad GEM | + | *[https://wiki.jlab.org/pcrewiki/images/3/37/GEM_THA.pdf PRad GEM Task Hazard Analysis Worksheet] |
− | *[https://wiki.jlab.org/pcrewiki/images/9/98/Gem_manual.pdf PRad GEM | + | *[https://wiki.jlab.org/pcrewiki/images/9/98/Gem_manual.pdf PRad GEM Manual] |
+ | * The highest risk code before mitigation determined to be 1. Therefore a formal OSP is not required | ||
==== PRad Vacuum Chamber ==== | ==== PRad Vacuum Chamber ==== | ||
− | *[PRad Vacuum Chamber OSP] | + | *[https://wiki.jlab.org/pcrewiki/images/5/50/PRAD_Vacuum_tank_OSP_V2.pdf PRad Vacuum Chamber OSP (Draft)] |
− | *[PRad Vacuum Chamber Target Task Hazard Analysis Worksheet] | + | *[https://wiki.jlab.org/pcrewiki/images/3/33/PRAD_Vacuim_tank_THA.pdf PRad Vacuum Chamber Target Task Hazard Analysis Worksheet] |
*[https://wiki.jlab.org/pcrewiki/images/e/ed/PRad_Vacuum_Tank_Window_Design.pdf PRad vacuum tank window design and test] | *[https://wiki.jlab.org/pcrewiki/images/e/ed/PRad_Vacuum_Tank_Window_Design.pdf PRad vacuum tank window design and test] | ||
Latest revision as of 11:37, 29 March 2016
Review committe
Charge to the committee
PRad ERR Final Report
The review will take place March 25, 2016 at 9:00 in L102
Final Report from Previous Round
Agenda
- 9:00 Executive Session /10 min/
- 9:10 Equipment and installation status, run plan (1.1, 2.1, 2.1, 4.1, 5.1, 7.2)– Ashot Gasparyan /30+15 min/
- 9:55 GEM and its DAQ system (7.1, 7.2) – Kondo Gnanvo /20+10 min/
- 10:25 Manpower, data analysis procedure, expected results (1.1,3, 7.3) – Haiyan Gao /20+10 min/
- 10:55 Run documentation (8) – Eugene Pasyuk /10+5 min/
- 11:10 Coffee Break /15 min/
- 11:25 Discussion /20 min/
- 11:45 Executive Session /30 min/
- 12:15 Closeout
(*) - items of the previous committee report covered in the presentation
Documents
Run documentation
- PRad Conduct of Operations (COO)
- PRad Experiment Safety Assesment Document (ESAD)
- Radiation Safety Assesment Document (RSAD)
- Hall B Emergency Responce Guidelines (ERG)
- Pre-run checkout
Operational procedures
PRad Target
- PRad Target OSP
- PRad Target Task Hazard Analysis Worksheet
- PRad Target Task Hazard Analysis
- PRad Target Operation procedures
HyCal
PRad GEM
- PRad GEM Task Hazard Analysis Worksheet
- PRad GEM Manual
- The highest risk code before mitigation determined to be 1. Therefore a formal OSP is not required
PRad Vacuum Chamber
- PRad Vacuum Chamber OSP (Draft)
- PRad Vacuum Chamber Target Task Hazard Analysis Worksheet
- PRad vacuum tank window design and test
The review will take place November 12, 2015 at 8:30 am in L102
Agenda
- 8:30 Executive Session
- 9:00 Physics goals of the PRad experiment (15 min) - Haiyan Gao
- 9:15 Overview of the experimental setup, required beam parameters, alignment, HyCal, run plan (30 minutes) - Ashot Gasparian
- 9:45 Coexistence with CLAS12 project, including discussion of schedule, manpower needs, service provider needs, and infrastructure requirements (30 min) - Eugene Pasyuk
- 10:15 Coffee Break
- 10:30 Target: parameters, safety (20 min) - Chris Keith
- 10:50 GEM and DAQ integration (20 min) - Kondo Gnanvo
- 11:10 DAQ, on-line and off-line software (20 min) - Chao Peng
- 11:30 Engineering aspects: beam line, vacuum vessel, window, installation, safety (30 min) - Bob Miller
- 12:00 PRad Beam Commissioning and Procedures (20 min) - Mike Spata
- 12:20 Run documentation COO, ESAD, RSAD, etc. (30 min) - Dipangkar Dutta
- 12:50 Lunch
- 13:30 Executive Session
- 15:30 Closeout
Final Report
Materials for ERR
Presentations
- Physics goals of PRad experiment
- Overview of the experimental setup
- Coexistence with CLAS12 project
- Target
- GEM and DAQ integration
- DAQ, on-line and off-line software
- Engineering aspects
- PRad Beam Commissioning and Procedures
- Run Documentation
Documentation
- Proposal of the E12-11-106 (PRad) experiment
- Schedules
- Target
- Vacuum vessel
- Run documentation