Difference between revisions of "Bubble Chamber Reviews"

From Ciswikidb
Jump to navigation Jump to search
 
(51 intermediate revisions by the same user not shown)
Line 1: Line 1:
 +
= '''Bubble Chamber Run - May 2018''' =
 +
* New procedure for operations, '''''Argonne Bubble Chamber Operations for Engineering Runs''''': [[media:TGT-PROC-18-001.pdf]]
 +
* TGT-SOW-18-002, '''''Statement of work for Test of the Bubble Chamber Spring 2018''''': [[media:TGT-SOW-18-002.docx]]
 +
* TGT-RPT-18-001, '''''September 2015 Test of Argonne Bubble Chamber''''': [[media:TGT-RPT-18-002.docx]]
 +
* '''''Argonne Bubble Chamber ERR and Run Schedule''''': [[media:Bubble_Chamber_Memo_future_May2018.docx]]
 +
* '''''Argonne Bubble Chamber Experiment Test Run ''''': [[media:Bubble_Test_Memo_May2018.pdf]]
 +
* '''''Approved TOSP (with signatures and all other documents):''''' [[media:operational_safety_procedure_form_75428.pdf]]
 +
* '''''Introduction to Bubble Chamber: Ops Training''''' (May 9, 2018): [[media:Bubble_Chamber_OpsTrain_May2018.pdf]] [[media:Bubble_Chamber_OpsTrain_May2018.pptx]]
 +
 +
 +
 
= '''Bubble Chamber Reviews at JLab''' =
 
= '''Bubble Chamber Reviews at JLab''' =
 
* ''Bubble Chamber TOSP Review'' (August 18, 2015):
 
* ''Bubble Chamber TOSP Review'' (August 18, 2015):
# Experimental Overview [[media:Bubble_Chamber_TOSP_Overview_Aug2015.pdf]] [[media:Bubble_Chamber_TOSP_Overview_Aug2015.pptx]]
+
# ''Charge to the Committee: Bubble Chamber Safety Review'' (P. Rossi): [[media:Bubble-Chamber_Review_Charge.pdf]] [[media:Bubble-Chamber_Review_Charge.ppt]]
#  
+
# Presentations:
 
+
## ''Experimental Overview'' (R. Suleiman): [[media:Bubble_Chamber_TOSP_Overview_Aug2015.pdf]] [[media:Bubble_Chamber_TOSP_Overview_Aug2015.pptx]]
 +
## ''Bubble Chamber Superheated Detector System'' (D. Meekins): [[media:Bubble_Chamber_Safety_Meekins.pdf]] [[media:Bubble_Chamber_Safety_Meekins.pptx]]
 +
# Temporary Operational Safety Procedure (TOSP):
 +
## TOSP Form: [[media:TOSP_Test_of_ANL_Bubble_Chamber_Detector.pdf]] [[media:TOSP_Test_of_ANL_Bubble_Chamber_Detector.docx]]
 +
## TOPS Procedural Document: [[media:TOSP_Procedural_Document_Bubble_Chamber.pdf]] [[media:TOSP_Procedural_Document_Bubble_Chamber.docx]]
 +
# Report from the Review Committee: [[media:Bubble_Chamber_Experiment_Readiness_Review.pdf]]
 +
# '''Final Operational Safety Documents Submitted for Signatures (#52757):'''
 +
## [[media:Procedure-TOSP-Aug.pdf]]
 +
## [[media:THA-ANL_bubble_chamber.pdf]]
 +
## [[media:TGT-PROC-15-001.pdf]]
 +
## [[media:TGT-CALC-502-002.pdf]]
 +
## [[media:TGT502-1000-0000-PID.pdf]]
 +
## [[media:Rev-resp.pdf]]
 +
# '''''Approved TOSP (with signatures and all other documents):''''' [[media:operational_safety_procedure_form_52757.pdf]]
 +
# ''Introduction to Bubble Chamber: Ops Training'' (September 9, 2015): [[media:Bubble_Chamber_OpsTrain_Sept2015.pdf]] [[media:Bubble_Chamber_OpsTrain_Sept2015.pptx]] Video: [https://drive.google.com/file/d/0B9ShTslvnOaCemd4dlpDbzVOVUE/view?usp=sharing]
 +
# Industrial Hygiene report for sampling conducted on September 9, 2015 while the bubble chamber was filled with nitrous oxide in the Injector Tunnel: [[media:Bubble_Bhamber_AirSAmplingResults.pdf]]
 +
# Industrial Hygiene report for sampling conducted on September 16, 2015 while nitrous oxide was vented from bubble chamber in the Injector Tunnel: [[media:Bubble_chamber_AirSAmplingResults_venting.pdf]]
  
  
Line 14: Line 41:
 
* ''ANL Bubble Chamber Superheated Active Target System''
 
* ''ANL Bubble Chamber Superheated Active Target System''
 
B. DiGiovine, Argonne National Lab (2015) [[media:Bubble_Chamber_ANL_Safety_Review-R2.pdf]] [[media:Bubble_Chamber_ANL_Safety_Review-R2.ppt]]
 
B. DiGiovine, Argonne National Lab (2015) [[media:Bubble_Chamber_ANL_Safety_Review-R2.pdf]] [[media:Bubble_Chamber_ANL_Safety_Review-R2.ppt]]
 +
  
 
* ''Bubble Chamber: Safety and Systems Overview''
 
* ''Bubble Chamber: Safety and Systems Overview''
 
B. DiGiovine, Argonne National Lab (2012) [[media:H2O_Bubble_Chamber-Safety_Review.pdf]]
 
B. DiGiovine, Argonne National Lab (2012) [[media:H2O_Bubble_Chamber-Safety_Review.pdf]]
 +
 +
  
 
* ''Argonne Safety Review'' (2010) [[media:ArgonneSafetyReview.pdf]]
 
* ''Argonne Safety Review'' (2010) [[media:ArgonneSafetyReview.pdf]]
 +
 +
 +
 +
 +
= '''Bubble Chamber Dimensions''' =
 +
 +
* [[media:Bubble_Chamber_Reference_Dimensions.pdf]]
 +
 +
 +
 +
 +
= '''Installation Schedule''' =
 +
* April 14, 2014 - [[media:141409_BubbleDemoInstall.pdf]] [[media:141409_BubbleDemoInstall.xlsx]]
 +
* April 9, 2014 - [[media:140409_BubbleDemoInstall.pdf]] [[media:140409_BubbleDemoInstall.xlsx]]
 +
 +
 +
 +
 +
= '''Injector Drawings''' =
 +
 +
* Injector tunnel and service building drawings for [[cable length estimates]]
 +
 +
 +
 +
 +
= '''Survey Transmittals''' =
 +
 +
* L1669 (7/21/2015, 8/12/2015): 5D beamline and Bubble Chamber [[Media:DT_L1669.pdf]] [[Media:DT_L1669.docx]]
 +
* L1678 (9/10/2014): Survey of MQD5D00 and MQD5D01: [[Media:DT_L1678.pdf]]

Latest revision as of 12:06, 8 May 2018

Bubble Chamber Run - May 2018


Bubble Chamber Reviews at JLab

  • Bubble Chamber TOSP Review (August 18, 2015):
  1. Charge to the Committee: Bubble Chamber Safety Review (P. Rossi): media:Bubble-Chamber_Review_Charge.pdf media:Bubble-Chamber_Review_Charge.ppt
  2. Presentations:
    1. Experimental Overview (R. Suleiman): media:Bubble_Chamber_TOSP_Overview_Aug2015.pdf media:Bubble_Chamber_TOSP_Overview_Aug2015.pptx
    2. Bubble Chamber Superheated Detector System (D. Meekins): media:Bubble_Chamber_Safety_Meekins.pdf media:Bubble_Chamber_Safety_Meekins.pptx
  3. Temporary Operational Safety Procedure (TOSP):
    1. TOSP Form: media:TOSP_Test_of_ANL_Bubble_Chamber_Detector.pdf media:TOSP_Test_of_ANL_Bubble_Chamber_Detector.docx
    2. TOPS Procedural Document: media:TOSP_Procedural_Document_Bubble_Chamber.pdf media:TOSP_Procedural_Document_Bubble_Chamber.docx
  4. Report from the Review Committee: media:Bubble_Chamber_Experiment_Readiness_Review.pdf
  5. Final Operational Safety Documents Submitted for Signatures (#52757):
    1. media:Procedure-TOSP-Aug.pdf
    2. media:THA-ANL_bubble_chamber.pdf
    3. media:TGT-PROC-15-001.pdf
    4. media:TGT-CALC-502-002.pdf
    5. media:TGT502-1000-0000-PID.pdf
    6. media:Rev-resp.pdf
  6. Approved TOSP (with signatures and all other documents): media:operational_safety_procedure_form_52757.pdf
  7. Introduction to Bubble Chamber: Ops Training (September 9, 2015): media:Bubble_Chamber_OpsTrain_Sept2015.pdf media:Bubble_Chamber_OpsTrain_Sept2015.pptx Video: [1]
  8. Industrial Hygiene report for sampling conducted on September 9, 2015 while the bubble chamber was filled with nitrous oxide in the Injector Tunnel: media:Bubble_Bhamber_AirSAmplingResults.pdf
  9. Industrial Hygiene report for sampling conducted on September 16, 2015 while nitrous oxide was vented from bubble chamber in the Injector Tunnel: media:Bubble_chamber_AirSAmplingResults_venting.pdf




Bubble Chamber Reviews at ANL

  • ANL Bubble Chamber Superheated Active Target System

B. DiGiovine, Argonne National Lab (2015) media:Bubble_Chamber_ANL_Safety_Review-R2.pdf media:Bubble_Chamber_ANL_Safety_Review-R2.ppt


  • Bubble Chamber: Safety and Systems Overview

B. DiGiovine, Argonne National Lab (2012) media:H2O_Bubble_Chamber-Safety_Review.pdf




Bubble Chamber Dimensions



Installation Schedule



Injector Drawings



Survey Transmittals