Help
Uploads by Poelker
Jump to navigation
Jump to search
This special page shows all uploaded files.
File list
Items per page:
20
50
100
250
500
Search for media name:
Username:
Include old versions of files
Go
First page
Previous page
Next page
Last page
Date
Name
Thumbnail
Size
Description
Versions
11:54, 5 November 2019
MeV beamline layout 11 5 2019.pdf
(
file
)
587 KB
1
11:52, 5 November 2019
MeV beamline spreadsheet.xls
(
file
)
42 KB
1
10:36, 1 November 2019
P&C meeting 10 28 2019.pptx
(
file
)
2.4 MB
1
15:56, 31 October 2019
Mason Stoecker gas brem poster.pptx
(
file
)
4.26 MB
1
16:17, 29 October 2019
ASE approval letter from Site Office.pdf
(
file
)
232 KB
1
12:44, 21 October 2019
HDIce dump testing schedule.xls
(
file
)
19 KB
1
12:43, 21 October 2019
HDIce dump testing schedule.jpg
(
file
)
31 KB
1
08:48, 17 October 2019
JLAAC poelker UITF first draft.pptx
(
file
)
15.47 MB
1
09:25, 14 October 2019
UITF trench shielding with photos.xls
(
file
)
36.15 MB
1
16:32, 11 October 2019
UITF trench foam and shielding.xls
(
file
)
36.15 MB
1
09:10, 8 October 2019
UITF ASE rev0.pdf
(
file
)
882 KB
1
11:37, 6 September 2019
EWPAA 2019 poelker.pptx
(
file
)
26.23 MB
1
12:45, 21 August 2019
Modeling thin GaAs photocathodes.pdf
(
file
)
2.25 MB
1
14:23, 18 July 2019
Modifications to beamline.pdf
(
file
)
19 KB
1
15:10, 2 July 2019
UITF ARR brief summary report.pdf
(
file
)
312 KB
1
15:50, 25 June 2019
UITF sweep procedure S6024.pdf
(
file
)
198 KB
1
12:41, 21 June 2019
UOD version June 21, 2019.pdf
(
file
)
1.95 MB
1
10:08, 21 June 2019
UITF Cave2 ceiling roof tile removal THA.pdf
(
file
)
588 KB
1
10:08, 21 June 2019
UITF Cave2 ceiling roof tile removal OSP.pdf
(
file
)
1.98 MB
1
10:05, 21 June 2019
UITF Cave2 ceiling roof tile removal OSP.docx
(
file
)
9.54 MB
2
12:46, 15 June 2019
Summary report UITF Conduct of Operations Review.docx
(
file
)
20 KB
1
15:38, 16 May 2019
JLAB-TN-18-020 Radiation Safety Aspects of the Upgraded Injector Test Facility Vashek Vylet.docx
(
file
)
3.75 MB
1
13:20, 15 May 2019
CIS to-do list today, May 2019.docx
(
file
)
26 KB
1
13:19, 15 May 2019
CIS to-do list from one year ago, May 2018.docx
(
file
)
95 KB
1
17:21, 13 May 2019
UOD version 1 May 13, 2019.pdf
(
file
)
1,014 KB
1
14:54, 8 May 2019
M Herbert 200kV photogun.pptx
(
file
)
8.63 MB
1
16:41, 24 April 2019
UITF ASE Rev 0 version as of 4 24 2019.pdf
(
file
)
747 KB
1
16:33, 24 April 2019
UITF ASE Rev 0 ver2.pdf
(
file
)
492 KB
1
16:28, 24 April 2019
UITF PSS overview.pdf
(
file
)
1.47 MB
1
08:05, 24 April 2019
UITF Shielding Summary Vylet COO review.pptx
(
file
)
3.18 MB
1
14:19, 23 April 2019
UITF COO review extras.pptx
(
file
)
6.79 MB
1
10:10, 22 April 2019
UITF status poelker COO review v2.pptx
(
file
)
23.77 MB
1
08:56, 22 April 2019
P&C Meeting UITF 4 22 2019.pptx
(
file
)
786 KB
1
13:03, 19 April 2019
UITF Machine Protection poelker COO review v1.pptx
(
file
)
5.61 MB
1
13:03, 19 April 2019
UITF status poelker COO review v1.pptx
(
file
)
23.77 MB
1
12:05, 19 April 2019
Proposed HDIce run schedule 4 2019.pdf
(
file
)
304 KB
1
15:52, 18 April 2019
UITF Accelerator Operations Directive UOD Rev 0.pdf
(
file
)
1,021 KB
1
15:03, 18 April 2019
UITF ASE Rev 0.pdf
(
file
)
755 KB
1
15:03, 18 April 2019
FSAD8.pdf
(
file
)
2.92 MB
1
15:21, 16 April 2019
UITF PSS BCM review summary document.docx
(
file
)
699 KB
1
10:32, 25 March 2019
P&C Meeting 2 26 2019.pptx
(
file
)
1.71 MB
1
10:31, 25 March 2019
P&C Meeting 3 25 2019.pptx
(
file
)
1.71 MB
1
10:31, 25 March 2019
2019.pptx
(
file
)
1.71 MB
1
13:21, 18 March 2019
Updated MeV songsheets Shaun Gregory drawings of "as built" beamline.pdf
(
file
)
3.44 MB
1
12:36, 20 February 2019
Revised THA for 748.5 MHz Buncher Cavity Operation at the Upgraded Injector Test Facility.pdf
(
file
)
389 KB
1
12:36, 20 February 2019
Revised OSP 82655 748.5 MHz Buncher Cavity Operation at the Upgraded Injector Test Facility.pdf
(
file
)
2.39 MB
1
12:06, 13 February 2019
THA for the OSP 82424 QCM Operation at the Upgraded Injector Test Facility (UITF)revision2.pdf
(
file
)
521 KB
1
12:05, 13 February 2019
OSP 82424 QCM Operation at the Upgraded Injector Test Facility (UITF) revision 2.docx
(
file
)
23.07 MB
2
12:05, 13 February 2019
OSP 82424 QCM Operation at the Upgraded Injector Test Facility (UITF) revision 2.pdf
(
file
)
2.59 MB
2
16:36, 11 February 2019
OSP-UITF keV beam operations approved revision3 approved OSP format with signatures.pdf
(
file
)
4.08 MB
1
First page
Previous page
Next page
Last page
Navigation menu
Personal tools
Log in
Namespaces
Special page
Variants
Views
More
Search
Navigation
Main page
Recent changes
Random page
Help about MediaWiki
Tools
User contributions
Logs
View user groups
Special pages
Printable version