Difference between revisions of "UITC meeting minutes"
Jump to navigation
Jump to search
(163 intermediate revisions by 5 users not shown) | |||
Line 1: | Line 1: | ||
+ | '''2024''' | ||
+ | :[[media:handout from Nb3QCM unveiling ceremony.pdf]] | ||
+ | |||
+ | :[[media:Uttar's slides showing Nb3QCM performance from CMTF.pptx]] | ||
+ | |||
+ | :[[Tomasz's recommendation related to necessary modification of the UITF RF master oscillator to provide correct drive frequency to Nb3Sn coated cavity 1/4CM]] | ||
+ | |||
+ | :[[Rongli's slides related to the Nb3Sn coated cavity 1/4CM]] | ||
+ | |||
+ | :[[the next use of UITF - testing the Nb3Sn-coated cavity 1/4 cryomodule]] | ||
+ | |||
+ | '''2023''' | ||
+ | :[[media:injector upgrade SAD meeting at MCC 2_15_2023_rough schedule.docx]] | ||
+ | |||
+ | :[[media:injector upgrade - discussing the phase2 girder build.xls]] | ||
+ | |||
+ | :[[media:injector upgrade SAD meeting at MCC 1_10_2023_tasks in loose order.docx]] | ||
+ | |||
+ | :[[media:injector upgrade SAD meeting at MCC 1_10_2023_images of phase2 beamline.xls]] | ||
+ | |||
+ | '''2022''' | ||
+ | |||
+ | :[[media:220512_Wien_Mott.pptx|Coordination meeting to install U-Wien and Mott]] | ||
+ | |||
+ | :[[media:Dave Kashy's assessment of building 58 LCW system.pdf]] | ||
+ | |||
+ | :[[media:CTF plans for next 14 months - meeting minutes.docx]] | ||
+ | |||
+ | :[[media:Yan's latest summary of UITF measurements including energy spread.pptx]] | ||
+ | |||
+ | '''2021''' | ||
+ | :[[media:Max Tom and John study 6 MeV beam stability at CEBAF for comparison to UITF.pdf]] | ||
+ | |||
+ | :[[media:Tom Power's summary of microphonics study during beam tests in December 2021.docx]] | ||
+ | |||
+ | :[[media:Hannes' JLAAC talk on industrial applications of accelerators.pptx]] | ||
+ | |||
+ | :[[Xi's AccApp21 presentation on 1,4dioxane elimination]] | ||
+ | |||
+ | :[[media:UITF_Mysteries_20220112b.pdf|Max's momentum spread and optics studies]] | ||
+ | |||
+ | :[[media:Tomasz, Rama, Clyde and Curt authored a technote - JLAB-TN-21-012, “New CEBAF Booster Performance and Test”.pdf]] | ||
+ | |||
+ | :[[media:Yan's newest emittance and energy spread measurements.pptx]] | ||
+ | |||
+ | :[[Yan's previous booster assessments for reference]] | ||
+ | |||
+ | :[[media:Yan presents booster deflection, xy coupling and energy spread measurements.pptx]] | ||
+ | |||
+ | :[[media:Xi compares GPT model predictions and beam size measurements at viewers.pptx]] | ||
+ | |||
+ | :[[media:Sajini's GPT study related to photocathode position inside the electrode_GTS mag beam work.pdf]] | ||
+ | |||
+ | :[[media:20211007_uitf_optics.pdf|Quad scan inconsistencies]] | ||
+ | |||
+ | :[[media:20210930_uitf_plan.pdf|Suggested optics studies going forward]] | ||
+ | |||
+ | :[[media:thoughts on how to spend the next month at UITF with LHe_beam studies.docx]] | ||
+ | |||
+ | :[[to do list in preparation for water irradiation and final booster characterizations studies]] | ||
+ | |||
+ | :[[Fall Schedule Discussion]] | ||
+ | |||
+ | :[[media:UITF status report memo to Lab Leadership_June 2021.pdf]] | ||
+ | |||
+ | :[[media:Xi's assessment of viewer alignment at UITF.pdf]] | ||
+ | |||
+ | :[[media:Sunil Pokharel presentation_200 keV beam into Grigory's quarter CM with Nb3Sn coated cavities.pdf]] | ||
+ | |||
+ | :[[media:HDIce run2b summary_preliminary report.pdf]] | ||
+ | |||
+ | :[[media: Jonathan Creel's slides on CTF upgrade plans.pdf]] | ||
+ | |||
+ | :[[to do list for booster characterization and preparing for water irradiation experiment]] | ||
+ | |||
+ | :[[media:updated HDIce Run4 plan_i.e., what we actually did.pdf]] | ||
+ | |||
+ | :[[media:HDIce Run4 plan.pdf]] | ||
+ | |||
+ | :[[Reza's thoughts on bunchlength measurement at UITF]] | ||
+ | |||
+ | :[[Max's thoughts on QCM GSet calibration]] | ||
+ | |||
+ | :[[media: UITF stripline BPM study_John Musson 2_17_21.pdf]] | ||
+ | |||
+ | :[[UITF plans for coming weeks, months plus booster optics discussion]] | ||
+ | |||
+ | :[[media:Physics Division review of Andy's request for fourth run, so called run2b.pdf]] | ||
+ | |||
+ | :[[media:Joe's slides describing UITF 210211_160317_UITF_OpsReview_Grames_Redux.pptx]] | ||
+ | |||
+ | : Experimental Readiness Review web page for Wastewater Irradiation Experiment [[https://indico.jlab.org/event/431/]] | ||
+ | |||
+ | :[[media:Andy's request for run2b.pdf]] | ||
+ | |||
+ | :[[media: Marcy's molflo simulations imagining a beamline accident at HDIce.pptx]] | ||
+ | |||
+ | : experimental readiness review web page for HDIce [[https://clasweb.jlab.org/wiki/index.php/CLAS12_HD-Ice_ERR]] | ||
+ | |||
+ | :[[media:Alicia's booster simulations amended since 2016 version1.pptx]] | ||
+ | |||
+ | :[[media:Andy's P&C presentation HDIce at UITF summary.pdf]] | ||
+ | |||
+ | :[[media:Matt's P&C presentation UITF news.pptx]] | ||
+ | |||
+ | :[[media: Andy's presentation at Hall B 'roundtable' discussion_Run2 and 3 preliminary summary 1_6_21.pdf]] | ||
+ | |||
+ | '''2020''' | ||
+ | :[[media:HDIce status report 12_19_2020.pdf]] | ||
+ | |||
+ | :[[media:list of things to fix or improve at UITF.docx]] | ||
+ | |||
+ | :[[media:running log during run3.docx]] | ||
+ | |||
+ | :[[Booster LLRF test plan]] | ||
+ | |||
+ | :[[media:HDIce status report 12_13_2020.pdf]] | ||
+ | |||
+ | :[[media:HDIce status report 12_6_2020.pdf]] | ||
+ | |||
+ | :[[media:HDIce status report 12_2_2020.pdf]] | ||
+ | |||
+ | :[[media:P&C meeting December 4, 2020.pptx]] | ||
+ | |||
+ | :[[media:HDIce status report 11_29_2020.pdf]] | ||
+ | |||
+ | :[[media:HDIce status report 11_21_2020.pdf]] | ||
+ | |||
+ | :[[HDIce run3 control room staffing]] | ||
+ | |||
+ | :[[media:HDIce summary of run2.pdf]] | ||
+ | |||
+ | :[[media:HDIce status report 11_15_2020.pdf]] | ||
+ | |||
+ | :[[media:running log during run2.docx]] | ||
+ | |||
+ | :[[media:HDIce status report 11_8_2020.pdf]] | ||
+ | |||
+ | :[[media:HDIce status report 11_1_2020.pdf]] | ||
+ | |||
+ | :[[media:HDIce status report 10_25_2020.pdf]] | ||
+ | |||
+ | :[[media:P&C meeting October 27, 2020.pptx]] | ||
+ | |||
+ | :[[media:things to do between runs1 and 2.pdf]] | ||
+ | |||
+ | :[[media:HDIce status report ahead of run2.pdf]] | ||
+ | |||
+ | :[[media:HDIce status report end run1.pdf]] | ||
+ | |||
+ | :[[media:running log during run1.docx]] | ||
+ | |||
+ | :[[HDIce run1 and 2 schedule]] | ||
+ | |||
+ | :[[SRF and CRYO tasks related to replumbing the CTF, between runs 1 and 2]] | ||
+ | |||
+ | :[[media:P&C meeting September 28, 2020.pptx]] | ||
+ | |||
+ | :[[media:revised schedule for runs 2 and 3.docx]] | ||
+ | |||
+ | :[[media:UITF_HDIce schedule now through end of run3.docx]] | ||
+ | |||
+ | :[[media: HDIce run1 tasks and goals.pdf]] | ||
+ | |||
+ | :[[media: HDIce run 1, 2 and 3 schedules with LHe usage.pdf]] | ||
+ | |||
+ | :[[media:request to operate UITF.pdf]] | ||
+ | |||
+ | :[[media:summary of run0 highlights.docx]] | ||
+ | |||
+ | :[[media:running log during run0.docx]] | ||
+ | |||
+ | :[[tasks between run0 and run1]] | ||
+ | |||
+ | :[[HDIce to-do list, updated so Andy can respond to ERR findings]] | ||
+ | |||
+ | :[[UITF Operator Training ppt slides version 3_post SAF162 guinea pig session]] | ||
+ | |||
+ | :[[media:P&C meeting 3_17_2020.pptx]] | ||
+ | |||
+ | :[[UITF Operator Training ppt slides_draft]] | ||
+ | |||
+ | :[[UITF Meeting with Allison and others to discuss schedule HDIce tests 3_5_2020]] | ||
+ | |||
+ | :[[UITF Meeting - "schedule" commissioning plan through HDIce tests]] | ||
+ | |||
+ | :[[UITF Meeting - pre-run0 to do list]] | ||
+ | |||
+ | :[[media:P&C meeting 1_21_2020.pptx]] | ||
+ | |||
+ | :[[media:Dave Kashy's suggestion for heating the buncher.pdf]] | ||
+ | |||
+ | :[[UITF presentation at Wednesday scheduling meeting MCC: January 15, 2020]] | ||
+ | |||
+ | :[[UITF present status of FSDs January 9 2020]] | ||
+ | |||
+ | :[[UITF Meeting - January 3, 2020]] to do list for HDIce, work in progress | ||
+ | |||
'''2019''' | '''2019''' | ||
+ | :[[media:HDIce ERR report summary.pdf]] | ||
+ | |||
+ | :[[UITF permission to operate as an accelerator - December 4, 2019]] | ||
+ | |||
+ | :[[UITF Meeting - November 25, 2019]] HDIce computer support request to ACE | ||
+ | |||
+ | :[[UITF Meeting - November 18, 2019]] some things to do | ||
+ | |||
+ | :[[UITF Meeting - November 6, 2019]] HDIce ERR agenda and charge | ||
+ | |||
+ | :[[UITF Meeting - November 5, 2019 CATS items]] CATS items | ||
+ | |||
+ | :[[UITF Meeting - November 5, 2019]] MeV beamline update | ||
+ | |||
+ | :[[UITF Meeting - November 4, 2019]] bi-weekly meeting, engineering help for HDIce, and spectrometer work to install Brock pollarimeter | ||
+ | |||
+ | :[[UITF Meeting - October 28, 2019]] P&C meeting 10/28/2019 | ||
+ | |||
+ | :[[UITF Meeting - October 21, 2019]] to-do list again! | ||
+ | |||
+ | :[[HDIce dump magnet testing schedule: October 17, 2019]] | ||
+ | |||
+ | :[[HDIce tile removal predictions: October 9, 2019]] | ||
+ | |||
+ | :[[UITF status: October 8, 2019]] | ||
+ | |||
+ | :[[UITF Meeting with HDIce_modifications to beamline - July 18, 2019]] | ||
+ | |||
+ | :[[UITF Accelerator Readiness Review, summary of findings]] | ||
+ | |||
+ | : UITF Accelerator Readiness Review, June 26-28, 2019, visit the indico link: https://www.jlab.org/indico/event/322/timetable/#20190626 | ||
+ | |||
+ | :[[UITF Meeting - May 20, 2019]] to-do list again! | ||
+ | |||
+ | :[[UITF Meeting - May 6, 2019]] new tools | ||
+ | |||
+ | :[[UITF Meeting - May 2, 2019]] Meeting with HDice | ||
+ | |||
+ | :[[UITF Meeting - April 24, 2019]] UITF Management Self Assessment Conduct of Operations Review | ||
+ | |||
+ | :[[UITF Meeting - April 22, 2019]] P&C Meeting 4/22/2019 | ||
+ | |||
+ | :[[UITF Meeting - April 18, 2019]] Discussions with Team HDIce | ||
+ | |||
+ | :[[UITF Meeting - April 3, 2019]] shielding work update | ||
+ | |||
+ | :[[UITF Meeting - March 25, 2019]] P&C meeting 3/25/2019 | ||
+ | |||
+ | :[[UITF Meeting - March 20, 2019]] meeting with Shaun and HDIce | ||
+ | |||
:[[UITF Meeting - March 14, 2019]] organizing shielding work | :[[UITF Meeting - March 14, 2019]] organizing shielding work | ||
Line 5: | Line 253: | ||
:[[UITF Meeting - March 4, 2019]] Status update and to-do list for MeV beam line | :[[UITF Meeting - March 4, 2019]] Status update and to-do list for MeV beam line | ||
+ | |||
+ | :[[UITF Meeting - February 26, 2019]] P&C Meeting 2/26/2019 | ||
:[[UITF Meeting - February 20, 2019]] status and to-do list | :[[UITF Meeting - February 20, 2019]] status and to-do list |
Latest revision as of 15:37, 20 November 2024
2024
2023
2022
2021
- media:Sajini's GPT study related to photocathode position inside the electrode_GTS mag beam work.pdf
- Experimental Readiness Review web page for Wastewater Irradiation Experiment [[1]]
- experimental readiness review web page for HDIce [[2]]
2020
- UITF Meeting - January 3, 2020 to do list for HDIce, work in progress
2019
- UITF Meeting - November 25, 2019 HDIce computer support request to ACE
- UITF Meeting - November 18, 2019 some things to do
- UITF Meeting - November 6, 2019 HDIce ERR agenda and charge
- UITF Meeting - November 5, 2019 CATS items CATS items
- UITF Meeting - November 5, 2019 MeV beamline update
- UITF Meeting - November 4, 2019 bi-weekly meeting, engineering help for HDIce, and spectrometer work to install Brock pollarimeter
- UITF Meeting - October 28, 2019 P&C meeting 10/28/2019
- UITF Meeting - October 21, 2019 to-do list again!
- UITF Accelerator Readiness Review, June 26-28, 2019, visit the indico link: https://www.jlab.org/indico/event/322/timetable/#20190626
- UITF Meeting - May 20, 2019 to-do list again!
- UITF Meeting - May 6, 2019 new tools
- UITF Meeting - May 2, 2019 Meeting with HDice
- UITF Meeting - April 24, 2019 UITF Management Self Assessment Conduct of Operations Review
- UITF Meeting - April 22, 2019 P&C Meeting 4/22/2019
- UITF Meeting - April 18, 2019 Discussions with Team HDIce
- UITF Meeting - April 3, 2019 shielding work update
- UITF Meeting - March 25, 2019 P&C meeting 3/25/2019
- UITF Meeting - March 20, 2019 meeting with Shaun and HDIce
- UITF Meeting - March 14, 2019 organizing shielding work
- UITF Meeting - March 12, 2019 updated to-do list
- UITF Meeting - March 4, 2019 Status update and to-do list for MeV beam line
- UITF Meeting - February 26, 2019 P&C Meeting 2/26/2019
- UITF Meeting - February 20, 2019 status and to-do list
- UITF Meeting - February 13, 2019 Meeting with HDIce
- UITF Meeting - February 11, 2019 MeV beam to-do list
- UITF Meeting - January 23, 2019 Meeting with HDice: Double Dump details, Harp size
- UITF Meeting - January 14, 2019 P&C Meeting slides January 2019
- UITF Meeting - January 8, 2019 On going discussion related to shielding, a to-do list
- UITF Meeting - January 7, 2019 More discussions related to the North Wall and extra shielding
2018
- UITF Meeting - December 12, 2018 Uses of UITF
- UITF Meeting - December 5, 2018 Keith Welch's observation and thoughts on accident scenarios, part of our on-going discussion related to PSS-BCM and shielding
- UITF Meeting - November 26, 2018 P&C meeting, Andy presents a UITF/HDIce run schedule
- UITF Meeting - November 20, 2018 Shielding options for Cave2 north wall
- UITF Meeting - November 13, 2018 PSS BCM "specifications" documents
- UITF Meeting - November 7, 2018 MeV spreadsheet of components, Haimson inventory, MAT corrector inventory
- UITF Meeting - October 31, 2018 (HDice) Double Dump discussion
- UITF Meeting - October 15, 2018 P&C meeting slides
- UITF Meeting - August 29, 2018 With HDIce Group
- UITF Meeting - August 15, 2018 With HDIce Group
- UITF Meeting - August 13, 2018 P&C slides
- UITF Meeting - June 15, 2018 Meeting with Patrizia, experimental readiness review?
- UITF Meeting - June 12, 2018 Draft documents UITF Operations Directive, Bob's draft UITF ARR, and Bob's summary comments
- UITF Meeting - June 6, 2018 HDIce mechanical design discussion
- UITF Meeting - June 3, 2018 to-do list
- UITF Meeting - March 11, 2018 Cave drawing showing trenches and notes for Vashek to calculate shielding requirements near trenches
- UITF Meeting - March 10, 2018 The QCM was cooled to 4K on April 6 and then pumped down to 2K on April 9. Temperatures, pressure and liquid level look good: https://logbooks.jlab.org/entry/3557428
- UITF Meeting - March 12, 2018 to-do list, preparing to cool QCM and add RF
- UITF Meeting - March 2, 2018 details related to QCM commissioning
- UITF Meeting - February 26, 2018 to-do list
- UITF Meeting - February 12, 2018 to-do list
- UITF Meeting - February 9, 2018 Parts count discussion, MeV beamline
- UITF Meeting - February 8, 2018 Discuss plans to cool the QCM and apply high power RF, but no beam acceleration
- UITF Meeting - January 29, 2018 We have 200 keV Viewer limited beam! Updates from RF and from Cryo on QCM, Chopper being conditioned
- UITF Meeting - January 24, 2018 UITF ME weekly meeting
- UITF Meeting - January 19, 2018 UITF choppers + comments on UITF MPS/FSD system
- UITF Meeting - January 9, 2018 Where Trent left the PSS BCM proposal before his departure
2017
- UITF Meeting - December 18, 2017 Gun conditioned to 200 kV in vacuum. Beam line ready for beam?
- UITF Meeting - December 4, 2017 Gun HV conditioning in progress, made a cathode and preparing beam line for keV beam operations
- UITF Meeting - November 6, 2017 preparing for keV beam operations
- UITF Meeting - April 10, 2017 budget status
- UITF/SRF Meeting - March 24, 2017 SRF cleaning 4kxx beamline
- UITF Meeting - February 1, 2017 Editing the keV OSP
2016
- UITF Meeting - October 21, 2016 UITF and CEBAF PSS BCM mini-review
- UITF Meeting - October 20, 2016 Meeting with Mont, HDIce schedule
- UITF Meeting - October 10, 2016 Meeting with Service Providers, FY17 budget estimate
- UITF Meeting - August 16, 2016 Meeting with Mont, UITF PSS BCM discussion meeting minutes, CEBAF PSS BCM technote
- UITF Meeting - August 1, 2016 UITF Engineering Meeting
- UITF Meeting - July 14, 2016 Group meeting - keV beamline vacuum status
- UITF Meeting - July 12, 2016 Meeting with Mont
- UITF Meeting - June 15, 2016 Work coordination - the new quarter cryomodule
- UITF Meeting - May 19, 2016 PSS BCM discussion
- UITF Meeting - May 17, 2016 Meeting with Mont
- UITF Meeting - May 10, 2016 Internal Safety Review
- UITC Meeting - April 12, 2016 Meeting with Mont
- UITF Meeting - March 18, 2016 UITF Ops Review
- UITF Meeting - March 15, 2016 Meeting with Mont
- UITF Meeting - March 7, 2016 Provide overview to EES, show schedule, MPS discussion
- UITF Meeting - February 29, 2016 imagining ops with macropulse beam
- UITC Meeting - February 23, 2016 Meeting with Mont + parts list + cost estimates for helium
- UITC Meeting - February 19, 2016 Discuss different aspects of new 1/4 CM at UITF
- UITC Meeting - February 1, 2016 HDIce talk to Hall B Users
- UITC Meeting - January 29, 2016 Revised schedule
- UITC Meeting - January 27, 2016 ME Meeting
- UITC Meeting - January 19, 2016 Meeting with Mont
- UITC Meeting - January 14, 2016 Discuss cost estimate "deltas" with Engineering and Kelly Webster
- UITC Meeting - January 4, 2016 HDIce meeting
2015
- UITC Meeting - December 21, 2015 Meeting with Mont
- UITC Meeting - December 15, 2015 Meeting with HDice Group
- UITC Meeting - December 14, 2015 Nuts and Bolts
- UITC Meeting - December 10, 2015 a revised global schedule and cost estimate
- UITC Meeting - November 23, 2015 Monthly meeting with Mont, re-scoping UITF, month by month costs estimate revisited
- UITC Meeting - November 9, 2015 Meeting with BNL gun group
- UITC Meeting - October 26, 2015 Meeting with Team HDIce, ODH source term discussion
- UITC Meeting - October 21, 2015 Monthly Meeting with Mont, month by month cost estimate, P&C meeting slides
- UITC Meeting - October 12, 2015 Meeting with HDIce Folks (status of project)
- UITC Meeting - October 8, 2015 Final top-of-cave electrical requirements
- UITC Meeting - October 1, 2015 ODH discussion
- UITC Meeting - August 31, 2015 Discuss electrical requirements above cave + Meeting with HDIce, target dimensions and transfer line discussion + Mont meeting
- UITC Meeting - August 24, 2015 rack layout, utility layout
- UITC Meeting - August 17 part2, 2015 HDIce beamline design talking points
- UITC Meeting - August 17, 2015 Electronics rack discussion
- UITC Meeting - August 12, 2015 ME meeting
- UITC Meeting - August 10, 2015 nuts and bolts to do list
- UITC Meeting - August 5, 2015 ODH discussion
- UITC Meeting - August 3, 2015 An example of ODH assessment - the CMTF
- UITC Meeting - July 31, 2015 Meeting with Mont
- UITC Meeting - July 27, 2015 Status report and update
- UITC Meeting - July 8, 2015 Meeting with EHS&Q
- UITC Meeting - June 22, 2015 Meeting with Engineering
- UITC Meeting - June 12, 2015 1/4 cryomodule discussion with Ops and SRF
- UITC Meeting - June 9, 2015 GTS discussion with Danny
- UITC Meeting - June 8, 2015 (eHD) Raster position/power, global schedule discussion, quantitative assessment of in-house solenoids
- UITC Meeting - June 5, 2015 Cryomodule considerations
- UITC Meeting - June 3, 2015 May 14, 2015 ME model + optics, Wien, buncher
- UITC Meeting - May 18, 2015 Slides presented to Mont, UITF cost update, entry/exit geometries
- UITC Meeting - May 12, 2015 Estimating network and computer control costs
- UITC Meeting - April 27, 2015 Warm beamline design, stairs, parts count update
- UITC Meeting - April 1, 2015 Mechanical Meeting and Meeting with I&C/Magnets Folks to discuss parts count
- UITC Meeting - March 25, 2015 Mechanical Meeting
- UITC Meeting - March 23, 2015 Layout and parts-list discussion
- UITC Meeting - March 16, 2015 UITF to do list, link to old engineering service providers
- UITC Meeting - March 13, 2015 Matt presentation at P&C meeting + two revised schedules
- UITC Meeting - March 9, 2015 Alex optics model presentation, ver 2
- UITC Meeting - February 16, 2015 parts list discussion
- UITC Meeting - February 13, 2015 Poelker P&C Meeting slides
- UITC Meeting - January 26, 2015 update the to-do list
- UITC Meeting - January 22, 2015 Follow meeting with Cryo
- UITC Meeting - January 20, 2015 Rebecca's Facilities Schedules, old and new. Walt's schedule
- UITC Meeting - January 16, 2015 Talks by Poelker and W. Akers at Planning and Coordination meeting
- UITF Meeting - January 15, 2015 Meeting minutes with RF guys
- UITC Meeting - January 12, 2105 Continue LHe discussion, Mike Lowry's HDIce alternate beamline layouts
2014
- UITC Meeting - December 22, 2014 Joe Grames optics, Facilities revised schedule
- UITC Meeting - December 16, 2014 Orientation of old and new 1/4CM inside the cave, and notes re: LHe supply/return cans
- UITC Meeting - December 15, 2014 Optics discussion, beamline mechanical layout, Walt's Cave2 proposal
- UITC Meeting - December 12, 2014 Subset of UITF team meets with Andrew and "Service Providers"
- UITC Meeting - December 8, 2014 WBS assessment, discuss Walt's new cave layout, Mike Lowry's first HDIce beamline layout
- UITC Meeting - December 1, 2014 concrete block inventory
- UITC Meeting - November 3, 2014 g4beamline modeling raster + solenoid
- UITC Meeting - October 27, 2014 Raster Discussion
- UITC Meeting - Oct 13, 2014 Big Picture
- UITC Meeting - Oct 6, 2014 Nuts and Bolts
- UITC Meeting - September 29, 2014 Big Picture: nanoamp BPMs and modeling discussion
- UITC Meeting - Septmeber 22, 2014 Nuts and Bolts: Optics and Mechanical model developments
- UITC Meeting - Septmeber 15, 2014 Beamline discussion continued
- UITC Meeting - September 8, 2014 Yan Wang's thesis proposal
- UITC Meeting - August 25, 2014 Nuts and Bolts (to-do list for both guns, Test Cave and GTS)
- UITC Meeting - August 18, 2014 Big Picture (RF systems discussion with Tom and Curt)
- UITC Meeting - August 4, 2014 Big Picture (Hari's proposal for safety system,
- UITC Meeting - July 28, 2014 Nuts and Bolts (1497 MHz Chopper assessment, Discuss beamline design, shed design, Engineering labor estimate, GTS gun sans light box)
- UITC Meeting - July 21, 2014 Big Picture (Discussion with Tom Renzo of Facilities)
- UITC Meeting - July 14, 2014 Nuts and Bolts (more odds and ends, including GTS "to do" list)
- UITC Meeting - July 7, 2014 Big Picture (invitee Pavel Evtushenko discussion on beamline diagnostics + beamline layout gun to HDIce target)
- UITC Meeting - June 30, 2014 Nuts and Bolts Test Cave and GTS (odds and ends discussion for both beamlines)
- UITC Meeting - June 23, 2014 Big Picture (350kV beamline discussion, schedule v1)
- UITC Meeting - June 16, 2014 Nuts & Bolts
- UITC Meeting - June 9, 2014 Big Picture (Engineering and Facilities Kick OFF meeting at MCC)
- UITC Meeting - June 2, 2014 Nuts & Bolts (DS and chopper comments)
- UITC Meeting - May 20, 2014 Beam line layout discussion continued
- UITC Meeting - May 12, 2014 Beam line layout discussion
- UITC Meeting - May 5, 2014 (Topic - drawings, basic layout and specs table)
- UITC Meeting - March 26, 2014 (Topic - Injector Magnets)
- UITC Meeting - February 14, 2014 (Topic - Task List)
- UITC Meeting - February 7, 2014 Hari's proposal to Lab management that led to approval