Difference between revisions of "Bubble Chamber Reviews"
Jump to navigation
Jump to search
(42 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
+ | = '''Bubble Chamber Run - May 2018''' = | ||
+ | * New procedure for operations, '''''Argonne Bubble Chamber Operations for Engineering Runs''''': [[media:TGT-PROC-18-001.pdf]] | ||
+ | * TGT-SOW-18-002, '''''Statement of work for Test of the Bubble Chamber Spring 2018''''': [[media:TGT-SOW-18-002.docx]] | ||
+ | * TGT-RPT-18-001, '''''September 2015 Test of Argonne Bubble Chamber''''': [[media:TGT-RPT-18-002.docx]] | ||
+ | * '''''Argonne Bubble Chamber ERR and Run Schedule''''': [[media:Bubble_Chamber_Memo_future_May2018.docx]] | ||
+ | * '''''Argonne Bubble Chamber Experiment Test Run ''''': [[media:Bubble_Test_Memo_May2018.pdf]] | ||
+ | * '''''Approved TOSP (with signatures and all other documents):''''' [[media:operational_safety_procedure_form_75428.pdf]] | ||
+ | * '''''Introduction to Bubble Chamber: Ops Training''''' (May 9, 2018): [[media:Bubble_Chamber_OpsTrain_May2018.pdf]] [[media:Bubble_Chamber_OpsTrain_May2018.pptx]] | ||
+ | |||
+ | |||
+ | |||
= '''Bubble Chamber Reviews at JLab''' = | = '''Bubble Chamber Reviews at JLab''' = | ||
* ''Bubble Chamber TOSP Review'' (August 18, 2015): | * ''Bubble Chamber TOSP Review'' (August 18, 2015): | ||
+ | # ''Charge to the Committee: Bubble Chamber Safety Review'' (P. Rossi): [[media:Bubble-Chamber_Review_Charge.pdf]] [[media:Bubble-Chamber_Review_Charge.ppt]] | ||
# Presentations: | # Presentations: | ||
− | ##''Experimental Overview'' (R. | + | ## ''Experimental Overview'' (R. Suleiman): [[media:Bubble_Chamber_TOSP_Overview_Aug2015.pdf]] [[media:Bubble_Chamber_TOSP_Overview_Aug2015.pptx]] |
− | ## ''Bubble Chamber Superheated Detector System'' (D. Meekins) [[media: | + | ## ''Bubble Chamber Superheated Detector System'' (D. Meekins): [[media:Bubble_Chamber_Safety_Meekins.pdf]] [[media:Bubble_Chamber_Safety_Meekins.pptx]] |
# Temporary Operational Safety Procedure (TOSP): | # Temporary Operational Safety Procedure (TOSP): | ||
## TOSP Form: [[media:TOSP_Test_of_ANL_Bubble_Chamber_Detector.pdf]] [[media:TOSP_Test_of_ANL_Bubble_Chamber_Detector.docx]] | ## TOSP Form: [[media:TOSP_Test_of_ANL_Bubble_Chamber_Detector.pdf]] [[media:TOSP_Test_of_ANL_Bubble_Chamber_Detector.docx]] | ||
## TOPS Procedural Document: [[media:TOSP_Procedural_Document_Bubble_Chamber.pdf]] [[media:TOSP_Procedural_Document_Bubble_Chamber.docx]] | ## TOPS Procedural Document: [[media:TOSP_Procedural_Document_Bubble_Chamber.pdf]] [[media:TOSP_Procedural_Document_Bubble_Chamber.docx]] | ||
+ | # Report from the Review Committee: [[media:Bubble_Chamber_Experiment_Readiness_Review.pdf]] | ||
+ | # '''Final Operational Safety Documents Submitted for Signatures (#52757):''' | ||
+ | ## [[media:Procedure-TOSP-Aug.pdf]] | ||
+ | ## [[media:THA-ANL_bubble_chamber.pdf]] | ||
+ | ## [[media:TGT-PROC-15-001.pdf]] | ||
+ | ## [[media:TGT-CALC-502-002.pdf]] | ||
+ | ## [[media:TGT502-1000-0000-PID.pdf]] | ||
+ | ## [[media:Rev-resp.pdf]] | ||
+ | # '''''Approved TOSP (with signatures and all other documents):''''' [[media:operational_safety_procedure_form_52757.pdf]] | ||
+ | # ''Introduction to Bubble Chamber: Ops Training'' (September 9, 2015): [[media:Bubble_Chamber_OpsTrain_Sept2015.pdf]] [[media:Bubble_Chamber_OpsTrain_Sept2015.pptx]] Video: [https://drive.google.com/file/d/0B9ShTslvnOaCemd4dlpDbzVOVUE/view?usp=sharing] | ||
+ | # Industrial Hygiene report for sampling conducted on September 9, 2015 while the bubble chamber was filled with nitrous oxide in the Injector Tunnel: [[media:Bubble_Bhamber_AirSAmplingResults.pdf]] | ||
+ | # Industrial Hygiene report for sampling conducted on September 16, 2015 while nitrous oxide was vented from bubble chamber in the Injector Tunnel: [[media:Bubble_chamber_AirSAmplingResults_venting.pdf]] | ||
Line 32: | Line 56: | ||
* [[media:Bubble_Chamber_Reference_Dimensions.pdf]] | * [[media:Bubble_Chamber_Reference_Dimensions.pdf]] | ||
+ | |||
+ | |||
+ | |||
+ | |||
+ | = '''Installation Schedule''' = | ||
+ | * April 14, 2014 - [[media:141409_BubbleDemoInstall.pdf]] [[media:141409_BubbleDemoInstall.xlsx]] | ||
+ | * April 9, 2014 - [[media:140409_BubbleDemoInstall.pdf]] [[media:140409_BubbleDemoInstall.xlsx]] | ||
+ | |||
+ | |||
+ | |||
+ | |||
+ | = '''Injector Drawings''' = | ||
+ | |||
+ | * Injector tunnel and service building drawings for [[cable length estimates]] | ||
+ | |||
+ | |||
+ | |||
+ | |||
+ | = '''Survey Transmittals''' = | ||
+ | |||
+ | * L1669 (7/21/2015, 8/12/2015): 5D beamline and Bubble Chamber [[Media:DT_L1669.pdf]] [[Media:DT_L1669.docx]] | ||
+ | * L1678 (9/10/2014): Survey of MQD5D00 and MQD5D01: [[Media:DT_L1678.pdf]] |
Latest revision as of 13:06, 8 May 2018
Bubble Chamber Run - May 2018
- New procedure for operations, Argonne Bubble Chamber Operations for Engineering Runs: media:TGT-PROC-18-001.pdf
- TGT-SOW-18-002, Statement of work for Test of the Bubble Chamber Spring 2018: media:TGT-SOW-18-002.docx
- TGT-RPT-18-001, September 2015 Test of Argonne Bubble Chamber: media:TGT-RPT-18-002.docx
- Argonne Bubble Chamber ERR and Run Schedule: media:Bubble_Chamber_Memo_future_May2018.docx
- Argonne Bubble Chamber Experiment Test Run : media:Bubble_Test_Memo_May2018.pdf
- Approved TOSP (with signatures and all other documents): media:operational_safety_procedure_form_75428.pdf
- Introduction to Bubble Chamber: Ops Training (May 9, 2018): media:Bubble_Chamber_OpsTrain_May2018.pdf media:Bubble_Chamber_OpsTrain_May2018.pptx
Bubble Chamber Reviews at JLab
- Bubble Chamber TOSP Review (August 18, 2015):
- Charge to the Committee: Bubble Chamber Safety Review (P. Rossi): media:Bubble-Chamber_Review_Charge.pdf media:Bubble-Chamber_Review_Charge.ppt
- Presentations:
- Experimental Overview (R. Suleiman): media:Bubble_Chamber_TOSP_Overview_Aug2015.pdf media:Bubble_Chamber_TOSP_Overview_Aug2015.pptx
- Bubble Chamber Superheated Detector System (D. Meekins): media:Bubble_Chamber_Safety_Meekins.pdf media:Bubble_Chamber_Safety_Meekins.pptx
- Temporary Operational Safety Procedure (TOSP):
- Report from the Review Committee: media:Bubble_Chamber_Experiment_Readiness_Review.pdf
- Final Operational Safety Documents Submitted for Signatures (#52757):
- Approved TOSP (with signatures and all other documents): media:operational_safety_procedure_form_52757.pdf
- Introduction to Bubble Chamber: Ops Training (September 9, 2015): media:Bubble_Chamber_OpsTrain_Sept2015.pdf media:Bubble_Chamber_OpsTrain_Sept2015.pptx Video: [1]
- Industrial Hygiene report for sampling conducted on September 9, 2015 while the bubble chamber was filled with nitrous oxide in the Injector Tunnel: media:Bubble_Bhamber_AirSAmplingResults.pdf
- Industrial Hygiene report for sampling conducted on September 16, 2015 while nitrous oxide was vented from bubble chamber in the Injector Tunnel: media:Bubble_chamber_AirSAmplingResults_venting.pdf
- Initial review meeting (September 11, 2014): media:Bubble_Chamber_Readiness_11Sept2014.pdf media:Bubble_Chamber_Readiness_11Sept2014.pptx
Bubble Chamber Reviews at ANL
- ANL Bubble Chamber Superheated Active Target System
B. DiGiovine, Argonne National Lab (2015) media:Bubble_Chamber_ANL_Safety_Review-R2.pdf media:Bubble_Chamber_ANL_Safety_Review-R2.ppt
- Bubble Chamber: Safety and Systems Overview
B. DiGiovine, Argonne National Lab (2012) media:H2O_Bubble_Chamber-Safety_Review.pdf
- Argonne Safety Review (2010) media:ArgonneSafetyReview.pdf
Bubble Chamber Dimensions
Installation Schedule
- April 14, 2014 - media:141409_BubbleDemoInstall.pdf media:141409_BubbleDemoInstall.xlsx
- April 9, 2014 - media:140409_BubbleDemoInstall.pdf media:140409_BubbleDemoInstall.xlsx
Injector Drawings
- Injector tunnel and service building drawings for cable length estimates
Survey Transmittals
- L1669 (7/21/2015, 8/12/2015): 5D beamline and Bubble Chamber Media:DT_L1669.pdf Media:DT_L1669.docx
- L1678 (9/10/2014): Survey of MQD5D00 and MQD5D01: Media:DT_L1678.pdf