Difference between revisions of "PRad Experiment Readiness Review"

From Pcrewiki
Jump to navigationJump to search
Line 11: Line 11:
 
* '''9:10'''         Equipment and installation status, run plan  (1.1, 2.1, 2.1, 4.1, 5.1, 7.2)– ''Ashot Gasparyan /30+15 min/''
 
* '''9:10'''         Equipment and installation status, run plan  (1.1, 2.1, 2.1, 4.1, 5.1, 7.2)– ''Ashot Gasparyan /30+15 min/''
 
**                      [https://wiki.jlab.org/pcrewiki/images/1/10/PRad_Beam_Comm_and_Run_Plan.pdf Draft Run Plan]
 
**                      [https://wiki.jlab.org/pcrewiki/images/1/10/PRad_Beam_Comm_and_Run_Plan.pdf Draft Run Plan]
* '''9:55'''         GEM and its DAQ system (7.1, 7.2) – Kondo Gnanvo /20+10 min/
+
* '''9:55'''         [https://wiki.jlab.org/pcrewiki/images/f/ff/KG_pRadReadinessReview_20160325.pdf GEM and its DAQ system] (7.1, 7.2) – Kondo Gnanvo /20+10 min/
 
**                          [https://wiki.jlab.org/pcrewiki/images/c/cb/Prad_daq.pdf GEM DAQ report]
 
**                          [https://wiki.jlab.org/pcrewiki/images/c/cb/Prad_daq.pdf GEM DAQ report]
 
* '''10:25'''      [https://wiki.jlab.org/pcrewiki/images/e/e0/PRad-ERR_HGao.pdf Manpower, data analysis procedure, expected results]  (1.1,3, 7.3) – Haiyan Gao /20+10 min/
 
* '''10:25'''      [https://wiki.jlab.org/pcrewiki/images/e/e0/PRad-ERR_HGao.pdf Manpower, data analysis procedure, expected results]  (1.1,3, 7.3) – Haiyan Gao /20+10 min/

Revision as of 22:44, 23 March 2016


The review will take place March 25, 2016 at 9:00 in L102

Final Report from Previous Round

Agenda

[*] - items of the previous committee report covered in the presentation

Documents

Run documentation

Operational procedures

PRad Target

HyCal

PRad GEM

PRad Vacuum Chamber

The review will take place November 12, 2015 at 8:30 am in L102

Agenda

  • 12:50 Lunch
  • 13:30 Executive Session
  • 15:30 Closeout


Final Report

Materials for ERR

Presentations

Documentation