Uploads by Gabrielp
Jump to navigation
Jump to search
This special page shows all uploaded files.
Date | Name | Thumbnail | Size | Description | Versions |
---|---|---|---|---|---|
09:01, 20 October 2021 | 18 in CEBAF gun Gabs screen.pptx (file) | 2.4 MB | 1 | ||
17:52, 2 November 2021 | 18 in CEBAF gun Gabs screen FRONT VIEWS.pptx (file) | 1.68 MB | 1 | ||
07:15, 19 July 2023 | 18 in CEBAF gun Hinged anode.pptx (file) | 1.75 MB | 1 | ||
10:59, 26 January 2022 | 18 in CEBAF gun Hinged anode V2 with shift comparison.pptx (file) | 1.75 MB | 1 | ||
15:22, 15 November 2021 | 18 in CEBAF gun Mesh screen.pptx (file) | 3.33 MB | 1 | ||
15:18, 26 July 2021 | 18in gun anode studies.pptx (file) | 737 KB | 1 | ||
19:07, 19 July 2023 | 200 kV white tracking.png (file) | 49 KB | 1 | ||
13:27, 21 May 2018 | 200kV COMSOL upper shield.pdf (file) | 1.63 MB | 1 | ||
11:29, 10 January 2023 | 221220253.5.png (file) | 64 KB | 1 | ||
13:23, 21 May 2018 | 300kV COMSOL upper shields.pdf (file) | 2.86 MB | 1 | ||
10:43, 18 April 2023 | 500 kV project update April 2023.pptx (file) | 14.66 MB | 1 | ||
20:59, 12 February 2023 | 500 kV project update Feb 2023.pptx (file) | 2.64 MB | 1 | ||
11:27, 10 January 2023 | 500kV Summary Jan 2023.png (file) | 34 KB | 1 | ||
11:29, 2 October 2019 | Af ae.pdf (file) | 559 KB | 1 | ||
10:47, 8 June 2021 | BNL presentation Gabriel Palacios FINAL.pptx (file) | 36.37 MB | 1 | ||
10:24, 2 September 2022 | CIS-R30-3 slots SURVEYED CHECK crashed.pptx (file) | 925 KB | 1 | ||
13:00, 6 April 2022 | CIS-R30-3 slots TRACKING.pptx (file) | 2.45 MB | 1 | ||
12:59, 6 April 2022 | CIS-R30-3 slots potential for Joe.pptx (file) | 5.41 MB | 1 | ||
12:16, 27 February 2018 | COMSOL anode variation.pptx (file) | 3.96 MB | 1 | ||
15:11, 15 June 2018 | COMSOL corrected.pdf (file) | 2.56 MB | Corrections to the simulations for our paper on the shield. | 1 | |
13:06, 4 June 2018 | Capture.PNG (file) | 178 KB | GTS -300kV gun solved with CST electrostatics module (Does not take into account the conductivity) | 1 | |
13:07, 4 June 2018 | Capture close.PNG (file) | 178 KB | GTS -300kV gun solved for electrostatics only (No conductivity). Notice the upper triple point. | 1 | |
12:00, 4 June 2018 | Capture conductivity.PNG (file) | 189 KB | GTS -300kV gun solved with conductivity. Notice the Upper triple point. | 1 | |
12:12, 4 June 2018 | Capture conductivity close.PNG (file) | 115 KB | Same as above. Notice the tipple point. | 1 | |
15:23, 12 September 2019 | Cathodes particle tracking CST 1.pptx (file) | 3.79 MB | 1 | ||
13:18, 22 July 2019 | Ey difference for T-cathode and Small shield.PNG (file) | 51 KB | 1 | ||
10:32, 9 July 2018 | Field maps for the new CEBAF gun at 130 kV and 180 kV.pdf (file) | 1.3 MB | This file has a short explanation of the how the field maps for the new -200 kV CEBAF gun where generated (@-130 kV and -180 kV). | 1 | |
00:10, 14 March 2018 | GTS COMSOL 5.pdf (file) | 1.55 MB | This file compares the effect of a shed on the upper flange of the GTS 300 kV e-gun using COMSOL. | 1 | |
17:30, 27 March 2018 | GTS COMSOL 6.pdf (file) | 1.68 MB | Upper shed second version. | 1 | |
01:15, 4 April 2018 | GTS COMSOL 7.pdf (file) | 1.59 MB | Update of the GTS comsol simulations. This one includes a detailed description of how I get the field maps. | 1 | |
11:42, 5 June 2018 | GTS COMSOL 8.pdf (file) | 1.67 MB | Document with details on the Pierce geometry angle variations for the -300 kV GTS gun. | 1 | |
23:48, 17 June 2018 | GTS CST 1.pdf (file) | 2.13 MB | This file contains the results of the first attempt to simulate the GTS -300 kV p-gun in CST microwave studio. | 1 | |
13:51, 3 December 2018 | GTS GPT 1.pptx (file) | 4.04 MB | Outline: Is it the cathode-anode gap fields? Is it the photocathode fields? Maybe an elliptical beam? Is GPT doing something weird? Maybe the bunch charge? | 1 | |
12:44, 25 February 2019 | GTS GPT 2.pptx (file) | 592 KB | 5 | ||
07:55, 25 February 2019 | GTS GPT 3.pptx (file) | 566 KB | 1 | ||
16:27, 13 January 2020 | GTS gun model sumary.pdf (file) | 2.06 MB | 1 | ||
09:55, 15 September 2021 | GTS gun with CEBAF anode.pptx (file) | 2.06 MB | 4 | ||
09:54, 22 September 2021 | GTS gun with CEBAF anode Shields.pptx (file) | 5.2 MB | 2 | ||
11:01, 8 June 2021 | Grad student seminar ODU fall 2020 The Wien filter ANIMATED.pptx (file) | 20.18 MB | 1 | ||
15:17, 30 August 2018 | Guns CST 1.pptx (file) | 5.4 MB | This file contains the CST and GPT info for the T-shape, mushroom, small mushroom, sphere small anode 6cm gap, sphere long anode 6cm gap, sphere long anode 9cm gap. | 1 | |
14:31, 6 March 2019 | Guns CST 1 CORRECTED.pptx (file) | 4.64 MB | 1 | ||
08:36, 26 July 2021 | HV insulator-1st month.pptx (file) | 9.86 MB | 1 | ||
09:24, 13 October 2021 | HV pressure tests update.pptx (file) | 642 KB | 1 | ||
15:07, 25 April 2024 | IMG 0737.jpg (file) | 2.63 MB | 1 | ||
15:08, 25 April 2024 | IMG 0738.jpg (file) | 2.14 MB | 1 | ||
11:03, 8 June 2021 | IPAC 2021 poster slides final Gabriel Palacios.pptx (file) | 13.93 MB | 2 | ||
13:38, 21 June 2018 | Insulator inventory 06-21-18.pdf (file) | 617 KB | 1 | ||
11:18, 1 December 2022 | KEK SLAC JLAB meeting 200keVplus Wien Gabriel Palacios.pptx (file) | 20.96 MB | 3 | ||
08:48, 27 October 2021 | Mopab324(1).pdf (file) | 751 KB | 1 | ||
13:17, 11 July 2018 | New CEBAF gun CST 1.pdf (file) | 6.65 MB | 4 |