Bubble Chamber Reviews
Jump to navigation
Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.
Bubble Chamber Run - May 2018
- New procedure for operations, Argonne Bubble Chamber Operations for Engineering Runs: media:TGT-PROC-18-001.pdf
- TGT-SOW-18-002, Statement of work for Test of the Bubble Chamber Spring 2018: media:TGT-SOW-18-002.docx
- TGT-RPT-18-001, September 2015 Test of Argonne Bubble Chamber: media:TGT-RPT-18-002.docx
- Argonne Bubble Chamber ERR and Run Schedule: media:Bubble_Chamber_Memo_future_May2018.docx
- Argonne Bubble Chamber Experiment Test Run : media:Bubble_Test_Memo_May2018.pdf
- Approved TOSP (with signatures and all other documents): media:operational_safety_procedure_form_75428.pdf
- Introduction to Bubble Chamber: Ops Training (May 9, 2018): media:Bubble_Chamber_OpsTrain_May2018.pdf media:Bubble_Chamber_OpsTrain_May2018.pptx
Bubble Chamber Reviews at JLab
- Bubble Chamber TOSP Review (August 18, 2015):
- Charge to the Committee: Bubble Chamber Safety Review (P. Rossi): media:Bubble-Chamber_Review_Charge.pdf media:Bubble-Chamber_Review_Charge.ppt
- Presentations:
- Experimental Overview (R. Suleiman): media:Bubble_Chamber_TOSP_Overview_Aug2015.pdf media:Bubble_Chamber_TOSP_Overview_Aug2015.pptx
- Bubble Chamber Superheated Detector System (D. Meekins): media:Bubble_Chamber_Safety_Meekins.pdf media:Bubble_Chamber_Safety_Meekins.pptx
- Temporary Operational Safety Procedure (TOSP):
- Report from the Review Committee: media:Bubble_Chamber_Experiment_Readiness_Review.pdf
- Final Operational Safety Documents Submitted for Signatures (#52757):
- Approved TOSP (with signatures and all other documents): media:operational_safety_procedure_form_52757.pdf
- Introduction to Bubble Chamber: Ops Training (September 9, 2015): media:Bubble_Chamber_OpsTrain_Sept2015.pdf media:Bubble_Chamber_OpsTrain_Sept2015.pptx Video: [1]
- Industrial Hygiene report for sampling conducted on September 9, 2015 while the bubble chamber was filled with nitrous oxide in the Injector Tunnel: media:Bubble_Bhamber_AirSAmplingResults.pdf
- Industrial Hygiene report for sampling conducted on September 16, 2015 while nitrous oxide was vented from bubble chamber in the Injector Tunnel: media:Bubble_chamber_AirSAmplingResults_venting.pdf
- Initial review meeting (September 11, 2014): media:Bubble_Chamber_Readiness_11Sept2014.pdf media:Bubble_Chamber_Readiness_11Sept2014.pptx
Bubble Chamber Reviews at ANL
- ANL Bubble Chamber Superheated Active Target System
B. DiGiovine, Argonne National Lab (2015) media:Bubble_Chamber_ANL_Safety_Review-R2.pdf media:Bubble_Chamber_ANL_Safety_Review-R2.ppt
- Bubble Chamber: Safety and Systems Overview
B. DiGiovine, Argonne National Lab (2012) media:H2O_Bubble_Chamber-Safety_Review.pdf
- Argonne Safety Review (2010) media:ArgonneSafetyReview.pdf
Bubble Chamber Dimensions
Installation Schedule
- April 14, 2014 - media:141409_BubbleDemoInstall.pdf media:141409_BubbleDemoInstall.xlsx
- April 9, 2014 - media:140409_BubbleDemoInstall.pdf media:140409_BubbleDemoInstall.xlsx
Injector Drawings
- Injector tunnel and service building drawings for cable length estimates
Survey Transmittals
- L1669 (7/21/2015, 8/12/2015): 5D beamline and Bubble Chamber Media:DT_L1669.pdf Media:DT_L1669.docx
- L1678 (9/10/2014): Survey of MQD5D00 and MQD5D01: Media:DT_L1678.pdf