Difference between revisions of "PRad Experiment Readiness Review"

From Pcrewiki
Jump to navigationJump to search
 
(20 intermediate revisions by the same user not shown)
Line 1: Line 1:
*[https://wiki.jlab.org/pcrewiki/images/c/c8/PRad_Experiment_Readiness_Review_Committee.pdf Review committe]
+
==[https://wiki.jlab.org/pcrewiki/images/c/c8/PRad_Experiment_Readiness_Review_Committee.pdf Review committe]==
*[https://wiki.jlab.org/pcrewiki/images/d/d6/PRad_Experiment_Readiness_Review_CHARGE.pdf Charge to the committee]
+
==[https://wiki.jlab.org/pcrewiki/images/d/d6/PRad_Experiment_Readiness_Review_CHARGE.pdf Charge to the committee]==
 
+
==[https://wiki.jlab.org/pcrewiki/images/8/8a/PRad_ERR_2_final.pdf '''PRad ERR Final Report''']==
  
 
='''The review will take place March 25, 2016 at 9:00 in L102'''=
 
='''The review will take place March 25, 2016 at 9:00 in L102'''=
Line 9: Line 9:
 
==Agenda==
 
==Agenda==
 
* '''9:00''' Executive Session /10 min/
 
* '''9:00''' Executive Session /10 min/
* '''9:10'''         Equipment and installation status, run plan, the expected results. (1.1, 2.1, 2.1, 4.1, 5.1, 7.2)– ''Ashot Gasparyan /30+15 min/''
+
* '''9:10'''         [https://wiki.jlab.org/pcrewiki/images/5/52/Gasparian_ERR_0325_2016.pdf Equipment and installation status, run plan(1.1, 2.1, 2.1, 4.1, 5.1, 7.2)– ''Ashot Gasparyan /30+15 min/''
* '''9:55'''         GEM and its DAQ system (7.1, 7.2) – Kondo Gnanvo /20+10 min/
+
**                      [https://wiki.jlab.org/pcrewiki/images/1/10/PRad_Beam_Comm_and_Run_Plan.pdf Draft Run Plan]
* '''10:25'''      Manpower, data analysis procedure (3, 7.3) – Haiyan Gao /20+10 min/
+
* '''9:55'''         [https://wiki.jlab.org/pcrewiki/images/f/ff/KG_pRadReadinessReview_20160325.pdf GEM and its DAQ system] (7.1, 7.2) – Kondo Gnanvo /20+10 min/
* '''10:55''' Run documentation (8) – Eugene Pasyuk /10+5 min/
+
**                          [https://wiki.jlab.org/pcrewiki/images/c/cb/Prad_daq.pdf GEM DAQ report]
 +
* '''10:25'''      [https://wiki.jlab.org/pcrewiki/images/e/e0/PRad-ERR_HGao.pdf Manpower, data analysis procedure, expected results]  (1.1,3, 7.3) – Haiyan Gao /20+10 min/
 +
* '''10:55''' [https://wiki.jlab.org/pcrewiki/images/b/b7/PRAD_Documentation.pdf Run documentation] (8) – Eugene Pasyuk /10+5 min/
 
* '''11:10''' ''Coffee Break'' /15 min/
 
* '''11:10''' ''Coffee Break'' /15 min/
 
* '''11:25'''      Discussion /20 min/
 
* '''11:25'''      Discussion /20 min/
Line 18: Line 20:
 
* '''12:15'''      Closeout
 
* '''12:15'''      Closeout
  
[*] - items of the [https://wiki.jlab.org/pcrewiki/images/8/88/PRad_ERR_final.pdf  previous committee report] covered in the presentation
+
(*) - items of the [https://wiki.jlab.org/pcrewiki/images/8/88/PRad_ERR_final.pdf  previous committee report] covered in the presentation
  
 
==Documents==
 
==Documents==
Line 26: Line 28:
 
* [https://wiki.jlab.org/pcrewiki/images/b/bb/Osp.pdf PRad Experiment Safety Assesment Document (ESAD)]
 
* [https://wiki.jlab.org/pcrewiki/images/b/bb/Osp.pdf PRad Experiment Safety Assesment Document (ESAD)]
 
* [https://wiki.jlab.org/pcrewiki/images/f/fa/RSAD_PRad_HallB_2015.pdf Radiation Safety Assesment Document (RSAD)]
 
* [https://wiki.jlab.org/pcrewiki/images/f/fa/RSAD_PRad_HallB_2015.pdf Radiation Safety Assesment Document (RSAD)]
* [https://www.jlab.org/Hall-B/run-web/hps/Hall-B_ERG.pdf Hall B Emergency Responce Guidelines (ERG)]
+
* [https://wiki.jlab.org/pcrewiki/images/0/02/Hall-B_ERG.pdf Hall B Emergency Responce Guidelines (ERG)]
 
+
* [https://wiki.jlab.org/pcrewiki/images/3/3b/HCO.pdf Pre-run checkout]
  
 
===Operational procedures===
 
===Operational procedures===
Line 47: Line 49:
 
==== PRad GEM ====
 
==== PRad GEM ====
  
*[PRad GEM Target Task Hazard Analysis Worksheet]
+
*[https://wiki.jlab.org/pcrewiki/images/3/37/GEM_THA.pdf PRad GEM Task Hazard Analysis Worksheet]
*[https://wiki.jlab.org/pcrewiki/images/9/98/Gem_manual.pdf PRad GEM Operation procedures]
+
*[https://wiki.jlab.org/pcrewiki/images/9/98/Gem_manual.pdf PRad GEM Manual]
 +
* The highest risk code before mitigation determined to be 1. Therefore a formal OSP is not required
  
 
==== PRad Vacuum Chamber ====
 
==== PRad Vacuum Chamber ====
  
  
*[PRad Vacuum Chamber OSP]
+
*[https://wiki.jlab.org/pcrewiki/images/5/50/PRAD_Vacuum_tank_OSP_V2.pdf PRad Vacuum Chamber OSP (Draft)]
*[PRad Vacuum Chamber Target Task Hazard Analysis Worksheet]
+
*[https://wiki.jlab.org/pcrewiki/images/3/33/PRAD_Vacuim_tank_THA.pdf PRad Vacuum Chamber Target Task Hazard Analysis Worksheet]
 
+
*[https://wiki.jlab.org/pcrewiki/images/e/ed/PRad_Vacuum_Tank_Window_Design.pdf PRad vacuum tank window design and test]
 
 
 
 
 
 
 
 
 
 
 
 
  
 
='''The review will take place November 12, 2015 at 8:30 am in L102'''=
 
='''The review will take place November 12, 2015 at 8:30 am in L102'''=

Latest revision as of 12:37, 29 March 2016

Review committe

Charge to the committee

PRad ERR Final Report

The review will take place March 25, 2016 at 9:00 in L102

Final Report from Previous Round

Agenda

(*) - items of the previous committee report covered in the presentation

Documents

Run documentation

Operational procedures

PRad Target

HyCal

PRad GEM

PRad Vacuum Chamber

The review will take place November 12, 2015 at 8:30 am in L102

Agenda

  • 12:50 Lunch
  • 13:30 Executive Session
  • 15:30 Closeout


Final Report

Materials for ERR

Presentations

Documentation