Uploads by Shujie
Jump to navigation
Jump to search
This special page shows all uploaded files.
Date | Name | Thumbnail | Size | Description | Versions |
---|---|---|---|---|---|
15:24, 11 December 2020 | ARC19356(1).pdf (file) | 232 KB | scattering chamber for tritium experiment E12-11-112 | 1 | |
20:40, 10 December 2020 | TGT-CALC-17-020.pdf (file) | 13.71 MB | Updated version of tritium target report, December 2020 | 1 | |
16:50, 28 February 2019 | TGT-RPT-17-007.pdf (file) | 832 KB | target report for the 2017 dec / 2018 spring tritium run | 1 | |
14:57, 8 November 2018 | Find the Hydrogen in Tritium.pdf (file) | 1.03 MB | 2018 Fall tritium cell hydrogen contamination. First look | 1 | |
16:37, 1 November 2018 | DT A1892.pdf (file) | 77 KB | RHRS survey at 28 degree in the end of 2018 fall x>1 run. | 1 | |
16:46, 25 September 2018 | DT A1883.pdf (file) | 97 KB | LHRS survey, 17 degree, 09182018 | 1 | |
14:53, 25 September 2018 | DT A1886.pdf (file) | 67 KB | RHRS survey 09/18/2018 | 1 | |
13:05, 17 September 2018 | Fall Optics Runplan.pdf (file) | 927 KB | 1 | ||
13:04, 17 September 2018 | DATA VS MC.pdf (file) | 3.35 MB | 5 | ||
13:03, 20 August 2018 | E12-11-112 Run Plan.pdf (file) | 493 KB | 2 | ||
17:22, 7 July 2018 | DT A1855.pdf (file) | 83 KB | LHRS survey, 03.12.2018 | 1 | |
17:22, 7 July 2018 | DT A1854.pdf (file) | 81 KB | RHRS survey, 03.12.2018 | 1 | |
10:07, 26 June 2018 | LHRS Scintillator Calibration.pdf (file) | 1.81 MB | 2 | ||
04:11, 12 June 2018 | VDC Tracking Issue.pdf (file) | 1.41 MB | 3 | ||
12:36, 29 May 2018 | Vdc-tracking.ppx.pdf (file) | 932 KB | 1 | ||
15:07, 15 March 2018 | Beamtrip.pdf (file) | 221 KB | 1 | ||
15:54, 5 March 2018 | Target-density.pdf (file) | 596 KB | 1 | ||
16:19, 8 February 2018 | Equilibrium-shujie.pdf (file) | 10.76 MB | target density time dependence | 1 | |
14:05, 21 November 2017 | Commissioning.pdf (file) | 943 KB | tritium commissioning time estimation | 1 | |
13:00, 31 October 2017 | Chamber.pdf (file) | 803 KB | acceptance at small angle with scattering chamber window frame. two additional slides for trigger tdc signal as seen by trigger supervisor | 1 | |
13:14, 10 October 2017 | Cer.pdf (file) | 107 KB | 2 | ||
13:35, 26 September 2017 | Boiling.pdf (file) | 681 KB | 2 | ||
13:48, 28 March 2017 | Vdc-resolution.pdf (file) | 955 KB | 2 |