Uploads by Michaelm
Jump to navigation
Jump to search
This special page shows all uploaded files.
Date | Name | Thumbnail | Size | Description | Versions |
---|---|---|---|---|---|
13:36, 1 March 2021 | OpsList.doc (file) | 105 KB | List of Qualified UITF Operators | 1 | |
13:28, 16 March 2021 | ERRCloseOutReport-UITFHRSDIrradiation.pdf (file) | 898 KB | 1 | ||
13:29, 16 March 2021 | WastewaterIrradiation McCaughan long SAD change request.docx (file) | 33 KB | 1 | ||
07:20, 14 April 2021 | Wastewater-Schedule-Strawman.pdf (file) | 133 KB | Strawman schedule for Wastewater Irradiation Experiment installation | 1 | |
08:21, 14 April 2021 | Wastewater-Schedule-Strawman-v2.pdf (file) | 133 KB | Schedule strawman v2 | 1 | |
09:10, 19 April 2021 | UITFOperators.doc (file) | 105 KB | Qualified UITF Operators as of 3/26/21 | 1 | |
12:35, 20 April 2021 | Ww-longterm.4.20.21.pdf (file) | 137 KB | 4.20.21 version of long term schedule | 1 | |
15:23, 4 May 2021 | Ww-longterm.5.4.21.pdf (file) | 139 KB | Long Term schedule as of 5-4-21 | 1 | |
13:35, 11 May 2021 | Ww-longterm.5.12.21.pdf (file) | 140 KB | 5.12.21 update | 1 | |
13:44, 14 May 2021 | Place-holder.png (file) | 735 bytes | place holder | 1 | |
10:35, 18 May 2021 | Ww-longterm.5.19.21.pdf (file) | 142 KB | 5.19.21 long term schedule | 1 | |
10:36, 18 May 2021 | To-do-5.19.21.pdf (file) | 135 KB | To do list (5.19.21) | 1 | |
13:58, 17 June 2021 | WEPAB244-GPTv2.pdf (file) | 1.19 MB | 1 | ||
13:59, 17 June 2021 | WEPAB244-GPTv2.docx (file) | 8.4 MB | 1 | ||
14:12, 17 June 2021 | MOPB045 JLab-INJ-CM-Design-FabTest3.pdf (file) | 1.06 MB | 1 | ||
14:12, 17 June 2021 | MOPB045 JLab-INJ-CM-Design-FabTest3.docx (file) | 7.31 MB | 1 | ||
14:17, 17 June 2021 | IPAC21-FLUKA-simulation.pdf (file) | 910 KB | 1 | ||
14:17, 17 June 2021 | IPAC21-FLUKA-simulation.docx (file) | 8.92 MB | 1 | ||
14:24, 17 June 2021 | IPAC21-GPT-simulations.pptx (file) | 8.51 MB | 1 | ||
19:29, 22 June 2021 | Matt.jpg (file) | 33 KB | 1 | ||
19:37, 22 June 2021 | WW-Install 6.22.21.pdf (file) | 147 KB | Long Term Schedule - 6/22/21 update | 1 | |
19:37, 22 June 2021 | WW-ToDo 6.22.21.pdf (file) | 136 KB | Outstanding Tasks - 6/22/21 | 1 | |
20:34, 22 June 2021 | Wastewater-MM.pptx (file) | 19.57 MB | Wastewater Presentation | 1 | |
20:37, 22 June 2021 | Wastewater-MM.pdf (file) | 1.66 MB | Presentation (PDF) | 1 | |
12:15, 23 June 2021 | WW-resource-6.23.21.docx (file) | 15 KB | Resource estimate to complete install of Wastewater experiment as compiled 6.23.21 | 1 | |
12:21, 23 June 2021 | WWcommissioning.xlsx (file) | 16 KB | Commissioning Strawman | 1 | |
13:43, 23 June 2021 | Test of the New Injector Booster at UITFV4.pptx (file) | 1.93 MB | 1 | ||
14:03, 23 June 2021 | Test of the New Injector Booster at UITFV5.pptx (file) | 1.93 MB | 1 | ||
10:29, 19 July 2021 | Engineering-support-jobs.docx (file) | 11 KB | 1 | ||
07:33, 21 July 2021 | FC3-SHIELDING 20JUL21v1.pdf (file) | 956 KB | FC3 shielding design | 1 | |
07:33, 21 July 2021 | FC4-SHIELDING 20JUL21v1.pdf (file) | 1.32 MB | FC4 shielding design | 1 | |
07:37, 21 July 2021 | JL0029599-2000UITF MeV BEAMLINE07-JUN-21.pdf (file) | 1.21 MB | MeV song sheet | 1 | |
07:41, 21 July 2021 | COO-UITF-irradiation-exp 070921.docx (file) | 480 KB | COO | 1 | |
07:41, 21 July 2021 | ESAD UITF-irradiation beamline 071421.docx (file) | 2.69 MB | ESAD | 1 | |
12:07, 27 July 2021 | UITFOperators 7.27.21.doc (file) | 105 KB | 7.27.21 Operator list | 1 | |
14:47, 27 July 2021 | UE-21-001 COO.pdf (file) | 693 KB | COO | 1 | |
14:48, 27 July 2021 | UE-21-001 ESAD.pdf (file) | 1.14 MB | ESAD | 1 | |
14:57, 27 July 2021 | UITF memo.pdf (file) | 585 KB | RSAD Memo for Wastewater Experiment | 1 | |
15:00, 27 July 2021 | RSAD-Nominal Operation of UITF.pdf (file) | 7.99 MB | RSAD for UITF | 1 | |
11:01, 4 August 2021 | WWcommissioning 2.xlsx (file) | 16 KB | Commissioning plan | 1 | |
11:17, 4 August 2021 | WWinstall-Todo 8.4.21.pdf (file) | 135 KB | Outstanding install tasks (8/4/21) | 1 | |
11:17, 4 August 2021 | WWinstall-8.4.21.pdf (file) | 148 KB | Full installation schedule | 1 | |
11:40, 4 August 2021 | UITF-to-do-list 8 4 21.docx (file) | 35 KB | Comments from Matt on start-up | 1 | |
11:41, 4 August 2021 | UITF-to-do-list8 4 21.docx (file) | 35 KB | Comments from Matt | 1 | |
07:58, 9 August 2021 | WWcommissioning 8.9.21.xlsx (file) | 10 KB | Wastewater Commissioning Plan (High Level) | 1 | |
07:33, 11 August 2021 | UE-21-001 ERR response.docx (file) | 45 KB | 1 | ||
11:33, 16 August 2021 | Dose mapping & irradiation procedure 081121.docx (file) | 18 KB | Dose mapping and Irradiation procedure | 1 | |
19:18, 27 August 2021 | UITF quick reference rev.13a.pdf (file) | 580 KB | Wastewater Quick Reference Drawing | 1 | |
17:28, 9 September 2021 | WWcommissioning v3.xlsx (file) | 14 KB | Experiment Schedule (V3) | 1 | |
17:31, 9 September 2021 | Dose-mapping-and-irradiation-procedure 081121.docx (file) | 27 KB | Dose Mapping and Irradiation Procedure | 1 |