File list
Jump to navigation
Jump to search
This special page shows all uploaded files.
Date | Name | Thumbnail | Size | User | Description | Versions |
---|---|---|---|---|---|---|
18:17, 17 September 2021 | Dose mapping and irradiation procedure 091721.docx (file) | 25 KB | Michaelm | 1 | ||
11:14, 17 September 2021 | UHV1400MountV2.pptx (file) | 740 KB | Marcy | 1 | ||
09:55, 15 September 2021 | GTS gun with CEBAF anode.pptx (file) | 2.06 MB | Gabrielp | 4 | ||
15:27, 14 September 2021 | Dose-mapping-and-irradiation-procedure 091421.docx (file) | 25 KB | Michaelm | Dose-mapping-and-irradiation-procedure V2 | 1 | |
15:14, 14 September 2021 | UHV1400Mount.pptx (file) | 734 KB | Marcy | 1 | ||
07:58, 14 September 2021 | GTS-SF6 Automatic Gas Transfer System by Kevin Jordan 2007 uopdated by Carlos 2021.pptx (file) | 350 KB | Chgarcia | 1 | ||
07:57, 14 September 2021 | LERF-FEL SF6 transfer system overview documented September 2021.pptx (file) | 6.25 MB | Chgarcia | 1 | ||
19:54, 9 September 2021 | 20210811 HK Test Supershort.pdf (file) | 58 KB | Michaelm | HKDL | 1 | |
19:10, 9 September 2021 | A High-Power Multi-Harmonic Driver.ppt (file) | 11.69 MB | Michaelm | Multi-Harmonic cavity driver presentation (Roberts) | 1 | |
19:07, 9 September 2021 | HK-RCS.pdf (file) | 4.35 MB | Michaelm | RCS Harmonic Kicker presentation | 1 | |
19:03, 9 September 2021 | PhysRevAccelBeams.24.061002 fast kicker.pdf (file) | 5.29 MB | Michaelm | Phys Rev AB Paper | 1 | |
18:31, 9 September 2021 | Dose-mapping-and-irradiation-procedure 081121.docx (file) | 27 KB | Michaelm | Dose Mapping and Irradiation Procedure | 1 | |
18:28, 9 September 2021 | WWcommissioning v3.xlsx (file) | 14 KB | Michaelm | Experiment Schedule (V3) | 1 | |
08:47, 9 September 2021 | SF6 GTS Automatic Gas Transfer System by Kevin Jordan 2007.pptx (file) | 674 KB | Grames | 1 | ||
10:53, 8 September 2021 | PWG 982021.pptx (file) | 5.68 MB | Mstefani | 1 | ||
09:14, 8 September 2021 | Electrode assembly on white R30 back end view zoom.jpg (file) | 231 KB | Chgarcia | 1 | ||
09:08, 8 September 2021 | CEBAF-UITF electrodes history updated Sept 2021.pptx (file) | 8.58 MB | Chgarcia | 1 | ||
09:45, 7 September 2021 | Low carbon steel vacuum study project.pptx (file) | 18.01 MB | Poelker | 1 | ||
15:21, 1 September 2021 | 2021-Summer-XHV.pdf (file) | 3.82 MB | Marcy | 1 | ||
10:57, 1 September 2021 | ILC-positron-source.pdf (file) | 8.11 MB | Mstefani | 1 | ||
20:20, 30 August 2021 | WEPAB104.pdf (file) | 854 KB | Yoskowij | 1 | ||
20:19, 30 August 2021 | WEPAB105.pdf (file) | 508 KB | Yoskowij | 1 | ||
14:04, 30 August 2021 | Diamond Mott Analysis Summaryv3.pptx (file) | 5.49 MB | Marcy | 1 | ||
14:04, 30 August 2021 | AllFiles0-2.5sigma.xlsx (file) | 334 KB | Marcy | 1 | ||
20:18, 27 August 2021 | UITF quick reference rev.13a.pdf (file) | 580 KB | Michaelm | Wastewater Quick Reference Drawing | 1 | |
16:12, 27 August 2021 | Chopper to booster 27July21.pdf (file) | 2.73 MB | Poelker | 1 | ||
16:09, 27 August 2021 | Chopper to booster region buncher closer to booster 8 27 21 prelim design.pdf (file) | 2.5 MB | Poelker | 1 | ||
15:05, 27 August 2021 | Hernandez-Garcia IEEE ceidp 2021 REVISED final.pdf (file) | 298 KB | Chgarcia | 1 | ||
08:20, 27 August 2021 | Diamond Mott Analysis Summaryv3.pdf (file) | 2.69 MB | Grames | 1 | ||
08:25, 25 August 2021 | PWG 8252021.pptx (file) | 5.3 MB | Mstefani | 1 | ||
07:55, 25 August 2021 | UITF quick reference rev.13.pdf (file) | 547 KB | Poelker | 1 | ||
16:52, 23 August 2021 | CEBAF Accelerator Achievements.pdf (file) | 1.18 MB | Poelker | 1 | ||
18:49, 18 August 2021 | JLAB-TN-21-025.pdf (file) | 967 KB | Lalitha | THE TEST RESULTS OF THE MQW QUADRUPOLE MAGNET Link:https://jlabdoc.jlab.org/docushare/dsweb/View/Collection-50593 | 1 | |
18:47, 18 August 2021 | JLAB-TN-21-024.pdf (file) | 5.16 MB | Lalitha | ELECTROMAGNETIC DESIGN OF MQW MAGNET FOR THE CEBAF 200 keV INJECTOR BEAMLINE (https://jlabdoc.jlab.org/docushare/dsweb/View/Collection-50593) | 1 | |
17:50, 17 August 2021 | GPT-S 8192021.pptx (file) | 5.34 MB | Mstefani | 1 | ||
12:33, 16 August 2021 | Dose mapping & irradiation procedure 081121.docx (file) | 18 KB | Michaelm | Dose mapping and Irradiation procedure | 1 | |
08:33, 11 August 2021 | UE-21-001 ERR response.docx (file) | 45 KB | Michaelm | 1 | ||
17:16, 10 August 2021 | GPT-S 8112021.pptx (file) | 5.89 MB | Mstefani | 1 | ||
08:58, 9 August 2021 | WWcommissioning 8.9.21.xlsx (file) | 10 KB | Michaelm | Wastewater Commissioning Plan (High Level) | 1 | |
14:26, 4 August 2021 | Proposal Lab 20-2310 narrative submitted Hernandez-Garcia & Poelker.pdf (file) | 9.02 MB | Chgarcia | 1 | ||
12:41, 4 August 2021 | UITF-to-do-list8 4 21.docx (file) | 35 KB | Michaelm | Comments from Matt | 1 | |
12:40, 4 August 2021 | UITF-to-do-list 8 4 21.docx (file) | 35 KB | Michaelm | Comments from Matt on start-up | 1 | |
12:17, 4 August 2021 | WWinstall-8.4.21.pdf (file) | 148 KB | Michaelm | Full installation schedule | 1 | |
12:17, 4 August 2021 | WWinstall-Todo 8.4.21.pdf (file) | 135 KB | Michaelm | Outstanding install tasks (8/4/21) | 1 | |
12:01, 4 August 2021 | WWcommissioning 2.xlsx (file) | 16 KB | Michaelm | Commissioning plan | 1 | |
11:06, 30 July 2021 | Cebaf wien hv 20210715.pdf (file) | 3.2 MB | Chgarcia | 1 | ||
14:21, 28 July 2021 | Polarized.png (file) | 51 KB | Mstefani | 1 | ||
14:21, 28 July 2021 | Unpolarized.png (file) | 45 KB | Mstefani | 1 | ||
16:00, 27 July 2021 | RSAD-Nominal Operation of UITF.pdf (file) | 7.99 MB | Michaelm | RSAD for UITF | 1 | |
15:57, 27 July 2021 | UITF memo.pdf (file) | 585 KB | Michaelm | RSAD Memo for Wastewater Experiment | 1 |