Uploads by Poelker

Jump to navigation Jump to search

This special page shows all uploaded files.

File list
First pagePrevious pageNext pageLast page
Date Name Thumbnail Size Description Versions
11:54, 5 November 2019 MeV beamline layout 11 5 2019.pdf (file) 587 KB   1
11:52, 5 November 2019 MeV beamline spreadsheet.xls (file) 42 KB   1
10:36, 1 November 2019 P&C meeting 10 28 2019.pptx (file) 2.4 MB   1
15:56, 31 October 2019 Mason Stoecker gas brem poster.pptx (file) 4.26 MB   1
16:17, 29 October 2019 ASE approval letter from Site Office.pdf (file) 232 KB   1
12:44, 21 October 2019 HDIce dump testing schedule.xls (file) 19 KB   1
12:43, 21 October 2019 HDIce dump testing schedule.jpg (file) 31 KB   1
08:48, 17 October 2019 JLAAC poelker UITF first draft.pptx (file) 15.47 MB   1
09:25, 14 October 2019 UITF trench shielding with photos.xls (file) 36.15 MB   1
16:32, 11 October 2019 UITF trench foam and shielding.xls (file) 36.15 MB   1
09:10, 8 October 2019 UITF ASE rev0.pdf (file) 882 KB   1
11:37, 6 September 2019 EWPAA 2019 poelker.pptx (file) 26.23 MB   1
12:45, 21 August 2019 Modeling thin GaAs photocathodes.pdf (file) 2.25 MB   1
14:23, 18 July 2019 Modifications to beamline.pdf (file) 19 KB   1
15:10, 2 July 2019 UITF ARR brief summary report.pdf (file) 312 KB   1
15:50, 25 June 2019 UITF sweep procedure S6024.pdf (file) 198 KB   1
12:41, 21 June 2019 UOD version June 21, 2019.pdf (file) 1.95 MB   1
10:08, 21 June 2019 UITF Cave2 ceiling roof tile removal THA.pdf (file) 588 KB   1
10:08, 21 June 2019 UITF Cave2 ceiling roof tile removal OSP.pdf (file) 1.98 MB   1
10:05, 21 June 2019 UITF Cave2 ceiling roof tile removal OSP.docx (file) 9.54 MB   2
12:46, 15 June 2019 Summary report UITF Conduct of Operations Review.docx (file) 20 KB   1
15:38, 16 May 2019 JLAB-TN-18-020 Radiation Safety Aspects of the Upgraded Injector Test Facility Vashek Vylet.docx (file) 3.75 MB   1
13:20, 15 May 2019 CIS to-do list today, May 2019.docx (file) 26 KB   1
13:19, 15 May 2019 CIS to-do list from one year ago, May 2018.docx (file) 95 KB   1
17:21, 13 May 2019 UOD version 1 May 13, 2019.pdf (file) 1,014 KB   1
14:54, 8 May 2019 M Herbert 200kV photogun.pptx (file) 8.63 MB   1
16:41, 24 April 2019 UITF ASE Rev 0 version as of 4 24 2019.pdf (file) 747 KB   1
16:33, 24 April 2019 UITF ASE Rev 0 ver2.pdf (file) 492 KB   1
16:28, 24 April 2019 UITF PSS overview.pdf (file) 1.47 MB   1
08:05, 24 April 2019 UITF Shielding Summary Vylet COO review.pptx (file) 3.18 MB   1
14:19, 23 April 2019 UITF COO review extras.pptx (file) 6.79 MB   1
10:10, 22 April 2019 UITF status poelker COO review v2.pptx (file) 23.77 MB   1
08:56, 22 April 2019 P&C Meeting UITF 4 22 2019.pptx (file) 786 KB   1
13:03, 19 April 2019 UITF Machine Protection poelker COO review v1.pptx (file) 5.61 MB   1
13:03, 19 April 2019 UITF status poelker COO review v1.pptx (file) 23.77 MB   1
12:05, 19 April 2019 Proposed HDIce run schedule 4 2019.pdf (file) 304 KB   1
15:52, 18 April 2019 UITF Accelerator Operations Directive UOD Rev 0.pdf (file) 1,021 KB   1
15:03, 18 April 2019 UITF ASE Rev 0.pdf (file) 755 KB   1
15:03, 18 April 2019 FSAD8.pdf (file) 2.92 MB   1
15:21, 16 April 2019 UITF PSS BCM review summary document.docx (file) 699 KB   1
10:32, 25 March 2019 P&C Meeting 2 26 2019.pptx (file) 1.71 MB   1
10:31, 25 March 2019 P&C Meeting 3 25 2019.pptx (file) 1.71 MB   1
10:31, 25 March 2019 2019.pptx (file) 1.71 MB   1
13:21, 18 March 2019 Updated MeV songsheets Shaun Gregory drawings of "as built" beamline.pdf (file) 3.44 MB   1
12:36, 20 February 2019 Revised THA for 748.5 MHz Buncher Cavity Operation at the Upgraded Injector Test Facility.pdf (file) 389 KB   1
12:36, 20 February 2019 Revised OSP 82655 748.5 MHz Buncher Cavity Operation at the Upgraded Injector Test Facility.pdf (file) 2.39 MB   1
12:06, 13 February 2019 THA for the OSP 82424 QCM Operation at the Upgraded Injector Test Facility (UITF)revision2.pdf (file) 521 KB   1
12:05, 13 February 2019 OSP 82424 QCM Operation at the Upgraded Injector Test Facility (UITF) revision 2.docx (file) 23.07 MB   2
12:05, 13 February 2019 OSP 82424 QCM Operation at the Upgraded Injector Test Facility (UITF) revision 2.pdf (file) 2.59 MB   2
16:36, 11 February 2019 OSP-UITF keV beam operations approved revision3 approved OSP format with signatures.pdf (file) 4.08 MB   1
First pagePrevious pageNext pageLast page