Difference between revisions of "PRad Experiment Readiness Review"

From Pcrewiki
Jump to navigationJump to search
 
(32 intermediate revisions by 2 users not shown)
Line 1: Line 1:
*[https://wiki.jlab.org/pcrewiki/images/c/c8/PRad_Experiment_Readiness_Review_Committee.pdf Review committe]
+
==[https://wiki.jlab.org/pcrewiki/images/c/c8/PRad_Experiment_Readiness_Review_Committee.pdf Review committe]==
*[https://wiki.jlab.org/pcrewiki/images/d/d6/PRad_Experiment_Readiness_Review_CHARGE.pdf Charge to the committee]
+
==[https://wiki.jlab.org/pcrewiki/images/d/d6/PRad_Experiment_Readiness_Review_CHARGE.pdf Charge to the committee]==
 +
==[https://wiki.jlab.org/pcrewiki/images/8/8a/PRad_ERR_2_final.pdf '''PRad ERR Final Report''']==
  
 
+
='''The review will take place March 25, 2016 at 9:00 in L102'''=
='''The review will take place March 25, 2016 at 8:30 in L102'''=
 
  
 
===[https://wiki.jlab.org/pcrewiki/images/8/88/PRad_ERR_final.pdf Final Report from Previous Round]===
 
===[https://wiki.jlab.org/pcrewiki/images/8/88/PRad_ERR_final.pdf Final Report from Previous Round]===
  
 
==Agenda==
 
==Agenda==
 +
* '''9:00''' Executive Session /10 min/
 +
* '''9:10'''         [https://wiki.jlab.org/pcrewiki/images/5/52/Gasparian_ERR_0325_2016.pdf Equipment and installation status, run plan]  (1.1, 2.1, 2.1, 4.1, 5.1, 7.2)– ''Ashot Gasparyan /30+15 min/''
 +
**                      [https://wiki.jlab.org/pcrewiki/images/1/10/PRad_Beam_Comm_and_Run_Plan.pdf Draft Run Plan]
 +
* '''9:55'''         [https://wiki.jlab.org/pcrewiki/images/f/ff/KG_pRadReadinessReview_20160325.pdf GEM and its DAQ system] (7.1, 7.2) – Kondo Gnanvo /20+10 min/
 +
**                          [https://wiki.jlab.org/pcrewiki/images/c/cb/Prad_daq.pdf GEM DAQ report]
 +
* '''10:25'''      [https://wiki.jlab.org/pcrewiki/images/e/e0/PRad-ERR_HGao.pdf Manpower, data analysis procedure, expected results]  (1.1,3, 7.3) – Haiyan Gao /20+10 min/
 +
* '''10:55''' [https://wiki.jlab.org/pcrewiki/images/b/b7/PRAD_Documentation.pdf Run documentation] (8) – Eugene Pasyuk /10+5 min/
 +
* '''11:10''' ''Coffee Break'' /15 min/
 +
* '''11:25'''      Discussion /20 min/
 +
* '''11:45''' Executive Session /30 min/
 +
* '''12:15'''      Closeout
  
 +
(*)  - items of the [https://wiki.jlab.org/pcrewiki/images/8/88/PRad_ERR_final.pdf  previous committee report] covered in the presentation
  
 
==Documents==
 
==Documents==
  
 +
===Run documentation===
 +
* [https://wiki.jlab.org/pcrewiki/images/c/c1/COO_HallB-PRAD.pdf  PRad Conduct of Operations (COO)]
 +
* [https://wiki.jlab.org/pcrewiki/images/b/bb/Osp.pdf PRad Experiment Safety Assesment Document (ESAD)]
 +
* [https://wiki.jlab.org/pcrewiki/images/f/fa/RSAD_PRad_HallB_2015.pdf Radiation Safety Assesment Document (RSAD)]
 +
* [https://wiki.jlab.org/pcrewiki/images/0/02/Hall-B_ERG.pdf Hall B Emergency Responce Guidelines (ERG)]
 +
* [https://wiki.jlab.org/pcrewiki/images/3/3b/HCO.pdf Pre-run checkout]
 +
 +
===Operational procedures===
 +
 +
====PRad Target====
 +
 +
*[https://wiki.jlab.org/pcrewiki/images/b/b4/PRadTarget_OSP.pdf PRad Target OSP]
 +
*[https://wiki.jlab.org/pcrewiki/images/5/55/PRadTarget_THA.pdf PRad Target Task Hazard Analysis Worksheet]
 +
*[https://wiki.jlab.org/pcrewiki/images/3/30/HazardAnalysis_PRadTarget.pdf PRad Target Task Hazard Analysis]
 +
*[https://wiki.jlab.org/pcrewiki/images/3/33/Operation_PRad_Target.pdf PRad Target Operation procedures]
 +
 +
====HyCal====
 +
 +
*[https://wiki.jlab.org/pcrewiki/images/a/a6/HYCAL_OSP.pdf HyCal OSP]
 +
*[https://wiki.jlab.org/pcrewiki/images/0/06/HYCAL_THA.pdf HyCal Task Hazard Analysis Worksheet]
 +
*[https://wiki.jlab.org/pcrewiki/images/5/5d/HYCAL_manual.pdf HyCal Manual]
 +
*[https://wiki.jlab.org/pcrewiki/images/4/4d/HYCAL_transporter_procedures.pdf HyCal Transporter Procedures]
 +
 +
==== PRad GEM ====
 +
 +
*[https://wiki.jlab.org/pcrewiki/images/3/37/GEM_THA.pdf PRad GEM Task Hazard Analysis Worksheet]
 +
*[https://wiki.jlab.org/pcrewiki/images/9/98/Gem_manual.pdf PRad GEM Manual]
 +
* The highest risk code before mitigation determined to be 1. Therefore a formal OSP is not required
 +
 +
==== PRad Vacuum Chamber ====
  
  
 +
*[https://wiki.jlab.org/pcrewiki/images/5/50/PRAD_Vacuum_tank_OSP_V2.pdf PRad Vacuum Chamber OSP (Draft)]
 +
*[https://wiki.jlab.org/pcrewiki/images/3/33/PRAD_Vacuim_tank_THA.pdf PRad Vacuum Chamber Target Task Hazard Analysis Worksheet]
 +
*[https://wiki.jlab.org/pcrewiki/images/e/ed/PRad_Vacuum_Tank_Window_Design.pdf PRad vacuum tank window design and test]
  
 
='''The review will take place November 12, 2015 at 8:30 am in L102'''=
 
='''The review will take place November 12, 2015 at 8:30 am in L102'''=

Latest revision as of 12:37, 29 March 2016

Review committe

Charge to the committee

PRad ERR Final Report

The review will take place March 25, 2016 at 9:00 in L102

Final Report from Previous Round

Agenda

(*) - items of the previous committee report covered in the presentation

Documents

Run documentation

Operational procedures

PRad Target

HyCal

PRad GEM

PRad Vacuum Chamber

The review will take place November 12, 2015 at 8:30 am in L102

Agenda

  • 12:50 Lunch
  • 13:30 Executive Session
  • 15:30 Closeout


Final Report

Materials for ERR

Presentations

Documentation